Search results
1 – 10 of over 1000Jingrui Ge, Kristoffer Vandrup Sigsgaard, Bjørn Sørskot Andersen, Niels Henrik Mortensen, Julie Krogh Agergaard and Kasper Barslund Hansen
This paper proposes a progressive, multi-level framework for diagnosing maintenance performance: rapid performance health checks of key performance for different equipment groups…
Abstract
Purpose
This paper proposes a progressive, multi-level framework for diagnosing maintenance performance: rapid performance health checks of key performance for different equipment groups and end-to-end process diagnostics to further locate potential performance issues. A question-based performance evaluation approach is introduced to support the selection and derivation of case-specific indicators based on diagnostic aspects.
Design/methodology/approach
The case research method is used to develop the proposed framework. The generic parts of the framework are built on existing maintenance performance measurement theories through a literature review. In the case study, empirical maintenance data of 196 emergency shutdown valves (ESDVs) are collected over a two-year period to support the development and validation of the proposed approach.
Findings
To improve processes, companies need a separate performance measurement structure. This paper suggests a hierarchical model in four layers (objective, domain, aspect and performance measurement) to facilitate the selection and derivation of indicators, which could potentially reduce management complexity and help prioritize continuous performance improvement. Examples of new indicators are derived from a case study that includes 196 ESDVs at an offshore oil and gas production plant.
Originality/value
Methodological approaches to deriving various performance indicators have rarely been addressed in the maintenance field. The proposed diagnostic framework provides a structured way to identify and locate process performance issues by creating indicators that can bridge generic evaluation aspects and maintenance data. The framework is highly adaptive as data availability functions are used as inputs to generate indicators instead of passively filtering out non-applicable existing indicators.
Details
Keywords
Camilla Lundgren, Jon Bokrantz and Anders Skoogh
The purpose of this study is to ensure productive, robust and sustainable production systems and realise digitalised manufacturing trough implementation of Smart Maintenance – “an…
Abstract
Purpose
The purpose of this study is to ensure productive, robust and sustainable production systems and realise digitalised manufacturing trough implementation of Smart Maintenance – “an organizational design for managing maintenance of manufacturing plants in environments with pervasive digital technologies”. This paper aims to support industry practitioners in selecting performance indicators (PIs) to measure the effects of Smart Maintenance, and thus facilitate its implementation.
Design/methodology/approach
Intercoder reliability and negotiated agreement were used to analyse 170 maintenance PIs. The PIs were structurally categorised according to the anticipated effects of Smart Maintenance.
Findings
Companies need to revise their set of PIs when changing manufacturing and/or maintenance strategy (e.g. reshape the maintenance organisation towards Smart Maintenance). This paper suggests 13 categories of PIs to facilitate the selection of PIs for Smart Maintenance. The categories are based on 170 PIs, which were analysed according to the anticipated effects of Smart Maintenance.
Practical implications
The 13 suggested categories bring clarity to the measuring potential of the PIs and their relation to the Smart Maintenance concept. Thereby, this paper serves as a guide for industry practitioners to select PIs for measuring the effects of Smart Maintenance.
Originality/value
This is the first study evaluating how maintenance PIs measure the anticipated effects of maintenance in digitalised manufacturing. The methods intercoder reliability and negotiated agreement were used to ensure the trustworthiness of the categorisation of PIs. Such methods are rare in maintenance research.
Details
Keywords
Jingrui Ge, Kristoffer Vandrup Sigsgaard, Julie Krogh Agergaard, Niels Henrik Mortensen, Waqas Khalid and Kasper Barslund Hansen
This paper proposes a heuristic, data-driven approach to the rapid performance evaluation of periodic maintenance on complex production plants. Through grouping, maintenance…
Abstract
Purpose
This paper proposes a heuristic, data-driven approach to the rapid performance evaluation of periodic maintenance on complex production plants. Through grouping, maintenance interval (MI)-based evaluation and performance assessment, potential nonvalue-adding maintenance elements can be identified in the current maintenance structure. The framework reduces management complexity and supports the decision-making process for further maintenance improvement.
Design/methodology/approach
The evaluation framework follows a prescriptive research approach. The framework is structured in three steps, which are further illustrated in the case study. The case study utilizes real-life data to verify the feasibility and effectiveness of the proposed framework.
Findings
Through a case study conducted on 9,538 pieces of equipment from eight offshore oil and gas production platforms, the results show considerable potential for maintenance performance improvement, including up to a 23% reduction in periodic maintenance hours.
Research limitations/implications
The problem of performance evaluation under limited data availability has barely been addressed in the literature on the plant level. The proposed framework aims to provide a quantitative approach to reducing the structural complexity of the periodic maintenance evaluation process and can help maintenance professionals prioritize the focus on maintenance improvement among current strategies.
