Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 23 November 2023

Muhammad Saiful Islam

After the fall of Burma on 10 March 1942 the British government extensively implemented scorched-earth policies in Bengal like denial of rice and boats. The British government had…

Abstract

Purpose

After the fall of Burma on 10 March 1942 the British government extensively implemented scorched-earth policies in Bengal like denial of rice and boats. The British government had inadequate defense equipment to resist Japanese attack in Bengal. After the Japanese invasion supply of Burmese rice suddenly stopped. Faridpur district used to import rice from Burma. The Burmese conquest created an immediate and serious crisis for several rice imported districts and coastal districts of Bengal. Hence, none of the districts of East Bengal could escape its brutal clutches and severity recorded in Chittagong, Dhaka, Faridpur, Tripura, Noakhali, Bakargonj and so on.

Design/methodology/approach

Among the affected districts of Bengal, Faridpur has been chosen as study area due to severity of famine. This study addresses the famine scenario of Faridpur. Data has been collected from primary and secondary sources. Content Analysis Research method is used to test reliability and validity of the data. Historical Analysis Research method has been followed in this study.

Findings

Finding of the study shows that the government relief issues, ignorance of warnings, political nepotism and denial policy of British government intensified the famine of Faridpur district. The wartime tactics adopted by the colonial government aggravated the famine situation. This article has shed light on the government war time policy, activity and some impacts of British decline in Burma that fueled the famine in Faridpur district.

Originality/value

This study is my original research work and has not been published else where.

Details

Southeast Asia: A Multidisciplinary Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1819-5091

Keywords

Article
Publication date: 9 April 2024

Md. Saiful Alam and Dewan Mahboob Hossain

The purpose of this research is to investigate how different accountability practices might be observed in the annual reports of non-government organisations (NGOs) in…

Abstract

Purpose

The purpose of this research is to investigate how different accountability practices might be observed in the annual reports of non-government organisations (NGOs) in Bangladesh. The study further aims to understand whether such accountability disclosures support NGO legitimacy in Bangladesh and if so, in what form.

Design/methodology/approach

To fulfil this objective, a content analysis was conducted on the annual reports of 24 selected leading NGOs operating in Bangladesh. The data were then analysed through the not-for-profit accountability framework of Dhanani and Connolly (2012). Theoretical constructs of legitimacy were further mobilised to corroborate the evidence.

Findings

It was found that NGOs operating in Bangladesh discharged all four types of accountability, i.e., strategic, fiduciary, financial and procedural (Dhanani and Connolly, 2012) through annual reports. The findings further suggested that carrying out these accountabilities supported the legitimation process of NGOs. Moreover, we found that NGOs took care of the needs of both primary and secondary stakeholders although they widely used self-laudatory positively charged words to disclose information about their accountabilities.

Originality/value

The study contributes to the limited accounting research on the public disclosures of NGOs and not-for-profit firms particularly in emerging economy settings. Also, we contribute to the limited research on the accountability-legitimacy link of NGOs evident in public disclosures like annual reports.

Details

Journal of Accounting in Emerging Economies, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-1168

Keywords

Open Access
Article
Publication date: 21 April 2022

Md. Saiful Alam

This paper aims to examine the Islamic accounting research. In particular, the paper extensively investigates the literature on Islamic accounting to understand the issues…

4200

Abstract

Purpose

This paper aims to examine the Islamic accounting research. In particular, the paper extensively investigates the literature on Islamic accounting to understand the issues, contexts, methods and theoretical paradigms thereof.

Design/methodology/approach

The study has adopted a literature review approach. It has examined the key journal publications for 30 years in accounting discipline and systematically identified the Islamic accounting papers during 1990–2020. In total, 95 papers were identified until June 2020, and they were thoroughly reviewed to identify the relevant issues, contexts, methods and theoretical paradigms.

Findings

The study has found that Islamic accounting papers covered issues of both Islamic organizations (e.g. Islamic financial institutions) and of Muslim countries. The key issues include the regulation and regulatory compliance, annual report disclosures, corporate and Islamic governance, accounting profession, gender, accountability matters, management accounting and control, waqf accounting and zakat management. The study has also observed various normative guidelines from the academics on how the teaching of Islam is enacted in accounting, accountability and governance matters to attain the maqasid al-shari'a, i.e. human welfare, social justice and equity.

Research limitations/implications

The study is not empirical. Hence, the limitations of literature review papers are applicable in this case. Moreover, it is possible that this study could not identify some of the important literature on Islamic accounting (such as the papers published in Arabic by the academicians and professionals of Arab world).

