Search results
1 – 10 of 260Özge Gürsoy and Nazlı Ferah Akıncı
The inadequacy of regulations, the uncertainty of the quality of houses produced and the needs of users all highlight the need for a house analysis in Turkey. The goal of this…
Abstract
Purpose
The inadequacy of regulations, the uncertainty of the quality of houses produced and the needs of users all highlight the need for a house analysis in Turkey. The goal of this study is to understand housing quality in Turkey based on the gap between expectations and existing housing stock, to identify the main housing expectations and the problematic issues in the current housing situation.
Design/methodology/approach
The authors designed a survey using the quality indicators of several well-known housing quality assessment tools to reveal residents' housing preferences and current housing situation in Turkey. The authors analyzed the survey results to identify the gap between housing preferences and existing conditions to reveal the housing quality of Turkish housing.
Findings
Overall results show that residents in Turkey, regardless of their demographics, want and need better houses. It was determined that physical conditions, safety, aesthetics and accessibility are the issues for which the expectations of the participants are high and the lack of which is most felt.
Originality/value
This paper reveals the residents' perspective on housing and their housing quality. It emphasizes the need for more research on housing quality, the need for updated regulation and necessity of a housing quality assessment tool in Turkey.
Details
Keywords
Esra Keskin, Eunhwa Yang, Harun Tanrıvermiş and Monsurat Ayojimi Salami
The facility management (FM) sector, which is developing rapidly, is making slower progress in Turkey compared to Europe and the USA. This paper aims to research the underlying…
Abstract
Purpose
The facility management (FM) sector, which is developing rapidly, is making slower progress in Turkey compared to Europe and the USA. This paper aims to research the underlying issues leading to FM practices and offer insights into the implications of FM-related policies, especially for large urban transformation projects.
Design/methodology/approach
The study used a mixed-methods research design and collected qualitative data through semi-structured interviews with building/site managers and quantitative data through structured surveys with residents. Forty-nine building/site managers and 660 residents participated in the interview and survey from Turkey’s North Ankara and Dikmen Valley urban transformation projects.
Findings
The FM by residents, performed by the managers selected among homeowners, was preferred to the professional FM in Turkey. Education level, age, homeownership and duration of living in the region were associated with selecting FM practices. Cost also had an important place among the selection criteria, and the standard view from the residents was that professional FM would cause a cost increase. However, interviews with building/site managers in North Ankara and Dikmen Valley Urban Transformation areas revealed that a significant part of the problem resulted from insufficient knowledge and experience in FM.
Research limitations/implications
Within the scope of the research, two urban transformation projects in Ankara Province were selected, and the survey was limited to the North Ankara Entrance Urban Transformation Project and Dikmen Valley Urban Transformation Project areas. Although there is a need to improve the understanding of FM in all facilities, built environments and collective buildings, collective buildings in urban transformation areas due to several constraints, those other identified areas are postponed for future study. In addition, collective buildings located in transformation areas differ from others in discussing the social dimension and the impact of management.
Social implications
Within the scope of the research, two urban transformation projects in Ankara Province were selected, and the survey was limited to the North Ankara Entrance Urban Transformation Project and Dikmen Valley Urban Transformation Project areas. Although there is a need to improve the understanding of FM in all facilities, due to several constraints built environments and collective buildings in urban transformation areas, are postponed for future study. In addition, collective buildings located in transformation areas differ from others in discussing the social dimension and the impact of management.
Originality/value
This study evaluates two different FM approaches: FM by residents and professional FM, implemented in Turkey and identifies the criteria for choosing the FM practice. In addition, both building/site managers and residents evaluate different perspectives on FM. This study is unique because it compares different FM practices in Turkey and the criteria for residents to prefer different FM practices.
Details
Keywords
Ali M. Saad, Mohammed Dulaimi, Suhaib Arogundade, Sambo Lyson Zulu and Chris Gorse
The recent failures and insolvencies of organisations related to the modern methods of construction (MMC) have gained increased attention and controversy across the UK…
Abstract
Purpose
The recent failures and insolvencies of organisations related to the modern methods of construction (MMC) have gained increased attention and controversy across the UK construction sector. Such failures are linked to their inability to achieve an economy of scale and drive key clients to accept the MMC as an alternative to traditional methods. This paper aims to unravel whether a phenomenon of “innovation negativism” has manifested and is contributing to public clients' indecision towards broader MMC, whether this is only linked to past negative experiences formed after the Second World War or whether additional contributing reasons exist to influence adoption.