Originality/value
The proposed framework is especially suitable for initial performance assessment in systems with a complex structure, limited maintenance records and imperfect data, as it reduces management complexity and supports the decision-making process for further maintenance improvement. A similar application has not been identified in the literature.
Details
Keywords
Chiara Franciosi, Valentina Di Pasquale, Raffaele Iannone and Salvatore Miranda
Poor maintenance management leads to non-negligible economic, environmental and social impacts and obstacles to the sustainable manufacturing paradigm. Studies evaluating…
Abstract
Purpose
Poor maintenance management leads to non-negligible economic, environmental and social impacts and obstacles to the sustainable manufacturing paradigm. Studies evaluating maintenance impacts on sustainability underline growing interest in the topic, but reports on the industrial field are lacking. Therefore, this paper investigates the industrial environment and the indicators that manufacturing companies use for measuring their maintenance impacts.
Design/methodology/approach
In this pilot survey study, several stakeholders of production enterprises in the south of Italy were interviewed to unveil the spread of the measurement of maintenance impacts on sustainability and the indicators used by those companies.
Findings
The interview results showed a low level of awareness among stakeholders about maintenance impacts on sustainability. Maintenance stakeholders are mainly focused on technical and economic factors, whereas environmental, quality and safety stakeholders are becoming more aware of maintenance impacts on environmental and social factors. However, both groups need guidelines to define sustainability indicators to assess such impacts.
Originality/value
This exploratory study allowed us to investigate the current situation in industrial organisations and achieve the first variegated and diversified vision of the awareness of company stakeholders on maintenance impacts on the sustainability of several business functions. This paper provides a valuable contribution to “maintenance and sustainability” research area in production contexts and sheds light on non-negligible maintenance impacts on sustainability, providing preliminary insights on the topic and an effective basis for defining future research opportunities. Moreover, this study enables increased awareness among internal and external manufacturing company stakeholders on the role of maintenance in sustainable production.
Details
Keywords
Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore
Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…
Abstract
Purpose
Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.
Design/methodology/approach
Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.
Findings
Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.
Practical implications
The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.
Originality/value
To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.
Details
Keywords
A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites…
Abstract
Purpose
A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites. Contractor social networking is particularly problematic on industrialised building system (IBS) infrastructure maintenance projects where contractor’s certified quality product and firms are not matched with maintenance specialisation services. The paper aims to discuss this issue.
Design/methodology/approach
This paper reports on the early stages of research which is developing a new information and communications technology (ICT)-based approach to managing contractor social networking on IBS infrastructure maintenance schemes. As a precursor to this work, the paper reviews current contractor social networking websites practices on IBS infrastructure maintenance projects and explores the ICT tools and techniques currently being employed on such projects.
Findings
The findings reveal the need for more sophisticated contractor social networking websites solutions which accord with the needs of IBS infrastructure maintenance schemes.
Originality/value
The paper concludes by presenting a research framework for developing such a system in the future.
Details
Keywords
Alberto Martinetti, Preshant Awadhpersad, Sarbjeet Singh and Leo A.M. van Dongen
The paper aims to convert into useable guidelines, the knowledge related to human factors and tasks' organisation, which are embedded in one of the most exciting maintenance…
Abstract
Purpose
The paper aims to convert into useable guidelines, the knowledge related to human factors and tasks' organisation, which are embedded in one of the most exciting maintenance actions that are carried out, the pitstop in Formula 1 races.
Design/methodology/approach
The paper opted for a fault tree analysis (FTA) to de-construct all the sub-tasks and their possible deviations from desirable situations and to evaluate the most relevant information needed for carrying out the pitstop operation. Besides, the SHELL model was applied in a second stage to evaluate the interaction between human being and human interfaces with other components of the system. Once this set of information was crystallised, the research translated it into useable guidelines for organising industrial maintenance actions using the same approach and possible reaching the same results.
Findings
The results of this study is a structured set of guidelines that encompasses the most paramount aspects that should be considered for setting correct maintenance actions. They represent a “guide” for including the different angles that are included during these operations.
Research limitations/implications
The guidelines are potentially applicable to every maintenance operation. The guidelines should be tested on different working domains to check their applicability besides the racing world.
Practical implications
This study is a reverse engineering work for creating a scheme to include into maintenance operations aspects such as crew athlete-like fitness, training, technology, organisational issues, safety, ergonomics and psychology.
Originality/value
The value of the paper is deconstructing the results of one of the most successful and prepared maintenance action. The paper takes a different approach in proposing how to structure and create maintenance solutions. The difference in approaches between the maintenance during the pitstop of Formula 1 car and industrial applications enhances the gap that needs still to be filled for further improving maintenance actions out of the racing world.
