Search results

1 – 10 of over 1000
Article
Publication date: 26 January 2024

Mohsen Rajabzadeh, Seyed Meysam Mousavi and Farzad Azimi

This paper investigates a problem in a reverse logistics (RLs) network to decide whether to dispose of unsold goods in primary stores or re-commercialize them in outlet centers…

Abstract

Purpose

This paper investigates a problem in a reverse logistics (RLs) network to decide whether to dispose of unsold goods in primary stores or re-commercialize them in outlet centers. By deducting the costs associated with each policy from its revenue, this study aims to maximize the profit from managing unsold goods.

Design/methodology/approach

A new mixed-integer linear programming model has been developed to address the problem, which considers the selling prices of products in primary and secondary stores and the costs of transportation, cross-docking and returning unwanted items. As a result of uncertain nature of the cost and time parameters, gray numbers are used to deal with it. In addition, an innovative uncertain solution approach for gray programming problems is presented that considers objective function satisfaction level as an indicator of optimism.

Findings

According to the results, higher costs, including transportation, cross-docking and return costs, make sending goods to outlet centers unprofitable and more goods are disposed of in primary stores. Prices in primary and secondary stores heavily influence the number of discarded goods. Higher prices in primary stores result in more disposed of goods, while higher prices in secondary stores result in fewer. As a result of the proposed method, the objective function satisfaction level can be viewed as a measure of optimism.

Originality/value

An integral contribution of this study is developing a new mixed-integer linear programming model for selecting the appropriate goods for re-commercialization and choosing the best outlet center based on the products' price and total profit. Another novelty of the proposed model is considering the matching percentage of boxes with secondary stores’ desired product lists and the probability of returning goods due to non-compliance with delivery dates. Moreover, a new uncertain solution approach is developed to solve mathematical programming problems with gray parameters.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 21 November 2023

Pham Duc Tai, Krit Jinawat and Jirachai Buddhakulsomsiri

Distribution network design involves a set of strategic decisions in supply chains because of their long-term impacts on the total logistics cost and environment. To incorporate a…

Abstract

Purpose

Distribution network design involves a set of strategic decisions in supply chains because of their long-term impacts on the total logistics cost and environment. To incorporate a trade-off between financial and environmental aspects of these decisions, this paper aims to determine an optimal location, among candidate locations, of a new logistics center, its capacity, as well as optimal network flows for an existing distribution network, while concurrently minimizing the total logistics cost and gas emission. In addition, uncertainty in transportation and warehousing costs are considered.

Design/methodology/approach

The problem is formulated as a fuzzy multiobjective mathematical model. The effectiveness of this model is demonstrated using an industrial case study. The problem instance is a four-echelon distribution network with 22 products and a planning horizon of 20 periods. The model is solved by using the min–max and augmented ε-constraint methods with CPLEX as the solver. In addition to illustrating model’s applicability, the effect of choosing a new warehouse in the model is investigated through a scenario analysis.

Findings

For the applicability of the model, the results indicate that the augmented ε-constraint approach provides a set of Pareto solutions, which represents the ideal trade-off between the total logistics cost and gas emission. Through a case study problem instance, the augmented ε-constraint approach is recommended for similar network design problems. From a scenario analysis, when the operational cost of the new warehouse is within a specific fraction of the warehousing cost of third-party warehouses, the solution with the new warehouse outperforms that without the new warehouse with respective to financial and environmental objectives.

Originality/value

The proposed model is an effective decision support tool for management, who would like to assess the impact of network planning decisions on the performance of their supply chains with respect to both financial and environmental aspects under uncertainty.

Article
Publication date: 12 October 2022

Limin Su, YongChao Cao, Huimin Li and Chengyi Zhang

The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of…

Abstract

Purpose

The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of projects. This study is aimed at constructing an effective payment model for the whole life period of projects to achieve win-win among all stakeholders, so as to provide a theoretical reference and managerial implications for the public sector in the whole operation and maintenance period.

