Search results
1 – 10 of 18
Benjamin Jowett, David John Edwards and Mohamad Kassem
This study aims to develop a taxonomy of requirements for mobile BIM technologies (MBT), clarify the relating terms and concepts, and identify the interactions between MBT…
Abstract
Purpose
This study aims to develop a taxonomy of requirements for mobile BIM technologies (MBT), clarify the relating terms and concepts, and identify the interactions between MBT features and the construction management functions on sites.
Design/methodology/approach
A positivist approach with elements of interpretivism is adopted to allow to capture what is perceived as “reality” in relation to individuals’ interpretation and experience in the use and implementation of MBT. This is achieved by using a mixed qualitative-quantitative approach that can capture the various understandings of MBT. The research methods included a longitudinal case study over 12 months, two project workshops, expert interviews and an industry survey that together helped to investigate MBT at project, enterprise and industry levels.
Findings
The MBT requirements taxonomy included requirements relating to both project and organisation. Project requirements addressed MBT functionalities for sites and information management, while organisation requirements focused on the integration of MBT solutions with the enterprise from information technology, legal and security perspectives. A detailed matrix showing the interactions between five key MBT features and seven construction management functions was also developed.
Research limitations/implications
The two constructs developed by this study can help researchers to structure their investigation of key uses of MBT applications and their benefits. It can be used by researchers aiming to investigate integrated approaches to the digitalisation of construction sites, such as those enabled by Digital Twins. The interaction matrix can aid researchers in evaluating the intersections between the MBT functionalities and the site construction management functions (e.g. theoretical analysis of interactions from Lean Construction, benefit evaluation perspective). More broadly, the two constructs can support research and practice investigating the development of data-driven approaches on construction sites.
Practical implications
The developed MBT taxonomy can guide construction organisations in selecting suitable MBT for Field BIM for their projects. It can also act as a baseline against which varying MBT solutions can be compared.
Originality/value
Constructs such as taxonomies for MBTs; an understanding of MBT capabilities and use within the industry; and a lack of delineation between related terms, such as Mobile BIM, Field BIM, Site BIM, Cloud BIM and Mobile Apps, were lacking in the literature. This study contributed to addressing this gap.
Details
Keywords
The aim of the paper is to examine the various aspects of the 1MDB scandal including the extent and types of corruption that occurred and the action taken to deal with them. In…
Abstract
Purpose
The aim of the paper is to examine the various aspects of the 1MDB scandal including the extent and types of corruption that occurred and the action taken to deal with them. In doing this, the paper seeks to identify the reasons for the scandal and the lessons that can be learnt to avoid such a scandal in Malaysia and elsewhere in the future.
Design/methodology/approach
The research for the paper is based on evidence from court hearings, reports of watchdog and regulatory agencies, media reports, and various articles and books written about 1MDB.
Findings
The paper shows that most of the scandal involved embezzlement, bribery, false declarations and bond mispricing relating to extensive borrowing by 1MDB, and entailed a global network of shell companies and individuals through which the illicit money was passed. It also shows weak governance in 1MDB, poor internal controls within banks, the failure of watchdog and enforcement bodies to take the necessary action partly due to political control over them, and overall the lack of political will to deal with the scandal.
Originality/value
The paper builds on the findings of other papers and books written on the 1MDB scandal. It does this by linking the corruption to the borrowings of 1MDB, the international network of money-laundering and bribery through which illicit money flowed, and the poor internal controls in the organisation. It also builds on previous research by highlighting the failure of banks to identify money-laundering and of watchdog and enforcement bodies to deal with the corruption. A further value of the paper is to identify the lessons that can be learnt about combatting corruption on such a scale.
Details
Keywords
Abstract