Search results

1 – 10 of over 1000
Article
Publication date: 23 January 2024

Chinedu Onyeme and Kapila Liyanage

This study investigates the integration of Industry 4.0 (I4.0) technologies with condition-based maintenance (CBM) in upstream oil and gas (O&G) operations, focussing on…

67

Abstract

Purpose

This study investigates the integration of Industry 4.0 (I4.0) technologies with condition-based maintenance (CBM) in upstream oil and gas (O&G) operations, focussing on developing countries like Nigeria. The research identifies barriers to this integration and suggests solutions, intending to provide practical insights for improving operational efficiency in the O&G sector.

Design/methodology/approach

The study commenced with an exhaustive review of extant literature to identify existing barriers to I4.0 implementation and contextualise the study. Subsequent to this foundational step, primary data are gathered through the administration of carefully constructed questionnaires targeted at professionals specialised in maintenance within the upstream O&G sector. A semi-structured interview was also conducted to elicit more nuanced, contextual insights from these professionals. Analytically, the collected data were subjected to descriptive statistical methods for summarisation and interpretation with a measurement model to define the relationships between observed variables and latent construct. Moreover, the Relative Importance Index was utilised to systematically prioritise and rank the key barriers to I4.0 integration to CBM within the upstream O&G upstream sector.

Findings

The most ranked obstacles in integrating I4.0 technologies to the CBM strategy in the O&G industry are lack of budget and finance, limited engineering and technological resources, lack of support from executives and leaders of the organisations and lack of competence. Even though the journey of digitalisation has commenced in the O&G industry, there are limited studies in this area.

Originality/value

The study serves as both an academic cornerstone and a practical guide for the operational integration of I4.0 technologies within Nigeria's O&G upstream sector. Specifically, it provides an exhaustive analysis of the obstacles impeding effective incorporation into CBM practices. Additionally, the study contributes actionable insights for industry stakeholders to enhance overall performance and achieve key performance indices (KPIs).

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 18 October 2023

Temidayo O. Osunsanmi, Chigozie Collins Okafor and Clinton Ohis Aigbavboa

The implementation of smart maintenance (SM) has greatly benefited facility managers, construction project managers and other stakeholders within the built environment…

Abstract

Purpose

The implementation of smart maintenance (SM) has greatly benefited facility managers, construction project managers and other stakeholders within the built environment. Unfortunately, its actualization for stakeholders in the built environment in the fourth industrial revolution (4IR) era remains a challenge. To reduce the challenge, this study aims at conducting a bibliometric analysis to unearth the critical success factors supporting SM implementation. The future direction and practice of SM in the construction industry were also explored.

Design/methodology/approach

A bibliometric approach was adopted for reviewing articles extracted from the Scopus database. Keywords such as (“smart maintenance“) OR (“intelligent maintenance”) OR (“technological maintenance”) OR (“automated maintenance”) OR (“computerized maintenance”) were used to extract articles from the Scopus database. The studies were restricted between 2006 and 2021 to capture the 4IR era. The initial extracted papers were 1,048; however, 288 papers were selected and analysed using VOSviewer software.

Findings

The findings revealed that the critical success factors supporting the implementation of SM in the 4IR era are collaboration, digital twin design, energy management system and decentralized data management system. Regarding the future practice of SM in the 4IR era, it was also revealed that SM is possible to evolve into maintenance 4.0. This will support the autonomous maintenance of infrastructures in the built environment.

Research limitations/implications

The use of a single database contributed to the limitation of the findings from this study.

Practical implications

Despite the limitations, the findings of this study contributed to practice and research by providing stakeholders in the built environment with the direction of SM practice.

Originality/value

Stakeholders in the built environment have clamoured to implement SM in the 4IR era. This study provided the critical success factors for adopting SM, guaranteeing the 4IR era. It also provides the research trends and direction of SM practice.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 28 March 2023

Huiying (Cynthia) Hou, Joseph H.K. Lai, Hao Wu and Tong Wang

This paper aims to investigate the theoretical and practical links between digital twin (DT) application in heritage facilities management (HFM) from a life cycle management…

Abstract

Purpose

This paper aims to investigate the theoretical and practical links between digital twin (DT) application in heritage facilities management (HFM) from a life cycle management perspective and to signpost the future development directions of DT in HFM.