Design/methodology/approach

In the whole operation and maintenance period of water environment treatment PPP projects, this article investigates how the public sector optimizes the payment in the whole operation and maintenance period of projects. Firstly, the projects' whole operation and maintenance period is divided into several stages according to the performance appraisal period. And then, the multi-stage dynamic programming model is constructed to design the payment construct model for the public sector in each performance appraisal stage. The payment from the public sector is the decision variable, and the deduction from the private sector is a random variable.

Findings

The optimal payment model showed that the relatively less objective weight of public sector leaded to its relatively more total payment and vice versa. Therefore, the sustainable development of the projects can only be ensured when the objective weights both of them should be balanced. Additionally, the deduction from the performance appraisal of private sector plays an important role in the model construction. The larger deduction the private sector undertakes, the smaller profits private sector has. Since the deduction at each stage is a random variable, the deduction varies with the different probability distributions obeyed by the practical deduction in each stage.

Research limitations/implications

The findings from this study have provided theoretical and application references, and some managerial implications are also given. First, the improvement of the pricing system of public sector should be accelerated. Second, the reasonable profit of the private sector must be guaranteed. While pursuing the maximization of social benefits, the public sector should make full use of the price sharing mechanism in the market and supervise the real income situation of the private sector. Third is increasing the public to participate in pricing. Additionally, it is a limitation that the deduction is assumed to conform to a uniform distribution in this study. Other probability distributions on deduction can be essentially further sought, so as to be more line with the actual situation of the projects.

Originality/value

The optimal payment in whole operation and maintenance period of the projects has become an important issue, which is a key to project success. This study constructs a multi-stage dynamic programming model to optimize payment in the whole period of projects. Additionally, this study adds its value through deeply developing the new theories of optimal payment to more suitable for the practical problems, so that to optimize the design of payment mechanism. Meanwhile, a valuable reference for public and private sectors is provided to ensure the sustainable development of the projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 February 2023

Gokhan Agac, Birdogan Baki and Ilker Murat Ar

The purpose of this study is to systematically review the existing literature on the blood supply chain (BSC) from a network design perspective and highlight the research gaps in…

Abstract

Purpose

The purpose of this study is to systematically review the existing literature on the blood supply chain (BSC) from a network design perspective and highlight the research gaps in this area. Moreover, it also aims to pinpoint new research opportunities based on the recent innovative technologies for the BSC network design.

Design/methodology/approach

The study gives a comprehensive systematic review of the BSC network design studies until October 2021. This review was carried out in accordance with preferred reporting items for systematic reviews and meta-analyses (PRISMA). In the literature review, a total of 87 studies were analyzed under six main categories as model structure, application model, solution approach, problem type, the parties of the supply chain and innovative technologies.

Findings

The results of the study present the researchers’ tendencies and preferences when designing their BSC network models.

Research limitations/implications

The study presents a guide for researchers and practitioners on BSC from the point of view of network design and encourages adopting innovative technologies in their BSC network designs.

Originality/value

The study provides a comprehensive systematic review of related studies from the BSC network design perspective and explores research gaps in the collection and distribution processes. Furthermore, it addresses innovative research opportunities by using innovative technologies in the area of BSC network design.

Details

Journal of Modelling in Management, vol. 19 no. 1
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 19 February 2024

Alireza Khalili-Fard, Reza Tavakkoli-Moghaddam, Nasser Abdali, Mohammad Alipour-Vaezi and Ali Bozorgi-Amiri

In recent decades, the student population in dormitories has increased notably, primarily attributed to the growing number of international students. Dormitories serve as pivotal…

Abstract

Purpose

In recent decades, the student population in dormitories has increased notably, primarily attributed to the growing number of international students. Dormitories serve as pivotal environments for student development. The coordination and compatibility among students can significantly influence their overall success. This study aims to introduce an innovative method for roommate selection and room allocation within dormitory settings.

Design/methodology/approach

In this study, initially, using multi-attribute decision-making methods including the Bayesian best-worst method and weighted aggregated sum product assessment, the incompatibility rate among pairs of students is calculated. Subsequently, using a linear mathematical model, roommates are selected and allocated to dormitory rooms pursuing the twin objectives of minimizing the total incompatibility rate and costs. Finally, the grasshopper optimization algorithm is applied to solve large-sized instances.

