Search results
1 – 10 of 45Zhao Xu, Xiang Wang, Ya Xiao and Jingfeng Yuan
There is often a lack of accurate performance evaluation in Public–Private Partnership (PPP) projects. It is a challenging issue to effectively use Building Information Modeling…
Abstract
Purpose
There is often a lack of accurate performance evaluation in Public–Private Partnership (PPP) projects. It is a challenging issue to effectively use Building Information Modeling (BIM) for PPP project performance evaluation. The objective of this study is to develop a PPP project performance evaluation model based on Industry Foundation Classes (IFC) and an enhanced matter-element method to more precisely evaluate PPP project performance.
Design/methodology/approach
The performance evaluation of PPP projects in the construction and operation period was explored. The PPP project performance evaluation indicator system was first established based on a literature review and PPP project practice. Then, the evaluation indicator information was expressed through IFC mapping and extension. After that, an IFC-based PPP project performance evaluation model was developed, and a case study was provided to validate the use of the proposed performance evaluation model.
Findings
The results of the case study show that the proposed approach can accurately and efficiently evaluate PPP projects, and it could favorably contribute to performance evaluation in PPP projects.
Research limitations/implications
This study only concerns the performance evaluation of one type of PPP project. Further research is required to study different types of PPP projects; the model needs to be more efficient and intelligent.
Originality/value
The performance evaluation of PPP projects utilizing IFC extension and the enhanced matter-element method provides guidance for the government and private parties to accurately and efficiently evaluate PPP project performance.
Details
Keywords
Jingqi Zhang, Hui Zhao, Zhijie Li and Ziliang Guo
The purpose of this paper is to evaluate green buildings from the angle of greenness and improve the evaluation system. And the matter-element extension method is used to evaluate…
Abstract
Purpose
The purpose of this paper is to evaluate green buildings from the angle of greenness and improve the evaluation system. And the matter-element extension method is used to evaluate the greenness of green buildings, in order to provide useful references for the evaluation system of green buildings.
Design/methodology/approach
First, this paper studies the aspects of safety and durability, health and comfort, living convenience, resource-saving, environmental liability and ecological quality, etc. For the first time, carbon emission is included in the evaluation system, 18 key evaluation indexes are determined by using the Delphi method, and the green building evaluation index system is established. Then, the combined weight method is proposed to determine the weight of each evaluation index, and the greenness evaluation model of green building is established with the matter-element extension method. Finally, taking Beijing Daxing International Airport as an example, the evaluation model of green building greenness was established to evaluate the building.
Findings
In this paper, the greenness evaluation model of green building established by the matter-element extension method solves the problem of incompatibility between qualitative and quantitative material elements in multi-factor evaluation. It makes the evaluation indexes more accurate and objective relative to the affiliation calculation of the evaluation set and improves the scientific, accuracy and reliability of the evaluation model.
Originality/value
In this paper, for the first time, carbon emission-related indicators are included in the green building evaluation system, which makes the evaluation system more perfect. In addition, a more scientific extension matter-element method is used to evaluate the greenness of green buildings, breaking the previous rough star evaluation method.
Details
Keywords
Abuse and reuse of syringes will let nursing professionals suffer serious risk of cross-infection of diseases. The purpose of this paper is to propose a flexible and extensible…
Abstract
Purpose
Abuse and reuse of syringes will let nursing professionals suffer serious risk of cross-infection of diseases. The purpose of this paper is to propose a flexible and extensible innovative design approach of single-use safety syringe. Besides, the evaluation procedure for syringe has also been developed.
Design/methodology/approach
By using the innovative design processes, based on the Su-Field model and extension method, this study presents designing of a new single-use safety syringe incorporating features and discarding problems.
Findings
The solution of design problem indicated that the substance “fingers grip cap” should be replaced. The advantages and disadvantages of proposed new designs of safety syringe as well as the perceived differences on the use of the safety syringes can be found out by using Focus Group Interview method.
Research limitations/implications
This research focussed on the function innovation without considering the psychology effect, such as shape aesthetics and users’ emotion.
Practical implications
The single-use safety syringe design and corresponding examples are adopted to explain the design processes and confirm the feasibility of the proposed approach.
Originality/value
This paper proposes a flexible and extensible innovative design approach of single-use safety syringe which is seldom studied. Importance and emergency of safety syringe design cannot be overemphasized.
Details
Keywords
Xiaojuan Li, Zhou Zhang, C.Y. Jim, Jiyu Lai and Xueqing Chen
This paper aims to establish a model to evaluate the benefits of building information modeling (BIM) from the owners' perspective. The model analyzes the correlation between five…
Abstract
Purpose
This paper aims to establish a model to evaluate the benefits of building information modeling (BIM) from the owners' perspective. The model analyzes the correlation between five secondary benefit indicators and their subsystems: product, financial, organizational, management and strategic. The final key factors of BIM benefits provide a decision-making basis for owners to raise the efficiency of BIM application.