Design/methodology/approach
This study focusses on exploring the decision-making of the UK public construction sector; therefore, this paper adopts a qualitative approach, utilising interviews with 14 carefully selected MMC experts, government advisors and public clients. The phenomenological stance adopted herewith enables the authors to make better sense of the perceptions of the interviewees, leading to the conceptualisation of the innovation negativism phenomenon.
Findings
The paper identifies nine themes that may be argued to promote a profound understanding of the MMC negativism influencing public clients' decision-making. The study has found that more than just the previous negative perceptions formulated post Second World War are driving innovation negativism in the UK public sector. Notably, the emerging themes are incomprehension, lacking evidence, communication, relationship history, bad experiences, uncertainty, inadequate experimentation, the business case and localism.
Originality/value
This study is the first construction management research that acts as a fair departure point to conceptualise the reasoning behind innovation negativism in the construction setting. Through mirroring demand's unipolarity for traditional methods, policy and decision-makers can now rely on the conceptualised reasoning to determine practical solutions to overcome clients' indecisions towards MMC.
Details
Keywords
Kanokwan Pimchan and Chonlatis Darawong
This study aims to examine the influence of condominium attributes on resident satisfaction and word of mouth from the perspectives of the elderly in Thailand.
Abstract
Purpose
This study aims to examine the influence of condominium attributes on resident satisfaction and word of mouth from the perspectives of the elderly in Thailand.
Design/methodology/approach
Data were collected from 338 elderly residents through a questionnaire survey and analysed by using descriptive statistics and structural equation modelling procedures.
Findings
The results showed that the strongest predictor of resident satisfaction was design functionality, followed by social environment, safety and security and service quality. In addition, the strongest predictor of word of mouth was safety and security, followed by design functionality, proximity, service quality and social environment.
Research limitations/implications
The data were drawn at the level of the overall characteristics of elderly residents. People may be different in terms of their demographic characters such as gender, age, and user experience.
Practical implications
The study suggests that condominium developers and designers should pay attention to design functionality both physically and mentally such as suitable materials, lighting and common areas. Moreover, the developers should focus on the proximity of the nearest hospitals, safety and security measures, well-trained security personnel and social activity arrangement.
Originality/value
Elderly condominium markets are increasingly growing as a result of the ageing society in Thailand. However, very few empirical studies investigate condominium attributes that affect resident satisfaction and word of mouth provided by real estate developers. The paper aims to determine driving factors that enhance the better well-being of elderly residents.
Details
Keywords
Olushola Akinshipe, Matthew Ikuabe, Samuel Adeniyi Adekunle and Clinton Aigbavboa
It is no news that Chinese construction companies are highly motivated to invest in Africa in terms of infrastructure and construction. This influx from the beginning of the…
Abstract
Purpose
It is no news that Chinese construction companies are highly motivated to invest in Africa in terms of infrastructure and construction. This influx from the beginning of the millennium marked a game-changer for infrastructural development in most African countries. This study, therefore, explores how the partnership between China and Africa has impacted the construction industry in Africa with a focus on Nigeria.
Design/methodology/approach
A quantitative approach was adapted for the study, which is descriptive in nature, and the primary participants of the study were core construction professionals within the Nigerian construction industry. Data was collected via a structured questionnaire, and multivariate statistics was used to analyse the data.
Findings
The study results revealed that the benefits accrued from Chinese participation in the African construction industry can be classified into three distinct categories: socio-economic development through construction, land transportation system development and construction industry development. The study further revealed that Chinese involvement has been most beneficial to the development of the land transportation system in Nigeria with more investment in the construction and maintenance of roads and railways.
Originality/value
The study will serve as a basis for making informed future decisions on Chinese participation in the Nigerian construction industry as it exposes the impacts of the relationship within the current system. The outcome of this study can be used to refocus the partnership to ensure the optimum development of the local construction industry. The government and other relevant agencies can use the findings from this study to ensure that there is sustainable growth in the local construction industry through Chinese participation.
Details
Keywords
Serena Summa, Alex Mircoli, Domenico Potena, Giulia Ulpiani, Claudia Diamantini and Costanzo Di Perna
Nearly 75% of EU buildings are not energy-efficient enough to meet the international climate goals, which triggers the need to develop sustainable construction techniques with…
Abstract
Purpose
Nearly 75% of EU buildings are not energy-efficient enough to meet the international climate goals, which triggers the need to develop sustainable construction techniques with high degree of resilience against climate change. In this context, a promising construction technique is represented by ventilated façades (VFs). This paper aims to propose three different VFs and the authors define a novel machine learning-based approach to evaluate and predict their energy performance under different boundary conditions, without the need for expensive on-site experimentations
Design/methodology/approach
The approach is based on the use of machine learning algorithms for the evaluation of different VF configurations and allows for the prediction of the temperatures in the cavities and of the heat fluxes. The authors trained different regression algorithms and obtained low prediction errors, in particular for temperatures. The authors used such models to simulate the thermo-physical behavior of the VFs and determined the most energy-efficient design variant.
