Article
Publication date: 12 July 2023

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David J. Edwards and Eric Asamoah

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide…

Abstract

Purpose

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana.

Design/methodology/approach

A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model.

Findings

The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%.

Originality/value

To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 5 December 2023

Atul Kumar Singh and V.R. Prasath Kumar

Blockchain is a developing technology that affects numerous industries, including facility management (FM). Many barriers are associated with adopting blockchain-enabled building…

Abstract

Purpose

Blockchain is a developing technology that affects numerous industries, including facility management (FM). Many barriers are associated with adopting blockchain-enabled building information modeling (BEBIM) in FM. This research aims to identify and prioritize the barriers to adopting BEBIM in FM.

Design/methodology/approach

To address the knowledge gap, this study employs a two-phase methodology for evaluating the barriers to adopting BEBIM in FM. The first phase involves a comprehensive literature review identifying 14 barriers to BEBIM adoption. Using a Delphi approach, the identified barriers were categorized into 6 groups and finalized by 11 experts, adding 3 more barriers to the list. The best-worst method (BWM) determines the priority weights of identified barriers and sub-barriers in the second phase.

Findings

This study reveals that adopting BEBIM for FM in India faces significant hurdles. The most critical barriers are “limited collaboration” and “communication among stakeholders,” “legal constraints in certain jurisdictions” and “challenges in establishing trust and governance models.” To mitigate these barriers, stakeholders should foster collaboration and communication, develop efficient blockchain technology (BT) and establish a trust and governance model.

Practical implications

This work underscores the importance of formulating effective strategies to overcome the identified barriers and emphasizes implications that can assist policymakers and industry stakeholders in achieving successful BEBIM adoption for improved FM practice.

Originality/value

The study provides valuable insights for policymakers, construction industry stakeholders and facility managers interested in leveraging this technology to improve the efficiency and effectiveness of FM practice in India.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 22 March 2024

Atul Kumar Singh and V.R.Prasath Kumar

Implementing blockchain in sustainable development goals (SDGs) and environmental, social and governance (ESG)-aligned infrastructure development involves intricate strategic…

Abstract

Purpose

Implementing blockchain in sustainable development goals (SDGs) and environmental, social and governance (ESG)-aligned infrastructure development involves intricate strategic factors. Despite technological advancements, a significant research gap persists, particularly in emerging economies. This study aims to address the challenges related to SDGs and ESG objectives during infrastructure delivery remain problematic, identifying and evaluating critical strategic factors for successful blockchain implementation.

Design/methodology/approach

This study employs a three-stage methodology. Initially, 13 strategic factors are identified through a literature review and validated by conducting semi-structured interviews with six experts. In the second stage, the data were collected from nine additional experts. In the final stage, the collected data undergoes analysis using interpretive structural modeling (ISM)–cross-impact matrix multiplication applied to classification (MICMAC), aiming to identify and evaluate the independent and dependent powers of strategic factors driving blockchain implementation in infrastructure development for SDGs and ESG objectives.

Findings

The study’s findings highlight three significant independent factors crucial for successfully integrating blockchain technology (BT) into infrastructure development for SDGs and ESG goals: data security (F4), identity management (F8) and supply chain management (F7). The study unravels these factors, hierarchical relationships and dependencies by applying the MICMAC and ISM techniques, emphasizing their interconnectedness.

Originality/value

This study highlights critical strategic factors for successful blockchain integration in SDG and ESG-aligned infrastructure development, offering insights for policymakers and practitioners while emphasizing the importance of training and infrastructure support in advancing sustainable practices.

Open Access
Article
Publication date: 6 July 2022

Klara Granheimer, Tina Karrbom Gustavsson and Per Erik Eriksson

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the…

Abstract

Purpose

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the uncertainties. Despite that, studies on the public procurement of engineering services are scarce. Although scholars have shown that uncertainty may affect the choice of control modes, the level of uncertainty that characterises services is not addressed by the two task characteristics: knowledge of the transformation process and output measurability. The purpose is to investigate organisational control in public procurement of engineering services.

