Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 12 January 2024

Patrik Jonsson, Johan Öhlin, Hafez Shurrab, Johan Bystedt, Azam Sheikh Muhammad and Vilhelm Verendel

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Abstract

Purpose

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Design/methodology/approach

A mixed-method case approach is applied. Explanatory variables are identified from the literature and explored in a qualitative analysis at an automotive original equipment manufacturer. Using logistic regression and random forest classification models, quantitative data (historical schedule transactions and internal data) enables the testing of the predictive difference of variables under various planning horizons and inaccuracy levels.

Findings

The effects on delivery schedule inaccuracies are contingent on a decoupling point, and a variable may have a combined amplifying (complexity generating) and stabilizing (complexity absorbing) moderating effect. Product complexity variables are significant regardless of the time horizon, and the item’s order life cycle is a significant variable with predictive differences that vary. Decoupling management is identified as a mechanism for generating complexity absorption capabilities contributing to delivery schedule accuracy.

Practical implications

The findings provide guidelines for exploring and finding patterns in specific variables to improve material delivery schedule inaccuracies and input into predictive forecasting models.

Originality/value

The findings contribute to explaining material delivery schedule variations, identifying potential root causes and moderators, empirically testing and validating effects and conceptualizing features that cause and moderate inaccuracies in relation to decoupling management and complexity theory literature?

Details

International Journal of Operations & Production Management, vol. 44 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 22 January 2024

Md. Tareq Hossain Khondoker, Md. Mehrab Hossain and Ayan Saha

Due to its longer length compared to other construction materials and distinctive stacking patterns, obtaining construction steel bars in congested construction sites with limited…

Abstract

Purpose

Due to its longer length compared to other construction materials and distinctive stacking patterns, obtaining construction steel bars in congested construction sites with limited storage capacity becomes challenging. Lack of storage space in crowded places prompts the need for building steel bar storage choice optimization. Therefore, this study aims to optimize the construction steel bar procurement plan by providing when and how much rebar to order and how to stack different sizes of rebar considering limited storage capacity.

Design/methodology/approach

A novel approach has been presented in this paper by integrating 4D building information modelling (BIM) and mixed-integer linear programming (MILP). This technique uses BIM to retrieve material quantities, including rebar, during the design phase. Following that, activities are scheduled depending on the duration determined by crew productivity data and material quantity. Then, based on the prior price, the price of each unit of rebar is projected for the duration of construction using the exponential smoothing method. After that, the MILP approach is used to generate an optimal steel bar procurement plan for limited storage space following the scheduled rebar-related operations.

Findings

The developed strategy minimizes overall procurement costs and ensures the storage of rebar as per standard guidelines. An optimal rebar procurement and storage plan to construct a six-storied RC frame has been presented in this paper as a demonstrative example to show the effectiveness of the proposed method.

Originality/value

This work partially satisfies a long-sought research need for establishing a comprehensive construction steel bar procurement system, making it a very useful source of information for practitioners and researchers. The proposed method can be used to minimize a key performance limitation that the conventional rebar procurement practice for crowded building sites may experience.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 11 August 2023

Timothy I. Ramjaun, Madeleine Pullman, Maneesh Kumar and Vasco Sanchez Rodrigues

This article aims to investigate collaborative procurement as a sourcing strategy amongst competing small enterprises in an effort to reduce their material supply costs through…

Abstract

Purpose

This article aims to investigate collaborative procurement as a sourcing strategy amongst competing small enterprises in an effort to reduce their material supply costs through increased efficiencies, bargaining power and economies of scale.

Design/methodology/approach

A case study approach is applied to a network of breweries that are regionally clustered. Interview data from producers, suppliers and industry experts is inductively interpreted to understand the viability, organisational impact and benefits/limitations of joint procurement activities.

Findings

The craft brewing industry follows a market place strategy of differentiation to achieve competitive advantage. This has supply chain implications that promote raw material diversity, which is in conflict with standardisation – a necessary factor for collective buying. Competition impacts information sharing and governance mechanism, while the structural factors of size asymmetry along and across the supply chain influence returns. These issues impact the potential economic benefits of collaborative procurement.

Research limitations/implications

The research propositions have been developed in a specific industry but are generalisable to other companies with a differentiation strategy, especially in the consumer packaged goods sector.

Practical implications

Enabling conditions and constraints are captured in a framework and capability matrix, which can be used by practitioners to assess industry and product feasibility for collaborative procurement.

Originality/value

Previous studies of collaborative procurement have been in the public sector amongst large organisations. This work focusses on coopetition in the context of small businesses to identify the viability and cost-benefit of this strategy.

