Search results

1 – 10 of over 1000
Open Access
Article
Publication date: 16 January 2019

Maheshwaran Gopalakrishnan, Anders Skoogh, Antti Salonen and Martin Asp

The purpose of this paper is to increase productivity through smart maintenance planning by including productivity as one of the objectives of the maintenance organization…

5261

Abstract

Purpose

The purpose of this paper is to increase productivity through smart maintenance planning by including productivity as one of the objectives of the maintenance organization. Therefore, the goals of the paper are to investigate existing machine criticality assessment and identify components of the criticality assessment tool to increase productivity.

Design/methodology/approach

An embedded multiple case study research design was adopted in this paper. Six different cases were chosen from six different production sites operated by three multi-national manufacturing companies. Data collection was carried out in the form of interviews, focus groups and archival records. More than one source of data was collected in each of the cases. The cases included different production layouts such as machining, assembly and foundry, which ensured data variety.

Findings

The main finding of the paper is a deeper understanding of how manufacturing companies assess machine criticality and plan maintenance activities. The empirical findings showed that there is a lack of trust regarding existing criticality assessment tools. As a result, necessary changes within the maintenance organizations in order to increase productivity were identified. These are technological advancements, i.e. a dynamic and data-driven approach and organizational changes, i.e. approaching with a systems perspective when performing maintenance prioritization.

Originality/value

Machine criticality assessment studies are rare, especially empirical research. The originality of this paper lies in the empirical research conducted on smart maintenance planning for productivity improvement. In addition, identifying the components for machine criticality assessment is equally important for research and industries to efficient planning of maintenance activities.

Details

International Journal of Productivity and Performance Management, vol. 68 no. 5
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 13 June 2022

Julie Krogh Agergaard, Kristoffer Vandrup Sigsgaard, Niels Henrik Mortensen, Jingrui Ge and Kasper Barslund Hansen

The purpose of this paper is to investigate the impact of early-stage maintenance clustering. Few researchers have previously studied early-stage maintenance clustering…

Abstract

Purpose

The purpose of this paper is to investigate the impact of early-stage maintenance clustering. Few researchers have previously studied early-stage maintenance clustering. Experience from product and service development has shown that early stages are critical to the development process, as most decisions are made during these stages. Similarly, most maintenance decisions are made during the early stages of maintenance development. Developing maintenance for clustering is expected to increase the potential of clustering.

Design/methodology/approach

A literature study and three case studies using the same data set were performed. The case studies simulate three stages of maintenance development by clustering based on the changes available at each given stage.

Findings

The study indicates an increased impact of maintenance clustering when clustering already in the first maintenance development stage. By performing clustering during the identification phase, 4.6% of the planned work hours can be saved. When clustering is done in the planning phase, 2.7% of the planned work hours can be saved. When planning is done in the scheduling phase, 2.4% of the planned work hours can be saved. The major difference in potential from the identification to the scheduling phase came from avoiding duplicate, unnecessary and erroneous work.

Originality/value

The findings from this study indicate a need for more studies on early-stage maintenance clustering, as few others have studied this.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 26 May 2023

Mpho Trinity Manenzhe, Arnesh Telukdarie and Megashnee Munsamy

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

1703

Abstract

Purpose

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

Design/methodology/approach

The extant literature in physical assets maintenance depicts that poor maintenance management is predominantly because of a lack of a clearly defined maintenance work management process model, resulting in poor management of maintenance work. This paper solves this complex phenomenon using a combination of conceptual process modeling and system dynamics simulation incorporating 4IR technologies. A process for maintenance work management and its control actions on scheduled maintenance tasks versus unscheduled maintenance tasks is modeled, replicating real-world scenarios with a digital lens (4IR technologies) for predictive maintenance strategy.

Findings

A process for maintenance work management is thus modeled and simulated as a dynamic system. Post-model validation, this study reveals that the real-world maintenance work management process can be replicated using system dynamics modeling. The impact analysis of 4IR technologies on maintenance work management systems reveals that the implementation of 4IR technologies intensifies asset performance with an overall gain of 27.46%, yielding the best maintenance index. This study further reveals that the benefits of 4IR technologies positively impact equipment defect predictability before failure, thereby yielding a predictive maintenance strategy.

Research limitations/implications

The study focused on maintenance work management system without the consideration of other subsystems such as cost of maintenance, production dynamics, and supply chain management.

Practical implications

The maintenance real-world quantitative data is retrieved from two maintenance departments from company A, for a period of 24 months, representing years 2017 and 2018. The maintenance quantitative data retrieved represent six various types of equipment used at underground Mines. The maintenance management qualitative data (Organizational documents) in maintenance management are retrieved from company A and company B. Company A is a global mining industry, and company B is a global manufacturing industry. The reliability of the data used in the model validation have practical implications on how maintenance work management system behaves with the benefit of 4IR technologies' implementation.