Design/methodology/approach

The existing control model was adjusted in this study by conceptually adding uncertainty as a third aspect to the two task characteristics. A single case study of the Swedish Transport Administration was used. The empirical data, comprising 14 interviews with managers from the client and engineering consulting companies, were analysed using flexible pattern matching and visual mapping approaches and then illustrated using the model.

Findings

The public client did not base its choice of control modes on uncertainty, but rather on the other two task characteristics. Consequently, the service providers argued that the chosen control modes reduced their creativity, increased their financial risks and caused unclear responsibilities. This study therefore shows that uncertainty is an important factor to consider in the choice of control modes, both from a theoretical perspective and from the service providers' point of view. The developed model may therefore be useful for researchers as well as practitioners.

Originality/value

This study is the first attempt to add uncertainty as a task characteristic when choosing control modes. The results contribute to the scarce control literature regarding the procurement of engineering services for construction projects and the procurement of other services with high uncertainty.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 February 2022

Bankole Osita Awuzie, Zwelinzima P. Mcwari, Progress Shingai Chigangacha, Clinton Ohis Aigbavboa, Theo C. Haupt and Lovelin Obi

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project…

Abstract

Purpose

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project failure has continued unabated despite this shift by public-sector entities. Also, there appears to be limited literature focussed on seeking to provide the rationale governing the decision to outsource or insource consultancy services by public-sector organisations. The purpose of this study was to appraise the performance of public-sector projects in which consultancy services have been outsourced or insourced. These are the gaps which this study was undertaken to fill.

Design/methodology/approach

A grounded theory methodology (GTM) research design was adopted based on the nature of evidence sought and gathered from a Provincial Department of Public Works and Infrastructure (PDPWI) in South Africa. Data was obtained from a mixture of semi-structured interviews and project-specific documents spanning a five-year period and was analysed according to the procedures associated with GTM. Accordingly, open coding, axial coding and pattern matching were carried out at several intervals to develop categories and themes.

Findings

The findings of the study showed the absence of a structured approach within the PDPWI for facilitating decisions pertaining to outsourcing or insourcing consultancy services within construction projects. Furthermore, the study established that both approaches yielded similar results across all performance facets of cost, time and quality. In addition, a detailed insight into the steps required for the successful application of GTM in built environment research has been provided in the study.

Originality/value

Limited studies have been undertaken to compare the impact of either outsourced or insourced services on the organisational and project performance. This was the gap to which the study reported in this paper was undertaken to contribute.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 18 April 2024

John Aliu, Ayodeji Emmanuel Oke, Isaac I. Akinwumi, Rislan Abdulazeez Kanya and Lydia Uyi Ehiosun

This study aimed to investigate and analyze the level of awareness and adoption of distributed ledger technologies (DLTs) within the Nigerian construction industry. The focus was…

Abstract

Purpose

This study aimed to investigate and analyze the level of awareness and adoption of distributed ledger technologies (DLTs) within the Nigerian construction industry. The focus was on addressing the current state of DLT utilization, identifying challenges and opportunities and proposing strategies to enhance the integration of DLTs into the construction processes and practices of Nigerian professionals and organizations.

Design/methodology/approach

The research was underpinned by a robust theoretical and conceptual framework, drawing from established theories of technology adoption. A comprehensive literature review guided the identification of various DLT types. This informed the development of a well-structured questionnaire, which was then distributed to Nigerian construction professionals. The collected data underwent analysis using percentages, frequencies, mean scores, the Kruskal–Wallis H-test and the Shapiro–Wilk test.

Findings

A significant finding of this study reveals a generally low awareness and implementation of DLT among construction professionals in Nigeria. These findings emphasize the urgent need for comprehensive strategies to bridge the gap between awareness and adoption of DLT within the Nigerian construction industry.

