Search results

1 – 10 of 950
Article
Publication date: 4 December 2023

Ahmed M. Attia, Ahmad O. Alatwi, Ahmad Al Hanbali and Omar G. Alsawafy

This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.

Abstract

Purpose

This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.

Design/methodology/approach

A mixed-integer nonlinear programming (MINLP) model is developed to study the relation between production makespan, energy consumption, maintenance actions and footprint, i.e. service level and sustainability measures. The speed scaling technique is used to control energy consumption, the capping policy is used to control CO2 footprint and preventive maintenance (PM) is used to keep the machine working in healthy conditions.

Findings

It was found that ignoring maintenance activities increases the schedule makespan by more than 21.80%, the total maintenance time required to keep the machine healthy by up to 75.33% and the CO2 footprint by 15%.

Research limitations/implications

The proposed optimization model can simultaneously be used for maintenance planning, job scheduling and footprint minimization. Furthermore, it can be extended to consider other maintenance activities and production configurations, e.g. flow shop or job shop scheduling.

Practical implications

Maintenance planning, production scheduling and greenhouse gas (GHG) emissions are intertwined in the industry. The proposed model enhances the performance of the maintenance and production systems. Furthermore, it shows the value of conducting maintenance activities on the machine's availability and CO2 footprint.

Originality/value

This work contributes to the literature by combining maintenance planning, single-machine scheduling and environmental aspects in an integrated MINLP model. In addition, the model considers several practical features, such as machine-aging rate, speed scaling technique to control emissions, minimal repair (MR) and PM.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 27 July 2023

Guihang Liu, Runxia Guo and Jiusheng Chen

Maintenance stands are the most valuable maintenance resources and provide the necessary maintenance space and maintenance facilities for aircraft maintenance. To expand the…

Abstract

Purpose

Maintenance stands are the most valuable maintenance resources and provide the necessary maintenance space and maintenance facilities for aircraft maintenance. To expand the maintenance market, maintenance, repair and overhaul (MRO) urgently need to achieve a reasonable schedule between aircraft maintenance requirements and maintenance stand capability to improve aircraft maintenance continuity and reduce the risk of scratching due to aircraft movement. This study aims to design a maintenance stand scheduling (MSS) model based on spatiotemporal constraints to solve the problem of maintenance stand schedules.

Design/methodology/approach

To address the problem of maintenance stand schedules, this study introduces mixed-integer programming algorithm to design the MSS model on the basis of classical hybrid flow shop structure. When designing the optimization objective function of MSS modeling, the spatiotemporal constraints are mainly considered. Specifically, first, the spatial constraints between maintenance stands are fully considered so that more aircraft can be parked in the workshop. Second, the optimization objective is designed to minimize the number of aircraft movements by defining multiple maintenance capabilities of the stand. Finally, a solution based on spatiotemporal constraints is proposed in the solving process.

Findings

A set of MRO production data from Guangzhou is used as a test data set to demonstrate the effectiveness of the proposed MSS model.

Originality/value

The types of maintenance stands are defined and divided into four categories: fixed stand, temporary stand, half-body stand and engine ground test stand, which facilitates optimal modeling; a new scheduling model is designed considering both temporal constraints and spatial constraints, which can improve both the utilization of maintenance stand and safety (reduce the risk of scratching between aircraft).

Details

Aircraft Engineering and Aerospace Technology, vol. 95 no. 10
Type: Research Article
ISSN: 1748-8842

Keywords

Article
Publication date: 24 November 2023

Iman Rastgar, Javad Rezaeian, Iraj Mahdavi and Parviz Fattahi

The purpose of this study is to propose a new mathematical model that integrates strategic decision-making with tactical-operational decision-making in order to optimize…

Abstract

Purpose

The purpose of this study is to propose a new mathematical model that integrates strategic decision-making with tactical-operational decision-making in order to optimize production and scheduling decisions.

Design/methodology/approach

This study presents a multi-objective optimization framework to make production planning, scheduling and maintenance decisions. An epsilon-constraint method is used to solve small instances of the model, while new hybrid optimization algorithms, including multi-objective particle swarm optimization (MOPSO), non-dominated sorting genetic algorithm, multi-objective harmony search and improved multi-objective harmony search (IMOHS) are developed to address the high complexity of large-scale problems.

Findings

The computational results demonstrate that the metaheuristic algorithms are effective in obtaining economic solutions within a reasonable computational time. In particular, the results show that the IMOHS algorithm is able to provide optimal Pareto solutions for the proposed model compared to the other three algorithms.