Design/methodology/approach
Firstly, the authors combed 31 BIM-related literature and interviewed experts to identify 15 preliminary benefit indicators. The authors established a BIM benefit evaluation system based on relevant concepts, including two primary indicators, five secondary indicators and 15 tertiary indicators. Secondly, the authors analyzed the indicators by the extension theory of matter element analysis and a questionnaire survey of expert opinion. Finally, the new method was applied to a case study of a large shopping center in east China for empirical verification.
Findings
A BIM benefit evaluation model, including a three-tiered hierarchy of primary, secondary and tertiary indicators, was constructed through literature review and expert opinions. The model determined the critical factors of BIM benefits, enhanced understanding of owner benefits and improved BIM application under the owners' leadership.
Originality/value
At present, most studies focus on specific project stages or benefit indicators. This study developed an integrated BIM benefit evaluation system that targets owners. The findings could foster the development of China's construction industry, promote owner-led BIM application and advocate adopting the benefit evaluation method.
Details
Keywords
Zhenhua Luo, Juntao Guo, Jianqiang Han and Yuhong Wang
Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in…
Abstract
Purpose
Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in China is in the initial stage of development, which is prone to construction safety issues. This study aims to evaluate the construction safety risks of prefabricated subway stations in China and formulate corresponding countermeasures to ensure construction safety.
Design/methodology/approach
A construction safety risk evaluation index system for the prefabricated subway station was established through literature research and the Delphi method. Furthermore, based on the structure entropy weight method, matter-element theory and evidence theory, a hybrid evaluation model is developed to evaluate the construction safety risks of prefabricated subway stations. The basic probability assignment (BPA) function is obtained using the matter-element theory, the index weight is calculated using the structure entropy weight method to modify the BPA function and the risk evaluation level is determined using the evidence theory. Finally, the reliability and applicability of the evaluation model are verified with a case study of a prefabricated subway station project in China.
Findings
The results indicate that the level of construction safety risks in the prefabricated subway station project is relatively low. Man risk, machine risk and method risk are the key factors affecting the overall risk of the project. The evaluation results of the first-level indexes are discussed, and targeted countermeasures are proposed. Therefore, management personnel can deeply understand the construction safety risks of prefabricated subway stations.
Originality/value
This research fills the research gap in the field of construction safety risk assessment of prefabricated subway stations. The methods for construction safety risk assessment are summarized to establish a reliable hybrid evaluation model, laying the foundation for future research. Moreover, the construction safety risk evaluation index system for prefabricated subway stations is proposed, which can be adopted to guide construction safety management.
Details
Keywords
Sifeng Liu, Yingjie Yang, Naiming Xie and Jeffrey Forrest
The purpose of this paper is to summarize the progress in grey system research during 2000-2015, so as to present some important new concepts, models, methods and a new framework…
Abstract
Purpose
The purpose of this paper is to summarize the progress in grey system research during 2000-2015, so as to present some important new concepts, models, methods and a new framework of grey system theory.
Design/methodology/approach
The new thinking, new models and new methods of grey system theory and their applications are presented in this paper. It includes algorithm rules of grey numbers based on the “kernel” and the degree of greyness of grey numbers, the concept of general grey numbers, the synthesis axiom of degree of greyness of grey numbers and their operations; the general form of buffer operators of grey sequence operators; the four basic models of grey model GM(1,1), such as even GM, original difference GM, even difference GM, discrete GM and the suitable sequence type of each basic model, and suitable range of most used grey forecasting models; the similarity degree of grey incidences, the closeness degree of grey incidences and the three-dimensional absolute degree of grey incidence of grey incidence analysis models; the grey cluster model based on center-point and end-point mixed triangular whitenization functions; the multi-attribute intelligent grey target decision model, the two stages decision model with grey synthetic measure of grey decision models; grey game models, grey input-output models of grey combined models; and the problems of robust stability for grey stochastic time-delay systems of neutral type, distributed-delay type and neutral distributed-delay type of grey control, etc. And the new framework of grey system theory is given as well.
Findings
The problems which remain for further studying are discussed at the end of each section. The reader could know the general picture of research and developing trend of grey system theory from this paper.
Practical implications
A lot of successful practical applications of the new models to solve various problems have been found in many different areas of natural science, social science and engineering, including spaceflight, civil aviation, information, metallurgy, machinery, petroleum, chemical industry, electrical power, electronics, light industries, energy resources, transportation, medicine, health, agriculture, forestry, geography, hydrology, seismology, meteorology, environment protection, architecture, behavioral science, management science, law, education, military science, etc. These practical applications have brought forward definite and noticeable social and economic benefits. It demonstrates a wide range of applicability of grey system theory, especially in the situation where the available information is incomplete and the collected data are inaccurate.