Details

International Journal of Operations & Production Management, vol. 44 no. 3
Type: Research Article
ISSN: 0144-3577

Keywords

Case study
Publication date: 30 January 2024

Youwei Wang

As an Internet fashion brand, HSTYLE has developed into an Internet enterprise with annual sales of 1.5 billion RMB within 10 years, establishing its position as the top industry…

Abstract

As an Internet fashion brand, HSTYLE has developed into an Internet enterprise with annual sales of 1.5 billion RMB within 10 years, establishing its position as the top industry performer in China. This case studies HSTYLES' innovation in business model and organizational management. HSTYLE's workgroups have achieved the balance of responsibilities and rights in a small team of three members at minimum, while mobilizing the enthusiasm and initiative of the line managers with the support of public service sector. At the same time, HSTYLE enriches its brand style, establishes a fashion cloud platform, and integrates individual and organizational consumers into its existing fashion design, manufacturing and sales system.

Details

FUDAN, vol. no.
Type: Case Study
ISSN: 2632-7635

Article
Publication date: 4 March 2024

Yuxuan Wu, Wenyuan Xu, Tianlai Yu and Yifan Wang

Polyurethane concrete (PUC), as a new type of steel bridge deck paving material, the bond-slip pattern at the interface with the steel plate is not yet clear. In this study, the…

Abstract

Purpose

Polyurethane concrete (PUC), as a new type of steel bridge deck paving material, the bond-slip pattern at the interface with the steel plate is not yet clear. In this study, the mechanical properties of the PUC and steel plate interface under the coupled action of temperature, normal force and tangential force were explored through shear tests and numerical simulations. An analytical model for bond-slip at the PUC/steel plate interface and a predictive model for the shear strength of the PUC/steel plate interface were developed.

Design/methodology/approach

The new shear test device designed in this paper overcomes the defect that the traditional oblique shear test cannot test the interface shear performance under the condition of fixed normal force. The universal testing machine (UTM) test machine was used to adjust the test temperature conditions. Combined with the results of the bond-slip test, the finite element simulation of the interface is completed by using the COHENSIVE unit to analyze the local stress distribution characteristics of the interface. The use of variance-based uncertainty analysis guaranteed the validity of the simulation.

Findings

The shear strength (τf) at the PUC-plate interface was negatively correlated with temperature while it was positively correlated with normal stress. The effect of temperature on the shear properties was more significant than that of normal stress. The slip corresponding to the maximum shear (D1) positively correlates with both temperature and normal stress. The interfacial shear ductility improves with increasing temperature.

Originality/value

Based on the PUC bond-slip measured curves, the relationship between bond stress and slip at different stages was analyzed, and the bond-slip analytical model at different stages was established; the model was defined by key parameters such as elastic ultimate shear stress τ0, peak stress τf and interface fracture energy Gf.

Details

International Journal of Structural Integrity, vol. 15 no. 2
Type: Research Article
ISSN: 1757-9864

Keywords

Case study
Publication date: 30 January 2024

Youwei Wang

T Education is a leading educational science and technology enterprise in China with technology-driven, talent intimacy and quality leadership as the core development objectives…

Abstract

T Education is a leading educational science and technology enterprise in China with technology-driven, talent intimacy and quality leadership as the core development objectives. Since its inception, it has been committed to creating better learning experience for children. As the predecessor of T-education, X-education was founded in Beijing in 2003. At first, it mainly provided after-school math counseling for school-age children. Over the past 10 years, its business has been expanding, covering almost every aspect of school-age education. This case studies accounting issues and business ethics challenges that firms may face when they transform from a single (traditional education) line of business to a multiple channel business.

Details

FUDAN, vol. no.
Type: Case Study
ISSN: 2632-7635

Article
Publication date: 13 July 2023

Adekunle Sabitu Oyegoke, Ben Williams Fisher, Saheed Ajayi, Temitope Seun Omotayo and Duga Ewuga

Supply chain disruptions have a significant impact on overall project delivery. This study aims to identify the supply chain disruptive factors and develop a framework to mitigate…

Abstract

Purpose

Supply chain disruptions have a significant impact on overall project delivery. This study aims to identify the supply chain disruptive factors and develop a framework to mitigate the disruptive effects on the supply chain. Covid-19 and Brexit disruption and their longevity effects in the short, medium and long term on the supply chain are relied upon to develop the framework.

Design/methodology/approach

The study adopted a mixed-method approach with a sequential explanatory design. The main disruptive factors were identified through a literature review, and key factors were selected through a focus group exercise. A questionnaire survey was carried out to sample opinions from the practitioners; 41 questionnaires were received and analysed using the relative importance index (RII) method for ranking the factors and percentage frequency distribution to determine the longevity effects. Five follow-up semi-structured interviews were conducted over the telephone and later transcribed.