Findings

The results demonstrate the effectiveness of the proposed method in comparison to two common alternatives, i.e. random allocation and preference-based allocation. Moreover, the proposed method’s applicability extends beyond its current context, making it suitable for addressing various matching problems, including crew pairing and classmate pairing.

Originality/value

This novel method for roommate selection and room allocation enhances decision-making for optimal dormitory arrangements. Inspired by a real-world problem faced by the authors, this study strives to offer a robust solution to this problem.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Abstract

Details

The Integrated Application of Effective Approaches in Supply Chain Networks
Type: Book
ISBN: 978-1-83549-631-2

Article
Publication date: 26 January 2024

Mohamed Marzouk and Dina Hamdala

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real…

89

Abstract

Purpose

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real estate industry is characterized by high costs, high profit and high risks. The schedules of real estate projects are also characterized by having large number of repetitive activities that are executed over a long duration. The repetitiveness, long duration of execution, the high amounts of money involved and the high risk made it desirable to leverage the impact of changes in phasing plans on net present value of amounts incurred and received over the long execution and selling duration. This also changes the project progress, and delivery time as well as their respective impact on customer degree of satisfaction. This research addresses the problem of selecting the best phasing alternative for real estate development projects while maximizing customer satisfaction and project profit.

Design/methodology/approach

The research proposes a model that generates all construction phasing alternatives and performs decision-making to rank all possible phasing alternatives. The proposed model consists of five modules: (1) Phasing Sequencing module, (2) Customer Satisfaction module, (3) Cash-In calculation module, (4) Cost Estimation module and (5) Decision-making module. A case study was presented to demonstrate the practicality of the model.

Findings

The proposed model satisfies the real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model generates all construction phasing alternatives and performs multi-criteria decision making to rank all possible phasing alternatives. It quantifies the score of the two previously mentioned criteria and ranks all solutions according to their overall score.

Research limitations/implications

The research proposes a model that assist real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model can be used to conclude general guidelines and common successful practices to be used by real estate developers when deciding the construction phasing plan. In this study the model is based on business models where all the project units are sold, rental cases are not considered. Also, the budget limitations that might exist when phasing is not considered in the model computations.

Originality/value

The model can be used as a complete platform that can hold all real estate project data, process revenues and cost information for estimating profit, plotting cash flow profiles, quantifying the degree of customer satisfaction attributable to each phasing alternative and providing recommendation showing the best one. The model can be used to conclude general guidelines and common successful practices to be used by real estate developers when tackling the challenge of selecting construction phasing plans.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 December 2023

Ahmed M. Attia, Ahmad O. Alatwi, Ahmad Al Hanbali and Omar G. Alsawafy

This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.

Abstract

Purpose

This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.

Design/methodology/approach

A mixed-integer nonlinear programming (MINLP) model is developed to study the relation between production makespan, energy consumption, maintenance actions and footprint, i.e. service level and sustainability measures. The speed scaling technique is used to control energy consumption, the capping policy is used to control CO2 footprint and preventive maintenance (PM) is used to keep the machine working in healthy conditions.

Findings

It was found that ignoring maintenance activities increases the schedule makespan by more than 21.80%, the total maintenance time required to keep the machine healthy by up to 75.33% and the CO2 footprint by 15%.

Research limitations/implications

The proposed optimization model can simultaneously be used for maintenance planning, job scheduling and footprint minimization. Furthermore, it can be extended to consider other maintenance activities and production configurations, e.g. flow shop or job shop scheduling.

Practical implications

Maintenance planning, production scheduling and greenhouse gas (GHG) emissions are intertwined in the industry. The proposed model enhances the performance of the maintenance and production systems. Furthermore, it shows the value of conducting maintenance activities on the machine's availability and CO2 footprint.

