Search results

1 – 10 of 784
Article
Publication date: 14 September 2023

Gong Yunpeng and Umer Zaman

The traditional Chinese culture has always emphasized the authority of leaders and their “top-down” influence over subordinates tangled with “bottom-up” management. Paternalistic…

Abstract

Purpose

The traditional Chinese culture has always emphasized the authority of leaders and their “top-down” influence over subordinates tangled with “bottom-up” management. Paternalistic leadership can both nurture and restrict growth in mega-construction projects, due to the unique consequences (i.e. positive vs negative implications) for project teams. Hence, the present study aimed to explore the impact of paternalistic leadership (PL), team members’ voice (TMV) and team resilience (TR) on the mega-construction project success (MPS) in China's Belt and Road Initiative (BRI).

Design/methodology/approach

A surveyed-based sample of project professionals (N = 563) directly linked with the BRI was employed for statistical estimations with partial least squares (PLS) structural equation modeling (SEM).

Findings

Paternalistic leadership styles, including authoritarian leadership (AL), moral leadership (ML) and benevolent leadership (BL), significantly influence the mega-construction project success in BRI. The findings empirically validated that both BL and ML increase the likelihood of mega-construction project success. However, AL could impose a threat through its underlying negative influence. In addition, leaders with benevolence and morality have a positive influence on TMV and TR, while leaders with authoritarianism signal a negative impact. Furthermore, both TMV and TR significantly and positively mediate the relationships between AL-MPS (Model-1), BL-MPS (Model-2) and ML-MPS (Model-3), respectively.

Originality/value

The present study is a groundbreaking endeavor that fills a crucial research gap by investigating mega-construction project success in the BRI through paternalistic leadership, project team members' voice and team resilience in a multi-mediation model. These novel findings offer valuable strategic insights for managing mega-construction projects in countries with paternalistic solid cultural foundations, enabling project managers to navigate cultural nuances and optimize megaproject outcomes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 March 2022

Umer Zaman, Laura Florez-Perez, Mahwish Anjam, Muddasar Ghani Khwaja and Noor Ul-Huda

Failures in both followership and leadership become inevitable as mega construction projects are directed and controlled by toxic leaders. Consequently, team member's desire for…

1649

Abstract

Purpose

Failures in both followership and leadership become inevitable as mega construction projects are directed and controlled by toxic leaders. Consequently, team member's desire for knowledge hoarding silence is triggered and goal alignment between the leader and team members suddenly fades away to realize success in mega projects. Considering the growing importance of these rarely examined constructs and fragmented literature on toxic leadership (TL), team silence and mega project success (PS) in the global construction industry, the present study aimed to examine the effects of TL and project team member's silence (PTMS) on the success of mega construction projects. Moreover, the mediating influence of PTMS to link TL and mega construction PS has also been explored.

Design/methodology/approach

Drawing on survey data of 326 project professionals directly associated with mega construction projects worth US$62bn under the China–Pakistan Economic Corridor (CPEC), the conceptual model was tested with covariance-based structural equation modeling (CB-SEM) using Mplus program. Scales were adapted from previous research to measure TL (with its five-dimensions including abusive supervision, authoritarian leadership, self-promotion, narcissism and unpredictability), PS (with its three-dimensions including project management success, project ownership success and project investment success) and project team members' silence. Reflective–formative second order assessments were specifically applied to measure the multi-dimensional nature of TL and PS, respectively.

Findings

Mplus estimations revealed that TL negatively influences PS, besides forcing a culture of silence among project team members. Interestingly, the relationship between TL and PS is also negatively mediated by the PTMS.

Research limitations/implications

The present study's findings are derived from data of project professionals (N = 326) to examine success in megaprojects under the CPEC. Hence, these findings may be re-validated through future studies on similar megaprojects (e.g. China's Belt and Road Initiative (BRI) worth US$8tn) that may also be predicated by TL tendencies, silent cultures and high-stakes involved to seize PS.

Practical implications

Policymakers, construction practitioners and other key stakeholders (e.g. departmental heads/supervisors) can take advantage of this new evidence to better interpret the success paradox in mega projects, and to reduce the spread and long-term damage of TL on team members and eventually create opportunities for PS.