Findings
The authors found that regression trees allow for an accurate simulation of the thermal behavior of VFs. The authors also studied feature weights to determine the most relevant thermo-physical parameters. Finally, the authors determined the best design variant and the optimal air velocity in the cavity.
Originality/value
This study is unique in four main aspects: the thermo-dynamic analysis is performed under different thermal masses, positions of the cavity and geometries; the VFs are mated with a controlled ventilation system, used to parameterize the thermodynamic behavior under stepwise variations of the air inflow; temperatures and heat fluxes are predicted through machine learning models; the best configuration is determined through simulations, with no onerous in situ experimentations needed.
Details
Keywords
Jones Nyame Aboagye, Ernest Kissi, Alex Acheampong and Edward Badu
This research aims to evaluate the status of project management best practices in the road infrastructure sector of Ghana through the inquiry of project managers’ competency.
Abstract
Purpose
This research aims to evaluate the status of project management best practices in the road infrastructure sector of Ghana through the inquiry of project managers’ competency.
Design/methodology/approach
Based on a thorough literature review on competency and project management best practices, a criterion for measuring best practices based on the competencies was identified. Using closed-ended questionnaires as a survey instrument, data was collected and analyzed using a one-sample t-test, Kendall’s concordance coefficient and simple regression.
Findings
The key finding reveals that in achieving project management best practices for the Ghanaian road infrastructure projects, project managers should straighten and strengthen their capability in terms of skills, personal characteristics and knowledge as ranked. An appropriate blend of these characteristics would be a necessary requirement for project managers. Through this, project managers and project-based road infrastructure organizations will be able to win the confidence of their stakeholders and attain improvements in cost-effectiveness, quality and time management.
Research limitations/implications
This study provides project managers in the road infrastructure sector with relevant information on which criteria and variables are critical and are frequently required to manage such projects. This will be helpful for training programs and professional development of project managers in the road infrastructure sector.
Originality/value
The study provides a new direction and focuses for project managers in the road infrastructure industry toward best project management practices in developing countries. It also complements existing studies in this area which deepen the understanding of the subject area.
Details
Keywords
Ewald Kuoribo, Peter Amoah, Ernest Kissi, David John Edwards, Jacob Anim Gyampo and Wellington Didibhuku Thwala
Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work…
Abstract
Purpose
Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work outside of their geographical spectrum; however, the multicultural dissimilarities of construction workforces within the project management team (and how these may impact upon project productivity performance) have been given scant academic attention. To bridge this knowledge gap, this paper aims to analyse the effects of a multicultural workforce on construction productivity.
Design/methodology/approach
The epistemological positioning of the research adopted mixed philosophies (consisting of both interpretivism and postpositivism) to undertake a deductive and cross-sectional survey to collate primary quantitative data collected via a closed-ended structured questionnaire. Census sampling and convenience sampling techniques were adopted to target Ghana’s construction workforce and their opinions of the phenomenon under investigation. Out of 96 questionnaires administered, 61 were retrieved. The data obtained were analysed by using mean score ranking, relative important index, one sample t-test and multiple regression. The reliability of the scale was checked by using Cronbach’s alpha coefficient.
Findings
From the t-test analysis, 11 variables sourced from extant literature, and the null hypothesis for the study was not rejected and all factors (except high cost of training and improper gender diversity management) were affirmed as negative effects of the multicultural workforce on construction productivity. Using multiple regression analysis, six of the independent variables were shown to impact upon productivity. The goodness of fit was verified by collinearity and residual analysis. The model’s validation revealed a relatively high predictive accuracy (R2 = 0. 589), implying that the results could be generalized. In culmination, these findings suggest that the predictors can be used to accurately predict the effects of multicultural workforce on construction productivity performance.
Practical implications
The findings indicate that multicultural workforce/teams have a substantial effect on overall construction productivity in the construction sector; consequently, stakeholders must address this issue to enhance productivity across the sector.
Originality/value
The current study significantly contributes to our understanding of how multicultural workers/teams affect construction productivity in the construction business perspective and how to respond to the negative menace.
Details
Keywords
Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski
Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…
Abstract
Purpose
Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.
Design/methodology/approach
Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.
Findings
The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.