Social implications

This research study yields an overall benefit in asset management, thereby intensifying asset performance. The expected learnings are intended to benefit future research in the physical asset management field of study and most important to the industry practitioners in physical asset management.

Originality/value

This paper provides for a model in which maintenance work and its dynamics is systematically managed. Uncontrollable corrective maintenance work increases the complexity of the overall maintenance work management. The use of a system dynamic model and simulation incorporating 4IR technologies adds value on the maintenance work management effectiveness.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 21 May 2018

Zul-Atfi Bin Ismail

A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites…

1887

Abstract

Purpose

A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites. Contractor social networking is particularly problematic on industrialised building system (IBS) infrastructure maintenance projects where contractor’s certified quality product and firms are not matched with maintenance specialisation services. The paper aims to discuss this issue.

Design/methodology/approach

This paper reports on the early stages of research which is developing a new information and communications technology (ICT)-based approach to managing contractor social networking on IBS infrastructure maintenance schemes. As a precursor to this work, the paper reviews current contractor social networking websites practices on IBS infrastructure maintenance projects and explores the ICT tools and techniques currently being employed on such projects.

Findings

The findings reveal the need for more sophisticated contractor social networking websites solutions which accord with the needs of IBS infrastructure maintenance schemes.

Originality/value

The paper concludes by presenting a research framework for developing such a system in the future.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 January 2022

Babatunde Fatai Ogunbayo, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Opeoluwa Israel Akinradewo

A maintenance budget is an element of maintenance management (MM) that deals with financial planning for maintenance operations and execution within a maintenance organisation…

1589

Abstract

Purpose

A maintenance budget is an element of maintenance management (MM) that deals with financial planning for maintenance operations and execution within a maintenance organisation. Developed countries have standardised MM structures which guides maintenance activities. This, however, cannot be said of developing countries, as there are few or no MM standards adopted. Given this contextual setting, the study aims to validate the relevance of maintenance budget (MB) elements utilised in developed countries for developing countries – using Nigeria as a case study exemplar. Also, the study further examines the effectiveness of the validated maintenance budget elements.

Design/methodology/approach

The research adopts qualitative techniques and employs the Delphi survey to collect and analyse primary data from an operational perception through structured questionnaires to solicit views from panellists on the subject being assessed. A relative importance index (RII) was used in measuring consensus for the Delphi study outcomes, while a Cronbach Alpha test was carried out on all the MB elements to determine their level of reliability.

Findings

The key finding from the study reveals that of the 21 elements that influence the implementation of MB, 10 elements have a very high influence on the MM of buildings (VHI: 9.00–10.00), 5 elements had a high influence (HI: 7.00–8.99) and 6 other elements scored medium impact (MI: 5.00–6.99). The elements of MB that recorded very high influence on prompt MM effectiveness include MB implementation, corruption-free maintenance process, reduction in maintenance expenditure, maintenance financial plan, cost implication of maintained asset, cash flow indexing, prioritisation of maintenance financing, maintenance funding, incorporation of financial indicators and audit of operational maintenance cost.

Practical implications

On a practical note, these elements will guide the built environment professionals in organising maintenance activities to best use limited resources.

Originality/value

Cumulatively, the research presented shows that these elements are similar to those of other countries. Effective MM of buildings is assured when these elements are integral to developing a MB.

Details

Built Environment Project and Asset Management, vol. 12 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 9 April 2018

Maheshwaran Gopalakrishnan and Anders Skoogh

The purpose of this paper is to identify the productivity improvement potentials from maintenance planning practices in manufacturing companies. In particular, the paper aims at…

5358

Abstract

Purpose

The purpose of this paper is to identify the productivity improvement potentials from maintenance planning practices in manufacturing companies. In particular, the paper aims at understanding the connection between machine criticality assessment and maintenance prioritization in industrial practice, as well as providing the improvement potentials.

Design/methodology/approach

An explanatory mixed method research design was used in this study. Data from literature analysis, a web-based questionnaire survey, and semi-structured interviews were gathered and triangulated. Additionally, simulation experimentation was used to evaluate the productivity potential.

Findings

The connection between machine criticality and maintenance prioritization is assessed in an industrial set-up. The empirical findings show that maintenance prioritization is not based on machine criticality, as criticality assessment is non-factual, static, and lacks system view. It is with respect to these finding that the ways to increase system productivity and future directions are charted.

Originality/value

In addition to the empirical results showing productivity improvement potentials, the paper emphasizes on the need for a systems view for solving maintenance problems, i.e. solving maintenance problems for the whole factory. This contribution is equally important for both industry and academics, as the maintenance organization needs to solve this problem with the help of the right decision support.