Originality/value
The reader is given a general picture of grey systems theory as a new model system and a new framework for studying problems where partial information is known; especially for uncertain systems with few data points and poor information. The problems remaining for further studying are identified at the end of each section.
Details
Keywords
Wei Shan and Qingpu Zhang
The purpose of this paper is to apply a new idea and scientific method to evaluate the enterprise's independent innovation capability accurately.
Abstract
Purpose
The purpose of this paper is to apply a new idea and scientific method to evaluate the enterprise's independent innovation capability accurately.
Design/methodology/approach
The matter‐element, extension set and independent function in extension theory are introduced briefly. Based on extension theory, the matter‐element model on comprehensive evaluation of the enterprise's independent innovation capability is established. Then, an instance which makes structural analysis on the enterprise's independent innovation capability with extension evaluation method is given.
Findings
The matter‐element model on comprehensive evaluation of the enterprise's independent innovation capability is established. Extension evaluation method can combine qualitative analysis and quantitative analysis to reflect the changing process of the objective appropriately. By means of the matter‐element model, the evaluation result shows which the grade does the enterprise's independent innovation capability belong to.
Research limitations/implications
Extension evaluation method resorting to extension theory, cannot only reveal the evaluation grade and competitive advantage of an enterprise within the industry or within the scope of the evaluation, but also show comprehensive index level of the enterprise's independent innovation capability.
Practical implications
It is significant to monitor the enterprise's development and changes effectively, find the key factors influencing the enterprise's independent innovation capability and take effective measures in time.
Originality/value
New idea and scientific method are introduced into the enterprise's independent innovation activity, and it can integrate both qualitative and quantitative analysis to solve contradictory problems.
Details
Keywords
Fei Sun and Changjun Li
In order to improve the comprehensive evaluation level of shield tunnel structure health, taking a subway tunnel section as an example, and combined with the onsite measured data…
Abstract
Purpose
In order to improve the comprehensive evaluation level of shield tunnel structure health, taking a subway tunnel section as an example, and combined with the onsite measured data, such as regular inspection, health monitoring and disease remediation, this paper introduces the variable weight theory to improve the traditional fixed-weight evaluation method from structural deformation, current durability and disease status.
Design/methodology/approach
Considering the influence of the fluctuation of each index value on the index weight, a comprehensive structural health evaluation model of shield tunnel based on an improved variable weight matter-element extension model is proposed.
Findings
Compared with the traditional fixed-weight evaluation method, this model can correct the evaluation distortion caused by the fluctuation of index value and has optimal effect.
Originality/value
The sensitive analysis shows that several key indicators of the main threats to tunnel structure are obtained to improve the efficiency of operation, maintenance and management of shield tunnel structure.
Details
Keywords
Chan Li, Wen-De Zhang and Yi-Xin Lan
– The purpose of this study is to evaluate the potential risks of copyright infringement in digital library based on the extension theory.
Abstract
Purpose
The purpose of this study is to evaluate the potential risks of copyright infringement in digital library based on the extension theory.
Design/methodology/approach
At first, the analytic hierarchy process (AHP) is used to determine the weights of the existing indicator system for early warning. Second, a model is built to evaluate the potential risks of copyright infringement based on the extension theory in digital library. Finally, a real-world application is presented to show the effectiveness and usefulness of this approach.
Findings
The main findings of this paper are as follows: the early warning extension theory model is effective in distinguishing the degree of the potential risks of copyright infringement in digital library; the ranges of the value and the values of the indicators can directly affect the results while using this approach, so the accuracy of these two aspects is a crucial question.
Social implications
The social impact is that copyright infringement risks of digital library is reduced; the lawsuit rate and economic loss due to copyright infringement are thereby decreased as well.
Originality/value
This paper introduces the evaluation of the potential risks of copyright infringement based on the extension theory in digital library. The results provide support for the decision-makers in handling the potential risks of copyright infringement in digital library.
Details
Keywords
In the development processes of a product’s market life cycle, there are three phases of an enterprise’s innovation: new product development, production processes, and product…
Abstract
In the development processes of a product’s market life cycle, there are three phases of an enterprise’s innovation: new product development, production processes, and product management. In this article, the analyses of benefit and costs, value, and profit to companies are discussed in different stages. New logistics features that appear in an enterprise’s supply chain based on innovative modeling are discussed. Then a logistics model and its technical system based on the classified logistics center are established, which are appropriate for innovative modeling within an agile supply chain. Using the basic theory and techniques of ‘extenics’, the formal conception of innovative modeling-based manufacture in logistics is presented, and the matter-element models are established. Finally, a case study demonstrates the results.
Details