Originality/value

This work contributes to the literature by combining maintenance planning, single-machine scheduling and environmental aspects in an integrated MINLP model. In addition, the model considers several practical features, such as machine-aging rate, speed scaling technique to control emissions, minimal repair (MR) and PM.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 2 January 2023

Jitendra Sharma and Bibhuti Bhusan Tripathy

Supplier evaluation and selection is an essential (multi-criteria decision-making) MCDM process that considers qualitative and quantitative factors. This research work attempts to…

Abstract

Purpose

Supplier evaluation and selection is an essential (multi-criteria decision-making) MCDM process that considers qualitative and quantitative factors. This research work attempts to use a MCDM technique based on merging fuzzy Technique for Order Preference by Similarity to Ideal Solution (F-TOPSIS) and Quality Function Deployment (QFD) ideas. The study attempts to find the supplier's attributes (HOWs) to accomplish its goals after determining the product's characteristics to suit the company's needs (WHATs).

Design/methodology/approach

The proposed research methodology comprises the following four steps: Step 1: Determine the product purchase requirements (“WHATs”) and those pertinent to supplier evaluation (“HOWs”). In Step 2, the relative importance of the “WHAT-HOW” correlation scores is determined and also the resulting weights of “HOWs”. In Step 3, linguistic evaluations of possible suppliers in comparison to subjective criteria are given to the decision-makers. Step 4 combines the QFD and F-TOPSIS techniques to select suppliers.

Findings

A fuzzy MCDM method based on fusing and integrating fuzzy information and QFD is presented to solve the drawbacks of conventional decision-making strategies used in supplier selection. Using the F-TOPSIS method, fuzzy positive ideal solution (FPIS) and fuzzy negative ideal solution (FNIS), the relative closeness coefficient values for all alternatives are computed. The suppliers are ranked by relating the closeness of coefficient values. This method permits the combination of ambiguous and subjective data expressed as fuzzy-defined integers or linguistic variables.

Originality/value

QFD and TOPSIS, two widely used approaches, are combined in this article to rank and evaluate suppliers based on the traits that the suppliers choose to prioritize. This study demonstrates that the method employed could address multiple-criteria decision-making scenarios in a computationally efficient manner. The effectiveness and applicability of the method are illustrated using an example.

Details

The TQM Journal, vol. 35 no. 8
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 4 July 2023

Stephanie Halbrügge, Paula Heess, Paul Schott and Martin Weibelzahl

The purpose of this paper is to examine how active consumers, i.e. consumers that can inter-temporally shift their load, can influence electricity prices. As demonstrated in this…

Abstract

Purpose

The purpose of this paper is to examine how active consumers, i.e. consumers that can inter-temporally shift their load, can influence electricity prices. As demonstrated in this paper, inter-temporal load shifting can induce negative electricity prices, a recurring phenomenon on power exchanges.

Design/methodology/approach

The paper presents a novel electricity-market model assuming a nodal-pricing, energy-only spot market with active consumers. This study formulates an economic equilibrium problem as a linear program and uses an established six-node case study to compare equilibrium prices of a model with inflexible demand to a model with flexible demand of active consumers.

Findings

This study illustrates that temporal coupling of hourly market clearing through load shifting of active consumers can cause negative electricity prices that are not observed in a model with ceteris paribus inflexible demand. In such situations, where compared to the case of inflexible demand more flexibility is available in the system, negative electricity prices signal lower total system costs. These negative prices result from the use of demand flexibility, which, however, cannot be fully exploited due to limited transmission capacities, respectively, loop-flow restrictions.

Originality/value

Literature indicates that negative electricity prices result from lacking flexibility. The results illustrate that active consumers and their additional flexibility can lead to negative electricity prices in temporally coupled markets, which in general contributes to increased system efficiency as well as increased use of renewable energy sources. These findings extend existing research in both the area of energy flexibility and causes for negative electricity prices. Therefore, policymakers should be aware of such (temporal coupling) effects and, e.g. continue to allow negative electricity prices in the future that can serve as investment signals for active consumers.

Details

International Journal of Energy Sector Management, vol. 18 no. 3
Type: Research Article
ISSN: 1750-6220

Keywords

1 – 10 of over 1000