Originality/value

This study presents a new mathematical model that simultaneously determines green production planning and scheduling decisions by minimizing the sum of the total cost, makespan, lateness and energy consumption criteria. Integrating production and scheduling of a shop floor is critical for achieving optimal operational performance in production planning. To the best of the authors' knowledge, the integration of production planning and maintenance has not been adequately addressed.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 27 November 2023

Velmurugan Kumaresan, S. Saravanasankar and Gianpaolo Di Bona

Through the use of the Markov Decision Model (MDM) approach, this study uncovers significant variations in the availability of machines in both faulty and ideal situations in…

Abstract

Purpose

Through the use of the Markov Decision Model (MDM) approach, this study uncovers significant variations in the availability of machines in both faulty and ideal situations in small and medium-sized enterprises (SMEs). The first-order differential equations are used to construct the mathematical equations from the transition-state diagrams of the separate subsystems in the critical part manufacturing plant.

Design/methodology/approach

To obtain the lowest investment cost, one of the non-traditional optimization strategies is employed in maintenance operations in SMEs in this research. It will use the particle swarm optimization (PSO) algorithm to optimize machine maintenance parameters and find the best solutions, thereby introducing the best decision-making process for optimal maintenance and service operations.

Findings

The major goal of this study is to identify critical subsystems in manufacturing plants and to use an optimal decision-making process to adopt the best maintenance management system in the industry. The optimal findings of this proposed method demonstrate that in problematic conditions, the availability of SME machines can be enhanced by up to 73.25%, while in an ideal situation, the system's availability can be increased by up to 76.17%.

Originality/value

The proposed new optimal decision-support system for this preventive maintenance management in SMEs is based on these findings, and it aims to achieve maximum productivity with the least amount of expenditure in maintenance and service through an optimal planning and scheduling process.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 14 December 2023

Maren Hinrichs, Loina Prifti and Stefan Schneegass

With production systems become more digitized, data-driven maintenance decisions can improve the performance of production systems. While manufacturers are introducing predictive…

Abstract

Purpose

With production systems become more digitized, data-driven maintenance decisions can improve the performance of production systems. While manufacturers are introducing predictive maintenance and maintenance reporting to increase maintenance operation efficiency, operational data may also be used to improve maintenance management. Research on the value of data-driven decision support to foster increased internal integration of maintenance with related functions is less explored. This paper explores the potential for further development of solutions for cross-functional responsibilities that maintenance shares with production and logistics through data-driven approaches.

Design/methodology/approach

Fifteen maintenance experts were interviewed in semi-structured interviews. The interview questions were derived based on topics identified through a structured literature analysis of 126 papers.

Findings

The main findings show that data-driven decision-making can support maintenance, asset, production and material planning to coordinate and collaborate on cross-functional responsibilities. While solutions for maintenance planning and scheduling have been explored for various operational conditions, collaborative solutions for maintenance, production and logistics offer the potential for further development. Enablers for data-driven collaboration are the internal synchronization and central definition of goals, harmonization of information systems and information visualization for decision-making.

Originality/value

This paper outlines future research directions for data-driven decision-making in maintenance management as well as the practical requirements for implementation.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 26 May 2023

Mpho Trinity Manenzhe, Arnesh Telukdarie and Megashnee Munsamy

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

1732

Abstract

Purpose

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

Design/methodology/approach

The extant literature in physical assets maintenance depicts that poor maintenance management is predominantly because of a lack of a clearly defined maintenance work management process model, resulting in poor management of maintenance work. This paper solves this complex phenomenon using a combination of conceptual process modeling and system dynamics simulation incorporating 4IR technologies. A process for maintenance work management and its control actions on scheduled maintenance tasks versus unscheduled maintenance tasks is modeled, replicating real-world scenarios with a digital lens (4IR technologies) for predictive maintenance strategy.

Findings

A process for maintenance work management is thus modeled and simulated as a dynamic system. Post-model validation, this study reveals that the real-world maintenance work management process can be replicated using system dynamics modeling. The impact analysis of 4IR technologies on maintenance work management systems reveals that the implementation of 4IR technologies intensifies asset performance with an overall gain of 27.46%, yielding the best maintenance index. This study further reveals that the benefits of 4IR technologies positively impact equipment defect predictability before failure, thereby yielding a predictive maintenance strategy.

Research limitations/implications

The study focused on maintenance work management system without the consideration of other subsystems such as cost of maintenance, production dynamics, and supply chain management.

Practical implications

The maintenance real-world quantitative data is retrieved from two maintenance departments from company A, for a period of 24 months, representing years 2017 and 2018. The maintenance quantitative data retrieved represent six various types of equipment used at underground Mines. The maintenance management qualitative data (Organizational documents) in maintenance management are retrieved from company A and company B. Company A is a global mining industry, and company B is a global manufacturing industry. The reliability of the data used in the model validation have practical implications on how maintenance work management system behaves with the benefit of 4IR technologies' implementation.

Social implications

This research study yields an overall benefit in asset management, thereby intensifying asset performance. The expected learnings are intended to benefit future research in the physical asset management field of study and most important to the industry practitioners in physical asset management.