Details
Keywords
Mpho Trinity Manenzhe, Arnesh Telukdarie and Megashnee Munsamy
The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.
Abstract
Purpose
The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.
Design/methodology/approach
The extant literature in physical assets maintenance depicts that poor maintenance management is predominantly because of a lack of a clearly defined maintenance work management process model, resulting in poor management of maintenance work. This paper solves this complex phenomenon using a combination of conceptual process modeling and system dynamics simulation incorporating 4IR technologies. A process for maintenance work management and its control actions on scheduled maintenance tasks versus unscheduled maintenance tasks is modeled, replicating real-world scenarios with a digital lens (4IR technologies) for predictive maintenance strategy.
Findings
A process for maintenance work management is thus modeled and simulated as a dynamic system. Post-model validation, this study reveals that the real-world maintenance work management process can be replicated using system dynamics modeling. The impact analysis of 4IR technologies on maintenance work management systems reveals that the implementation of 4IR technologies intensifies asset performance with an overall gain of 27.46%, yielding the best maintenance index. This study further reveals that the benefits of 4IR technologies positively impact equipment defect predictability before failure, thereby yielding a predictive maintenance strategy.
Research limitations/implications
The study focused on maintenance work management system without the consideration of other subsystems such as cost of maintenance, production dynamics, and supply chain management.
Practical implications
The maintenance real-world quantitative data is retrieved from two maintenance departments from company A, for a period of 24 months, representing years 2017 and 2018. The maintenance quantitative data retrieved represent six various types of equipment used at underground Mines. The maintenance management qualitative data (Organizational documents) in maintenance management are retrieved from company A and company B. Company A is a global mining industry, and company B is a global manufacturing industry. The reliability of the data used in the model validation have practical implications on how maintenance work management system behaves with the benefit of 4IR technologies' implementation.
Social implications
This research study yields an overall benefit in asset management, thereby intensifying asset performance. The expected learnings are intended to benefit future research in the physical asset management field of study and most important to the industry practitioners in physical asset management.
Originality/value
This paper provides for a model in which maintenance work and its dynamics is systematically managed. Uncontrollable corrective maintenance work increases the complexity of the overall maintenance work management. The use of a system dynamic model and simulation incorporating 4IR technologies adds value on the maintenance work management effectiveness.
Details
Keywords
The purpose is to describe new business opportunities within the Swedish railway industry and to support the development of business models that corresponds with the needs and…
Abstract
Purpose
The purpose is to describe new business opportunities within the Swedish railway industry and to support the development of business models that corresponds with the needs and requirements of Industry 4.0, here denoted as Service Management 4.0.
Design/methodology/approach
The study is an in-depth and descriptive case study of the Swedish railway system with specific focus on a railway vehicle maintainer. Public reports, statistics, internal documents, interviews and dialogues forms the basis for the empirical findings.
Findings
The article describes the complex business environment of the deregulated Swedish railway industry. Main findings are in the form of identified business opportunities and new business model propositions for one of the key actors, a vehicle maintainer.
Originality/value
The article provides valuable understanding of business strategy development within complex business environments and how maintenance related business models could be developed for reaching Service Management 4.0.
Details
Keywords
Camilla Lundgren, Jon Bokrantz and Anders Skoogh
Technological advancements are reshaping the manufacturing industry toward digitalized manufacturing. Despite the importance of top-class maintenance in such systems, many…
Abstract
Purpose
Technological advancements are reshaping the manufacturing industry toward digitalized manufacturing. Despite the importance of top-class maintenance in such systems, many industrial companies lack a clear strategy for maintenance in digitalized manufacturing. The purpose of this paper is to facilitate the implementation of maintenance in digitalized manufacturing by proposing a strategy development process for the Smart Maintenance concept.
Design/methodology/approach
This study is designed as a multiple-case study, where the strategy development in three industrial cases is analyzed. Several methods were used to collect data on the case companies' development of smart maintenance strategies. The data were analyzed with an inductive approach.
Findings
A process of strategy development for smart maintenance is proposed, including six steps: benchmarking, setting clear goals, setting strategic priority, planning key activities, elevating implementation and follow-up.
Practical implications
The proposed process provides industry practitioners with a step-by-step guide for the development of a clear smart maintenance strategy, based on the current state of their maintenance organization. This creates employee engagement and is a new way of developing maintenance strategies.
Originality/value
Maintenance strategies are traditionally regarded as a selection of corrective/reactive and preventive maintenance actions using a top-down approach. By contrast, the proposed process is starting from the current state of the maintenance organization and allows a mixture of top-down and bottom-up approaches, supporting organizational development. This is a rare perspective of maintenance strategies and will make maintenance organizations ready for the demands of digitalized manufacturing.
Details