Findings

The results of Covid-19 disruption indicate that material cost increase ranked first (RII: 0.863), logistics cost increase and supply chain interaction ranked second and third, respectively. They have long-term, medium-term and short-term longevity effects, respectively. The lowest-rated factors were communication (RII: 0.561), staff shortages (RII: 0.629) and impact on relationships (RII: 0.639). The three most ranked Brexit disruptive factors are supply chain interaction (RII: 0.775), material cost increase (RII: 0.766) and logistic and haulage delay (RII: 0.717). The first two factors have long-term effects, and the logistics and haulage delays have a medium-term impact. The mitigating solutions suggested in the framework are collaborative working, stronger resilience to external forces and better transparency and communication that will lead to good relationships among the supply chain members.

Research limitations/implications

The scope of the study was limited to the UK construction industry; however, the pandemic effect on supply chain can serve as critical learning curve in other developed and developing countries.

Practical implications

The study will help the government and construction firms to understand the focal areas of importance in solving the supply chain disruption problems based on the effects of Brexit and Covid-19. The research would be useful in ensuring the proactive involvement of the government and contracting firms in their preparedness for similar events in the future. The results could be interpreted for critical learning in other developed/developing countries.

Originality/value

Identifying and ranking the supply chain disruptive factors affecting the small‐ and medium‐sized enterprises (SMEs) in the UK construction industry has been the focal point of this study. The study also proposes a simple but effective framework comprising the highly ranked factors, their longevity effects and mitigating measures. This will help the SMEs manage future/similar external events affecting the supply chain.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 22 March 2024

Rida Afrilyasanti, Eko Suhartoyo and Utami Widiati

Through the action research study, this paper aims to examine how e-portfolios improve students’ critical, reflective and creative thinking as part of higher-order thinking skills…

Abstract

Purpose

Through the action research study, this paper aims to examine how e-portfolios improve students’ critical, reflective and creative thinking as part of higher-order thinking skills (HOTS). Besides, this paper also explores how e-portfolios enhance students’ speaking skills. The study is carried out to improve the current state by identifying and solving problems in specific contexts.

Design/methodology/approach

This investigation was designed to seek the improvement of the students’ higher-order thinking and speaking skills after the implementation of the e-portfolio. Action research was chosen because action research is suitable to bring change and improvement in the system or assume to bring progress in the system. This study was designed in two phases, featuring reflection and connection between previous and new data.

Findings

By completing this action research study, the authors assisted students in improving their higher-order thinking and speaking skills. The improvement was related to the indicators for learning success, which were explained in this research. The HOTS criteria include the capacity to analyze essential facts and arguments that the students presented in their spoken works logically and critically.

Research limitations/implications

HOTS encompasses critical, logical, creative and metacognitive thinking skills. Future research should go further into the usage of e-portfolios in the development of students’ metacognitive capacities. Moreover, because this investigation was carried out using action research methods, it is crucial to recognize that no generalizability can be offered for the findings.

Practical implications

The study’s findings should also benefit practitioners and instructors endeavoring to enhance students’ e-portfolios, critical thinking and digital skills in the classroom.

Social implications

The discussion focuses on important development topics. Everyone, not just students, should be encouraged to participate in creating and developing our technological future. The analysis offers unique and essential perspectives into what to explore for such a substantial attempt as implementing digital technology, specifically to construct an e-portfolio.

Originality/value

Despite the widespread usage of e-portfolios in English as a foreign language (EFL) instruction, there is a lack of research on how e-portfolios can enhance EFL students’ HOTS and speaking abilities. Hence, this study addresses a deficiency in existing research by examining the potential of e-portfolios to enhance students’ HOTS and oral communication skills within the context of EFL.

Details

Interactive Technology and Smart Education, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-5659

Keywords

Article
Publication date: 14 December 2023

Maren Hinrichs, Loina Prifti and Stefan Schneegass

With production systems become more digitized, data-driven maintenance decisions can improve the performance of production systems. While manufacturers are introducing predictive…

Abstract

Purpose

With production systems become more digitized, data-driven maintenance decisions can improve the performance of production systems. While manufacturers are introducing predictive maintenance and maintenance reporting to increase maintenance operation efficiency, operational data may also be used to improve maintenance management. Research on the value of data-driven decision support to foster increased internal integration of maintenance with related functions is less explored. This paper explores the potential for further development of solutions for cross-functional responsibilities that maintenance shares with production and logistics through data-driven approaches.

Design/methodology/approach

Fifteen maintenance experts were interviewed in semi-structured interviews. The interview questions were derived based on topics identified through a structured literature analysis of 126 papers.

Findings

The main findings show that data-driven decision-making can support maintenance, asset, production and material planning to coordinate and collaborate on cross-functional responsibilities. While solutions for maintenance planning and scheduling have been explored for various operational conditions, collaborative solutions for maintenance, production and logistics offer the potential for further development. Enablers for data-driven collaboration are the internal synchronization and central definition of goals, harmonization of information systems and information visualization for decision-making.

Originality/value

This paper outlines future research directions for data-driven decision-making in maintenance management as well as the practical requirements for implementation.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

1 – 10 of over 3000