Practical implications

Industry associations, regulatory bodies and educational institutions can collaborate to develop specialized programs aimed at familiarizing professionals with the benefits and applications of DLTs. Additionally, technology providers and policymakers can leverage these findings to design user-friendly interfaces and guidelines for seamless DLT integration into construction processes.

Originality/value

This study contributes to the existing body of knowledge by providing a comprehensive assessment of the awareness and adoption of DLTs specifically within the Nigerian construction industry. While the global recognition of DLT’s potential in construction is acknowledged, this research delves into a regional context, shedding light on the specific opportunities within Nigeria. Furthermore, the study’s identification of a gap between awareness and implementation highlights a critical area for future exploration and development in the field of construction technology adoption.

Details

Technological Sustainability, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2754-1312

Keywords

Abstract

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Article
Publication date: 26 March 2024

Mughees Aslam, Edmund Baffoe-Twum and Sohail Malik

Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the…

Abstract

Purpose

Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the construction sector of Pakistan, it has not been extensively explored. This study aims to address this knowledge gap by identifying and predicting current lean practices and assessing the strengths and weaknesses of LC implementation in Pakistan.

Design/methodology/approach

Using robust statistical methods to analyze 92 valid responses, the study reveals that approximately 54% of lean practices are currently in use in the construction industry of Pakistan, with a population mean ranging from 52.7% to 55.6%.

Findings

Surprisingly, the research identifies instances where some construction firms in Pakistan are implementing LC practices, even though they have only a limited understanding of its underlying principles. Notably, certain subprinciples, such as visual management, top management commitment to change, employee training, process cycle time reduction and production optimization, are less integrated within the construction industry. Exploring the possibility of implementing LC, recommendations for strategies to implement LC in Pakistan are suggested, aligning with the conceptual model proposed by the researchers.

Originality/value

The novelty of this work offers insights that can serve as a comprehensive guide for developing nations. It provides a structured approach to assess and benchmark LC practices, which, in turn, can contribute to a more efficient and effective construction industry. Moreover, the strategies proposed in this research can aid developing countries in the efficient implementation of LC. This will have a positive implication for both economic and developmental outcomes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 April 2022

Ewald Kuoribo, Peter Amoah, Ernest Kissi, David John Edwards, Jacob Anim Gyampo and Wellington Didibhuku Thwala

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work…

Abstract

Purpose

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work outside of their geographical spectrum; however, the multicultural dissimilarities of construction workforces within the project management team (and how these may impact upon project productivity performance) have been given scant academic attention. To bridge this knowledge gap, this paper aims to analyse the effects of a multicultural workforce on construction productivity.

Design/methodology/approach

The epistemological positioning of the research adopted mixed philosophies (consisting of both interpretivism and postpositivism) to undertake a deductive and cross-sectional survey to collate primary quantitative data collected via a closed-ended structured questionnaire. Census sampling and convenience sampling techniques were adopted to target Ghana’s construction workforce and their opinions of the phenomenon under investigation. Out of 96 questionnaires administered, 61 were retrieved. The data obtained were analysed by using mean score ranking, relative important index, one sample t-test and multiple regression. The reliability of the scale was checked by using Cronbach’s alpha coefficient.

Findings

From the t-test analysis, 11 variables sourced from extant literature, and the null hypothesis for the study was not rejected and all factors (except high cost of training and improper gender diversity management) were affirmed as negative effects of the multicultural workforce on construction productivity. Using multiple regression analysis, six of the independent variables were shown to impact upon productivity. The goodness of fit was verified by collinearity and residual analysis. The model’s validation revealed a relatively high predictive accuracy (R2 = 0. 589), implying that the results could be generalized. In culmination, these findings suggest that the predictors can be used to accurately predict the effects of multicultural workforce on construction productivity performance.

Practical implications

The findings indicate that multicultural workforce/teams have a substantial effect on overall construction productivity in the construction sector; consequently, stakeholders must address this issue to enhance productivity across the sector.

Originality/value

The current study significantly contributes to our understanding of how multicultural workers/teams affect construction productivity in the construction business perspective and how to respond to the negative menace.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531