Research limitations/implications
Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.
Originality/value
Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.
Details
Keywords
Lorenz S. Neuwirth and Jordan Bell
Lead is a well-established environmental contaminant that over the last 50 years has become recognized as a neurotoxin with its greatest concern for the developing child (i.e…
Abstract
Purpose
Lead is a well-established environmental contaminant that over the last 50 years has become recognized as a neurotoxin with its greatest concern for the developing child (i.e. both in-utero and postnatally). What is problematic is that children exposed to lead often come from lower socioeconomic status (SES), are largely Black communities and are further at increased risk for developing adverse childhood experiences (ACEs). The literature on ACEs had focused much on trauma, single parenting, child abuse, lack of finances and stress, etc., but has not considered the intersectionality of these ACEs as risk factors within environmental neurotoxic exposures such as lead poisoning. This is important as most low SES communities are Black. In particular, within the New York City Housing Authority (NYCHA), Black families have been neglected of proper lead-abatement to their apartments for nearly 70 years.
Design/methodology/approach
This is a viewpoint/perspective paper that examines the lived experiences of Black folxs in NYCHA through a Black critical theory (BlackCrit) and antiblackness framework pertaining to ACEs, and lead poisoning within the NYCHA system of New York City. This perspective paper draws upon the last three years of news reports, five decades of publicly available data sets from NYCHA and the comptroller to raise an awareness of how Black children are treated by NYCHA generation after generation which can be argued as a mass atrocity against NYCHA residents. Furthermore, the systematic and institutionalized racism and environmental injustices by NYCHA and the state can also be considered as a crime against humanity. As such, BlackCrit could help to position awareness, advocacy and knowledge about Black folxs residing in NYCHA to achieve fair, safe and affordable public housing to experience Black joy across future generations.
Findings
Thus, rather than civic and state government response efforts focusing their full attention and resources to serving and supporting individuals affected by ACEs they should equally consider the environments in which Black people live and also allocate funds proportionally to address these areas often overlooked. Moreover, proportions of these funds should be redirected especially to lead-abatement and removal of known sources of lead exposures, evaluation of suspected sources of lead exposures (i.e. drinking water, baby food and formula, children’s juice and cereal products, superfund and other waste sites, electronic recycling plants, etc.) and accompanied by all affected children undergoing full and comprehensive neuropsychological testing and follow up studies paid for by the state. The goal should have two fundamental objectives: (1) accepting accountability for failing to address these preventable neuropsychological issues directly affecting Black children generation after generation and (2) offering the proper waived or reimbursable supports and resources to help Black children sustain the best quality of life (QOL) trajectory possible when diagnosed with lead poisoning.
Research limitations/implications
The manuscript is a viewpoint/perspective paper grounded in BlackCrit and an antiblackness framework. There are ample public news reports and public data available from NYCHA on these matters over the last three years. However, the scope of this paper was not to delve too deep into these numbers per se, but rather to address the concerns leading up to and arguably contributing to, at least in part, to these numbers of lead-exposed Black children in NYCHA. Lead poisoning has never been considered as an ACE and its relationship to mass atrocity research is novel which may pave a new avenue for research of this kind through the utility of BlackCrit and antiblackness framework to support and advocate for change so that Black children can be provided with a basic human right of safe housing and experience Black joy.
Practical implications
BlackCrit has not been used in the context of lead poisoning research. Mostly individuals and families of middle- and low-income have been studied in the context of poverty and lead poisoning. However, many people who live in poverty, in public housing, within New York are Black. Thus, Black children are generation after generation exposed to unaddressed lead-abatement and it appears that now more than ever BlackCrit should become the framework for how this work should be discussed in the literature to raise awareness to state governments regarding Black folx's persistent lead poisoning, NYCHA's neglect and mass atrocity research as a long overdue advocacy effort to bring the necessary voice, authentic narrative, and actual knowledge of the lived experiences of Black families in NYCHA with lead poisoning.
Social implications
The goal of this viewpoint/perspective paper should have two fundamental objectives (1) NYCHA and New York State accepting accountability for failing to address these preventable lead poisoning issues directly affecting Black children; and (2) offering the proper support and resources to help Black children sustain the best QOL trajectory possible when diagnosed with lead poisoning.
Originality/value
Lead poisoning research has never been approached through a mass atrocity and BlackCrit framework and perspective. This is the first report on bridging these fields within the context of NYCHA public housing neglect of lead-abatement and continued poisoning of current and future generations of Black children. This failure of NYCHA lead-abatement contributes annually to economic loss in New York State for many years to come which could be entirely avoided.
Details