Originality/value

The present study's novelty is manifested within this first empirical evidence on TL that breeds team silence in underperforming mega projects. Notably, present study offers alarming evidence on mega projects that can be easily derailed from success, as they continue to suffer from team silence and TL.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 December 2021

Koorosh Gharehbaghi, Kerry McManus, Maged Georgy, Ken Farnes, Francesca Pagliara and Matt Myers

Through the significance matrix, this paper aims to investigate and explore the main sustainability factors of mega transportation infrastructure projects. Sydney’s Metro mega…

Abstract

Purpose

Through the significance matrix, this paper aims to investigate and explore the main sustainability factors of mega transportation infrastructure projects. Sydney’s Metro mega transportation infrastructure is used as a case study. Sydney’s Metro was selected because of its sustainability challenges faced because of the areas’ diverse ecological zones. Sydney’s Metro is thus examined as the basis of best practice for the determination of the sustainability factors of transportation infrastructures.

Design/methodology/approach

Using the significance matrix as a methodology, this research evaluates the environmental impact assessment and environmental assessment processes, to alleviate the problems of the mega transportation infrastructure.

Findings

This research found that a more comprehensive determination is needed to further analyse the sustainability factors of mega transportation infrastructures, use of a significance matrix would further assess the environmental complexities of mega transportation infrastructures and the sustainability factors of mega transportation infrastructures should include a nonlinear and asymmetrical scheme highlighting its components and carefully outlining its integration and consolidation.

Originality/value

Although there is concurrent research into sustainability factors of mega transportation, this paper undertakes a new methodology for such infrastructure. While the significance matrix is not a new concept, it has never been used specifically for mega transportation infrastructure. Subsequently, using the significance matrix as a methodology, this research undertakes such environmental analysis and assessment and thus produces a qualitative risk analysis matrix. The findings from this research will ultimately assist the key stakeholders of mega transportation infrastructures to better plan, monitor and support similar projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 May 2023

Yulong Li, Ziwen Yao, Jing Wu, Saixing Zeng and Guobin Wu

The numerous spoil grounds brought about by mega transportation infrastructure projects which can be influenced by the ecological environment. To achieve better management of…

Abstract

Purpose

The numerous spoil grounds brought about by mega transportation infrastructure projects which can be influenced by the ecological environment. To achieve better management of spoil grounds, this paper aims to assess their comprehensive risk levels and categorize them into different categories based on ecological environmental risks.

Design/methodology/approach

Based on analysis of the environmental characteristics of spoil grounds, this paper first comprehensively identified the ecological environmental risk factors and developed a risk assessment index system to quantitatively describe the comprehensive risk levels. Second, this paper proposed a comprehensive model to determine the risk assessment and categorization of spoil ground group in mega projects integrating improved projection pursuit clustering (PPC) method and K-means clustering algorithm. Finally, a case study of a spoil ground group (includes 50 spoil grounds) in a mega infrastructure project in western China is presented to demonstrate and validate the proposed method.

Findings

The results show that our proposed comprehensive model can efficiently assess and categorize the spoil grounds in the group based on their comprehensive ecological environmental risk. In addition, during the process of risk assessment and categorization of spoil grounds, it is necessary to distinguish between sensitive factors and nonsensitive factors. The differences between different categories of spoil grounds can be recognized based on nonsensitive factors, and high-risk spoil grounds which need to be focused more on can be identified according to sensitive factors.

Originality/value

This paper develops a comprehensive model of risk assessment and categorization of a group of spoil grounds based on their ecological environmental risks, which can provide a reference for the management of spoil grounds in mega projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 February 2024

Runze Yu and Li Ma

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has…

134

Abstract

Purpose

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has greatly affected human life. The research aims to establish a risk evaluation index system for MICSC in EPC projects, exploring what risk factors lead to risk incidents and measure the importance and causality of all these risk factors.

Design/methodology/approach

The research applies a combination of quantitative and qualitative analysis methodology to process data sequentially. In the first place, risk factors for MICSC in EPC projects are extracted and identified from literature survey and expert interviews. In the second place, an integration model fuzzy Analytic Hierarchy Process (f-AHP) and fuzzy Decision-making Trial and Evaluation Laboratory (f-DEMATEL) is constructed to comprehensively analyze all these risk factors.