Details

International Journal of Productivity and Performance Management, vol. 67 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 20 July 2023

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Mohd Isa Rohayati and Nor Malina Malek

Inadequate strategic planning and maintenance budget may undermine the maintenance of the Higher Education Institution Building (HEIB). Studies have shown that a customised…

Abstract

Purpose

Inadequate strategic planning and maintenance budget may undermine the maintenance of the Higher Education Institution Building (HEIB). Studies have shown that a customised maintenance concept such as Soft System Methodology (SSM) can improve public building maintenance operations. There is a paucity of studies regarding public HEIB maintenance in Nigeria via an SSM approach. Therefore, the research investigated the state of public HEIB and developed a framework to improve public HEIB maintenance practices in Nigeria.

Design/methodology/approach

The research adopted SSM to understand Nigeria’s public HEIB maintenance practices. The SSM permitted a substitute approach to improve public HEIB maintenance practices via a developed framework. Data were collated via virtual interviews with experts, and findings were presented in line with the SSM seven steps.

Findings

Findings show that besides the shoddy state of public HEIB maintenance, there is no public digitalised HEIB framework to improve maintenance practices across Nigeria’s higher education institutions. The study developed a digitalised framework with the support of Computerised Maintenance Management System from the findings. It would reposition the public HEIB and stir up various agencies/departments/units managing maintenance for better service delivery via integrated delivery, practical, methodological and managerial aspects.

Originality/value

The research investigated Nigeria’s public HEIB maintenance practices via SSM to identify the required document and propose a feasible framework to improve Nigeria’s HEIB maintenance practices. Besides the developed conceptual framework, Nigeria’s HEIB maintenance practitioners and higher institution chief executives can use the recommended framework as guidelines to improve HEIB maintenance practices.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 30 April 2021

Camilla Lundgren, Jon Bokrantz and Anders Skoogh

Technological advancements are reshaping the manufacturing industry toward digitalized manufacturing. Despite the importance of top-class maintenance in such systems, many…

4193

Abstract

Purpose

Technological advancements are reshaping the manufacturing industry toward digitalized manufacturing. Despite the importance of top-class maintenance in such systems, many industrial companies lack a clear strategy for maintenance in digitalized manufacturing. The purpose of this paper is to facilitate the implementation of maintenance in digitalized manufacturing by proposing a strategy development process for the Smart Maintenance concept.

Design/methodology/approach

This study is designed as a multiple-case study, where the strategy development in three industrial cases is analyzed. Several methods were used to collect data on the case companies' development of smart maintenance strategies. The data were analyzed with an inductive approach.

Findings

A process of strategy development for smart maintenance is proposed, including six steps: benchmarking, setting clear goals, setting strategic priority, planning key activities, elevating implementation and follow-up.

Practical implications

The proposed process provides industry practitioners with a step-by-step guide for the development of a clear smart maintenance strategy, based on the current state of their maintenance organization. This creates employee engagement and is a new way of developing maintenance strategies.

Originality/value

Maintenance strategies are traditionally regarded as a selection of corrective/reactive and preventive maintenance actions using a top-down approach. By contrast, the proposed process is starting from the current state of the maintenance organization and allows a mixture of top-down and bottom-up approaches, supporting organizational development. This is a rare perspective of maintenance strategies and will make maintenance organizations ready for the demands of digitalized manufacturing.

Details

Journal of Manufacturing Technology Management, vol. 32 no. 9
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 21 June 2022

Babatunde Fatai Ogunbayo, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Opeoluwa Israel Akinradewo and David Edwards

Maintenance policy is an element of building maintenance management that deals with organisation policy, planning and procedures, and delineates how maintenance units in an…

1171

Abstract

Purpose

Maintenance policy is an element of building maintenance management that deals with organisation policy, planning and procedures, and delineates how maintenance units in an organisation will manage specific building components, auxiliary facilities and services. Given this contextual setting, this study investigates whether organisational maintenance policies (OMPs) utilised in developed countries are relevant in developing countries – using Nigeria as a case study exemplar.

Design/methodology/approach

An empirical research design (using deductive reasoning) was implemented for this research. Specifically, a Delphi study conducted revealed 23 elements that impact OMP development in Nigeria.

Findings

Of these twenty elements, six had a very high impact on maintenance management (VHI: 9.00–10.00), nine variables had a high impact (HI: 7.00–8.99) and eight other variables scored a medium impact (MI: 5.00–6.99). Emergent findings reveal that the elements of organisational maintenance policy that engender effective building maintenance management include preparation of safety procedure, optimisation of the maintenance policy, optimisation of the maintenance action plan, well-defined priority system, risk factor establishment, suitable maintenance procedures and a clearly delineated process.

Practical implications

The study findings will guide policymakers in identifying the main elements required in maintenance policies development towards making national public asset preservation and economic gains. Also, the content of the future educational curriculum on maintenance management study will be more receptive to the body of knowledge and the built environment industry.

Originality/value

Cumulatively, the research presented illustrates that these elements replicate those adopted in other countries and that effective maintenance management of public buildings is assured when these elements are integral to the development of an OMP.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

1 – 10 of over 1000