Originality/value

This paper provides for a model in which maintenance work and its dynamics is systematically managed. Uncontrollable corrective maintenance work increases the complexity of the overall maintenance work management. The use of a system dynamic model and simulation incorporating 4IR technologies adds value on the maintenance work management effectiveness.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 18 October 2022

Zul-Atfi Ismail

The chemical plant (CP) maintenance industry has been under increasing pressure by process designers to demonstrate its evaluation and information management of model checking…

Abstract

Purpose

The chemical plant (CP) maintenance industry has been under increasing pressure by process designers to demonstrate its evaluation and information management of model checking (MC) on the durability’s performance and design of plant control instrument. This main problem has been termed as imperfect maintenance actions (IMAs) level. Although IMAs have been explored in interdisciplinary maintenance environments, less is known about what imperfect maintenance problems currently exist and what their causes are, such as the recent explosion in the Beirut city (4 August 2020, about 181 fatalities). The aim of this paper is to identify how CP maintenance environments could integrate MC within their processes.

Design/methodology/approach

To achieve this aim, a comprehensive literature review of the existing conceptualisation of MC practices is reviewed and the main features of information and communication technology tools and techniques currently being employed on such IMA projects are carried out and synthesised into a conceptual framework for integrating MC in the automation system process.

Findings

The literature reveals that various CP designers conceptualise MC in different ways. MC is commonly shaped by long-term compliance to fulfil the requirement for maintaining a comfortable durability risk on imperfect maintenance schemes of CP projects. Also, there is a lack of common approaches for integrating the delivery process of MC. The conceptual framework demonstrates the importance of early integration of MC in the design phase to identify alternative methods to cogenerate, monitor and optimise MC.

Originality/value

Thus far, this study advances the knowledge about how CP maintenance environments can ensure MC delivery. This paper highlights the need for further research to integrate MC in CP maintenance environments. A future study could validate the framework across the design phase with different CP project designers.

Details

Industrial Management & Data Systems, vol. 123 no. 11
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 26 July 2022

Hiwa Esmaeilzadeh, Alireza Rashidi Komijan, Hamed Kazemipoor, Mohammad Fallah and Reza Tavakkoli-Moghaddam

The proposed model aims to consider the flying hours as a criterion to initiate maintenance operation. Based on this condition, aircraft must be checked before flying hours…

Abstract

Purpose

The proposed model aims to consider the flying hours as a criterion to initiate maintenance operation. Based on this condition, aircraft must be checked before flying hours threshold is met. After receiving maintenance service, the model ignores previous flying hours and the aircraft can keep on flying until the threshold value is reached again. Moreover, the model considers aircraft age and efficiency to assign them to flights.

Design/methodology/approach

The aircraft maintenance routing problem (AMRP), as one of the most important problems in the aviation industry, determines the optimal route for each aircraft along with meeting maintenance requirements. This paper presents a bi-objective mixed-integer programming model for AMRP in which several criteria such as aircraft efficiency and ferrying flights are considered.

Findings

As the solution approaches, epsilon-constraint method and a non-dominated sorting genetic algorithm (NSGA-II), including a new initializing algorithm, are used. To verify the efficiency of NSGA-II, 31 test problems in different scales are solved using NSGA-II and GAMS. The results show that the optimality gap in NSGA-II is less than 0.06%. Finally, the model was solved based on real data of American Eagle Airlines extracted from Kaggle datasets.

Originality/value

The authors confirm that it is an original paper, has not been published elsewhere and is not currently under consideration of any other journal.

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 13 February 2024

José Nogueira da Mata Filho, Antonio Celio Pereira de Mesquita, Fernando Teixeira Mendes Abrahão and Guilherme C. Rocha

This paper aims to explore the optimization process involved in the aircraft maintenance allocation and packing problem. The aircraft industry misses a part of the optimization…

Abstract

Purpose

This paper aims to explore the optimization process involved in the aircraft maintenance allocation and packing problem. The aircraft industry misses a part of the optimization potential while developing maintenance plans. This research provides the modeling foundation for the missing part considering the failure behavior of components, costs involved with all maintenance tasks and opportunity costs.

Design/methodology/approach

The study models the cost-effectiveness of support against the availability to come up with an optimization problem. The mathematical problem was solved with an exact algorithm. Experiments were performed with real field and synthetically generated data, to validate the correctness of the model and its potential to provide more accurate and better engineered maintenance plans.

Findings

The solution procedure provided excellent results by enhancing the overall arrangement of the tasks, resulting in higher availability rates and a substantial decrease in total maintenance costs. In terms of situational awareness, it provides the user with the flexibility to better manage resource constraints while still achieving optimal results.

Originality/value

This is an innovative research providing a state-of-the-art mathematical model and an algorithm for efficiently solving a task allocation and packing problem by incorporating components’ due flight time, failure probability, task relationships, smart allocation of common preparation tasks, operational profile and resource limitations.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

1 – 10 of 950