Findings

12 primary risk factors and 36 secondary risk factors comprise the risk evaluation index system for MICSC in EPC projects from 178 literature and 5 professionals. The results indicate that Political Situation (F1), Social Security (F2) and Management Mode (F8) are critical risk factors, where F1 and F2 are cause factors and F8 is an effect factor.

Originality/value

There are three main contributions of this paper. First and foremost, from the perspective of the research content, no other study has been able to assess risk factors for MICSC in EPC projects, while embedding nine phases of the whole project life cycle and six subjects of stakeholders into a risk evaluation index system. Additionally, from the perspective of research method, a combined model incorporating f-AHP and f-DEMATEL is constructed to avoid the one-sidedness of a single model. Last but not least, from the perspective of practical significance, focusing on the critical risk factors, a series of effective measures are formulated to make appropriate management decisions for nodal enterprises of MICSC, which can improve their risk management capabilities.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 December 2023

Tiep Nguyen, Leonie Hallo and Indra Gunawan

The purpose of this paper is to rank critical risks and determine major categories of risks to be considered by public–private partnerships (PPPs) investors when investing in…

Abstract

Purpose

The purpose of this paper is to rank critical risks and determine major categories of risks to be considered by public–private partnerships (PPPs) investors when investing in “smart” transportation infrastructure. Such investment is sorely needed in many mega cities around the world currently suffering from serious impacts of traffic congestion, pollution and lack of usability of transport systems.

Design/methodology/approach

The study used literature review focused upon smart transportation infrastructure projects financed by PPP arrangements to create a questionnaire which was refined by subject matter experts and then completed by 126 experienced respondents. Exploratory factor analysis was used to create major categories emerging from the collected data. Interviews with ten experts were used to validate the findings.

Findings

The most highly major ranked risks shared by these participants were lack of expertise in complex project implementation, political interference, lack of PPP project data and lack of a collaboration mechanism between government and private sectors. Factor analysis showed that in terms of risk likelihood, stakeholder engagement, implementation process issues, the natural environment, data-sharing and technology complexity emerged. In terms of risk impact, major factors were stakeholder engagement, trust versus resistance issues, the natural environment and factors concerning uncertainty.

Originality/value

This paper addresses a somewhat unexplored area, the risks involved in investing in PPP smart transportation infrastructure. Such infrastructure projects are embedded in their environments, and approaches using a complexity lens can emerge overriding risk concerns for investors when undertaking such projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 19 June 2023

Jose Oliveros-Romero and Ajibade A. Aibinu

This study aims to develop an ex-post impact evaluation method for public-private partnership projects (PPP) that addresses one of its main difficulties: the multiplicity of…

Abstract

Purpose

This study aims to develop an ex-post impact evaluation method for public-private partnership projects (PPP) that addresses one of its main difficulties: the multiplicity of perspectives and stakeholders that exist in these projects.

Design/methodology/approach

This study first developed a conceptual evaluation framework called ‘Project Success Evaluation Pyramid Model’ (PSEPM) that was designed using a Design Science approach. Second, an impact evaluation method was designed based on the PSEPM. This evaluation method was tested and refined using three PPP projects. This article presents the refined conceptual model PSEPM, the evaluation method and one of the three tests: the PPP toll road.

Findings

The impact evaluation method describes how to evaluate the impact of an existing mega project from the perspective of multiple stakeholders and isolate the impact of the procurement method. Its application in practice is demonstrated with a PPP toll road project in Chile, in which 11 stakeholders were identified. Issues such as city segregation, deficient business model, the relevance of infrastructure availability, and deficient service-fee strategy were identified in the project. The evaluation method provides a judgement about the use of the PPP procurement method and about the overall impact of the project, reconciling the stakeholder perspectives.

Originality/value

The use of this approach could give greater clarity and legitimacy to the discussion over the use of PPPs by evaluating existing projects beyond the use of traditional time and cost measurements. Its originality is the systematic recognition and identification of stakeholder motives, purposes, and judgements over a project.

Details

Built Environment Project and Asset Management, vol. 13 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 8 March 2022

Diana Ominde, Edward G. Ochieng and Vincent O. Omwenga

The aim of this study was to appraise the delivery of information communication technology (ICT) projects and identify key determinants for stakeholder integration.

Abstract

Purpose

The aim of this study was to appraise the delivery of information communication technology (ICT) projects and identify key determinants for stakeholder integration.