Practical implications

The study enables both Islamic accounting academics and practitioners to identify the main Islamic accounting issues and realize the importance of Islamic accounting.

Social implications

When the author considers Islamic accounting as a social construction and tries to understand the phenomenon through social theories, the author acknowledges the relevance of Islamic accounting in the society in which it operates. It can be noticed from the discussion that Islamic accounting emphasizes on social welfare, balance, equity and providing relevant information to follow the commandments of God.

Originality/value

To the best of the author’s knowledge, this study is the first to provide a synoptic view on the issues, context, methods and theoretical paradigms of Islamic accounting, while covering major accounting journals in 30 years.

Details

PSU Research Review, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2399-1747

Keywords

Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 29 December 2023

Md Safiullah, Muhammad Nurul Houqe, Muhammad Jahangir Ali and Md Saiful Azam

This study investigates the association between debt overhang and carbon emissions (both direct and indirect emissions) using a sample of US publicly listed firms.

Abstract

Purpose

This study investigates the association between debt overhang and carbon emissions (both direct and indirect emissions) using a sample of US publicly listed firms.

Design/methodology/approach

The study applies generalized least squares (GLS) regression analyses to a sample of 2,043 US firm-year observations over a period of 14 years from 2007 to 2020. The methods include contemporaneous effect, lagged effect, alternative measures of carbon emissions and debt overhang, intensive versus non-intensive analysis, channel analysis, firm fixed effects, change analysis, controlling for credit rating analysis, propensity score matching approach, instrumental variable analysis with industry and year fixed effect.

Findings

This study's findings reveal that the debt overhang problem increases carbon emissions. This finding holds when the authors use alternative measures of carbon emissions and debt overhang. The authors find that carbon abatement investment is a channel that is negatively impacted by debt overhang, which in turn increases carbon emissions. This study's results are robust for several endogeneity tests, including firm fixed effects, change analysis, propensity score matching approach and two-stage least squares (2SLS) instrumental variable analysis.

Practical implications

The outcome of this research has policy implications for several stakeholders, including investors, firms, market participants and regulators. This study's findings offer insights for investors and firms, helping them allocate resources effectively and make financing decisions aimed at reducing carbon emissions. Regulators and policymakers can also use the findings to formulate policies that promote alternative sustainable finance practices.

Originality/value

The outcome of this research is likely to help firms develop their understanding of the debt overhang problem and undertake strategies that yield a significant amount of funding to invest in reducing carbon emissions.

Details

International Journal of Managerial Finance, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1743-9132

Keywords

Article
Publication date: 10 January 2023

Norsafiah Norazman, Naziah Muhamad Salleh, Siti Nurul Asma' Mohd Nashruddin and Wan Norisma Wan Ismail

Retrofitting and rehabilitation are part of the conservation approach in Heritage Building Conservation Guideline 2016 in Malaysia. Heritage buildings can be retrofitted to…

Abstract

Purpose

Retrofitting and rehabilitation are part of the conservation approach in Heritage Building Conservation Guideline 2016 in Malaysia. Heritage buildings can be retrofitted to preserve their culture and history while being given a new lease. Rehabilitation is a preservation requirement that is more flexible since it assumes that the structure has already deteriorated to the point where repairs are required to prevent further deterioration. Although the strategies of these two approaches are different, their combination resulted in sustainable heritage building maintenance. This long-term maintenance strategy is necessary, especially for Malaysia's numerous heritage schools, which have serious maintenance problems as a result of infrequent maintenance, repairs, and funding shortages.

Design/methodology/approach

This study involved secondary data from an intensive literature review along with a comparative study from articles review and context analysis. A comparative study was conducted to determine the typical issue with heritage school buildings and the best maintenance practice for these structures. Finally, it involved a SWOT analysis study of retrofitting and rehabilitating heritage school buildings will be discussed in this study as well.

Findings

The findings of this study will focus on developing a strategic planning framework and maintenance for heritage school buildings in Malaysia to achieve sustainable maintenance. It will also highlight sustainable maintenance best practices for heritage school buildings in Malaysia. Finally, SWOT analysis will go over the pros and cons of retrofitting and rehabilitation for these buildings.

Originality/value

This paper put forward the requirements of strategic planning in heritage school buildings and outlines the significance of sustainable maintenance for educational buildings. It is an alternative for cost savings that has not been extensively investigated in previous studies.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

1 – 7 of 7