Design/methodology/approach

This state-of-the-art review was conducted using a systematic literature review method. Inclusive and exclusive criteria were identified and used to retrieve relevant literature from renowned literature databases. Shortlisted publications were analysed using the VOSviewer software and then critically reviewed to reveal the status quo of research in the subject area.

Findings

The review results show that DT has been mainly adopted to support decision-making on conservation approach and method selection, performance monitoring and prediction, maintenance strategies design and development, and energy evaluation and management. Although many researchers attempted to develop DT models for part of a heritage building at component or system level and test the models using real-life cases, their works were constrained by availability of empirical data. Furthermore, data capture approaches, data acquisition methods and modelling with multi-source data are found to be the existing challenges of DT application in HFM.

Originality/value

In a broader sense, this study contributes to the field of engineering, construction and architectural management by providing an overview of how DT has been applied to support management activities throughout the building life cycle. For the HFM practice, a DT-cum-heritage building information modelling (HBIM) framework was developed to illustrate how DT can be integrated with HBIM to facilitate future DT application in HFM. The overall implication of this study is that it reveals the potential of heritage DT in facilitating HFM in the urban development context.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 October 2022

Ahmed Gouda Mohamed and Amr Mousa

Current research efforts exhibit a surge imperative for a building information modelling (BIM) approach that embodies a repository of all relevant data of existing building…

Abstract

Purpose

Current research efforts exhibit a surge imperative for a building information modelling (BIM) approach that embodies a repository of all relevant data of existing building components while monitoring and consistently recording numerous components’ functions throughout its lifecycle, especially in Egypt. This research paper aims to develop an integrated as-is BIM-facility management (FM) information model for the existing building’s components via a case study, depicting a repository for historical data and knowledge amassed from inspections and conveying maintenance decisions automatically during the FM practices.

Design/methodology/approach

The developed approach pursues four successive steps: data acquisition and processing of building components; components recognition from point clouds; modelling scanned point clouds; and quick response code information transfer to BIM components.

Findings

The proposed approach incorporates the as-is BIM with the building components’ as-is FM information to portray a repository for historical data and knowledge collected from inspections to proactively benefit facility managers in simplifying, expediting and enhancing maintenance decisions automatically during FM practices.

Originality/value

This paper presents a digital alternative to manual maintenance recordkeeping concerning building components to retrieve their as-is and historical data using a case study in Egypt. This paper proposes a broad scan to as-is information BIM approach for the existing building’s components to condone maintenance interventions using a versatile, affordable, readily available and multi-functional method for scanning the building’s components using a handheld tool.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 1 April 2024

Frank Ato Ghansah

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the…

Abstract

Purpose

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the high complexity of accurately representing and modelling the physics behind the DTs process. This study thus organises and consolidates the fragmented literature on DTs implementation for smart buildings at the facility management stage by exploring the enablers, applications and challenges and examining the interrelationships amongst them.

Design/methodology/approach

A systematic literature review approach is adopted to analyse and synthesise the existing literature relating to the subject topic.

Findings

The study revealed six main categories of enablers of DTs for smart building at the facility management stage, namely perception technologies, network technologies, storage technologies, application technologies, knowledge-building and design processes. Three substantial categories of DTs application for smart buildings were revealed at the facility management stage: efficient operation and service monitoring, efficient building energy management and effective smart building maintenance. Subsequently, the top four major challenges were identified as being “lack of a systematic and comprehensive reference model”, “real-time data integration”, “the complexity and uncertainty nature of real-time data” and “real-time data visualisation”. An integrative framework is finally proposed by examining the interactive relationship amongst the enablers, the applications and the challenges.

Practical implications

The findings could guide facility managers/engineers to fairly understand the enablers, applications and challenges when DTs are being implemented to improve smart building performance and achieve user satisfaction at the facility management stage.

Originality/value

This study contributes to the knowledge body on DTs by extending the scope of the existing studies to identify the enablers and applications of DTs for smart buildings at the facility management stage and the specific challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 16 April 2024

Shuyuan Xu, Jun Wang, Xiangyu Wang, Wenchi Shou and Tuan Ngo

This paper covers the development of a novel defect model for concrete highway bridges. The proposed defect model is intended to facilitate the identification of bridge’s…

Abstract

Purpose

This paper covers the development of a novel defect model for concrete highway bridges. The proposed defect model is intended to facilitate the identification of bridge’s condition information (i.e. defects), improve the efficiency and accuracy of bridge inspections by supporting practitioners and even machines with digitalised expert knowledge, and ultimately automate the process.