Design/methodology/approach

Given that empirically, little was known about stakeholder integration in the ICT sector and its influence or effect on project delivery; qualitative method was used. Forty-seven semi-structured interviews were carried out to derive senior project practitioners and policymakers' constructs of stakeholder integration and infrastructure performance improvement of ICT projects. The verification and validation of the proposed assessment tool were achieved through the use of focus group discussion.

Findings

As established in this research study, there is a need for project delivery teams to evaluate the level of stakeholder integration, the formulation of a project business case, the project processes and issues of compliance and regulation in ICT projects. What is evident in the findings of the study is that the management model adopted for the stakeholders in the Kenyan ICT sector ought to make communication the fulcrum of their engagement.

Originality/value

The inferences made herein are critical in contributing to knowledge regarding the ICT infrastructure project management terrain in developing countries. There is evidence in the study to conclude that the concept of stakeholder management and integration has implications for the sustainability of ICT projects. One of the issues that predominantly featured in the research was the input of stakeholder integration in terms of project sustainability.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 7
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 20 June 2023

Geoffrey Mark Ferres and Robert C. Moehler

Effective project learning can prevent projects from repeating the same mistakes; however, knowledge codification is required for project-to-project learning to be up-scaled…

Abstract

Purpose

Effective project learning can prevent projects from repeating the same mistakes; however, knowledge codification is required for project-to-project learning to be up-scaled across the temporal, geographical and organisational barriers that constrain personalised learning. This paper explores the state of practice for the structuring of codified project learnings as concrete boundary objects with the capacity to enable externalised project-to-project learning across complex boundaries. Cross-domain reconceptualisation is proposed to enable further research and support the future development of standardised recommendations for boundary objects that can enable project-to-project learning at scale.

Design/methodology/approach

An integrative literature review method has been applied, considering knowledge, project learning and boundary object scholarship as state-of-practice sources.

Findings

It is found that the extensive body of boundary object literature developed over the last three decades has not yet examined the internal structural characteristics of concrete boundary objects for project-to-project learning and boundary-spanning capacity. Through a synthesis of the dispersed structural characteristic recommendations that have been made across examined domains, a reconceptualised schema of 30 discrete characteristics associated with boundary-spanning capacity for project-to-project learning is proposed to support further investigation.

Originality/value

This review makes a novel contribution as a first cross-domain examination of the internal structural characteristics of concrete boundary objects for project-to-project learning. The authors provide directions for future research through the reconceptualisation of a novel schema and the identification of important and previously unidentified research gaps.

Details

International Journal of Managing Projects in Business, vol. 16 no. 4/5
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 27 November 2023

Junwei Zheng, Yu Gu, Peikai Li, Lan Luo and Guangdong Wu

The development of project managers and leadership has been highlighted as crucial for improving project success and performance, resulting in a rise of interest in project…

Abstract

Purpose

The development of project managers and leadership has been highlighted as crucial for improving project success and performance, resulting in a rise of interest in project leadership research over the last two decades. While several qualitative reviews have been conducted, there have been limited quantitative and systematic reviews on project leadership. This study fills this gap by portraying the knowledge landscape and tracking the evolution of project leadership research from 1998 to 2022 through bibliometric approaches.

Design/methodology/approach

Based on 816 records, including 793 articles extracted and selected from the Web of Science database and specific journals, and 23 articles selected from three non-SCI/SSCI indexed journals, the authors used CiteSpace and bibliometrix R-package to depict visualizations of the trajectory of co-cited references, the landscape of co-occurred keywords and emerging trends in project leadership via reference co-citation analysis, keyword co-occurrence analysis and thematic mapping.

Findings

The bibliometric analyses enabled the authors to understand the conceptual aspects of project leadership and its theoretical background. Three stages of the intellectual bases were identified and tracked: the infancy phase (1998–2007), the growth phase (2008–2014) and the new development phase (2015–2022). The results of keyword co-occurrence analysis indicated that the research focus evolved from investigating traits and competences to examining the effects of traditional leadership behaviors, and then considering context-specific leadership. The findings of thematic mapping and theoretical interpretation illustrate the potential directions of the competence comparison, new and appropriate leadership, and the interaction between leadership and context.

Originality/value

This study advanced the field by providing a systematic review of project leadership, developing potential future directions for project leadership research and providing practical implications for career development and training.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 784