Design/methodology/approach

The research design consists of three major phases so as to (1) categorise common defect with regard to physical entities (i.e. bridge element), (2) establish internal relationships among those defects and (3) relate defects to their properties and potential causes. A mixed-method research approach, which includes a comprehensive literature review, focus groups and case studies, was employed to develop and validate the proposed defect model.

Findings

The data collected through the literature and focus groups were analysed and knowledge were extracted to form the novel defect model. The defect model was then validated and further calibrated through case study. Inspection reports of nearly 300 bridges in China were collected and analysed. The study uncovered the relationships between defects and a variety of inspection-related elements and represented in the form of an accessible, digitalised and user-friendly knowledge model.

Originality/value

The contribution of this paper is the development of a defect model that can assist inexperienced practitioners and even machines in the near future to conduct inspection tasks. For one, the proposed defect model can standardise the data collection process of bridge inspection, including the identification of defects and documentation of their vital properties, paving the path for the automation in subsequent stages (e.g. condition evaluation). For another, by retrieving rich experience and expert knowledge which have long been reserved and inherited in the industrial sector, the inspection efficiency and accuracy can be considerably improved.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 March 2022

Adekunle Sabitu Oyegoke, Saheed Ajayi, Muhammad Azeem Abbas and Stephen Ogunlana

The problem of long delay and waiting time in Disabled Facilities Grants (DFG) housing adaptation has been ongoing for years. This study aimed at constructing an innovative smart…

166

Abstract

Purpose

The problem of long delay and waiting time in Disabled Facilities Grants (DFG) housing adaptation has been ongoing for years. This study aimed at constructing an innovative smart solution to streamline the housing adaptation process to prevent lengthy delays for disabled and elderly people.

Design/methodology/approach

The Adapt-ABLE approach is suggested based on a constructive research approach, where extensive theoretical development of the Adapt-ABLE concept is developed. It consists of four integrated platforms that undergo theoretical and analogical development and validations through applicable theories, a workshop, four brainstorming sessions and a focus group.

Findings

The proposed Adapt-ABLE approach utilises process optimisation techniques through an IT system for streamlining the process. The merits of the semi-automated system include the development of a preventive measure that allows measurement of suitability index of homes for the occupants, indicative assessment that shorten the application duration, procurement and contracting platform that utilises principles based on framework agreement and call-off contract, and a platform that standardised performance management for continuous improvement.

Originality/value

The Adapt-ABLE solution will cut the application journey of non-qualified applicants and suggest where help can be sought. The qualified applicants' application journey will also be shortened through an online indicative assessment regime and early online resources (means) testing. Overall, the proposed system reduces the waiting time, and timely delivery improves the applicant's quality of life by living independently. It will potentially save the NHS billions of pounds used to replace hips and residential care costs due to lengthy delays in the housing adaptations process.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 14 December 2023

Michele Oppioli, Maria José Sousa, Miguel Sousa and Elbano de Nuccio

The topic of artificial intelligence (AI) has been expanding rapidly in recent years, gaining the attention of academics and practitioners. This study provides a structured…

Abstract

Purpose

The topic of artificial intelligence (AI) has been expanding rapidly in recent years, gaining the attention of academics and practitioners. This study provides a structured literature review (SLR) on AI and management decisions (MDs) by analysing the scientific output and defining new research topics.

Design/methodology/approach

The study uses a rigorous methodological approach to summarise the state of the art of the past literature. The authors used Scopus as the database for data collection and utilised the Bibliometrix R package. In total, 204 peer-reviewed English articles were collected and analysed.

Findings

The results showed that literature in this field is emerging. Studies are focused on using AI as forecasting and classification for management decision-making, AI as a tool to improve knowledge management in organisations and extract information. The cluster analysis revealed the presence of five thematic clusters of studies on the topic.

Originality/value

The study’s originality lies in providing a new perspective on AI for MDs. In particular, the analysis reveals a new classification of research streams and provides fruitful research questions to continue research on the topic.

Details

Management Decision, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0025-1747

Keywords

Article
Publication date: 12 December 2023

Muzamil Ahmad Rafiqii, M.A. Lone and M.A. Tantray

This study aims to provide a review for scour in complex rivers and streams with coarser bed material, steep longitudinal bed slopes and dynamic environments, in the interest of…

Abstract

Purpose

This study aims to provide a review for scour in complex rivers and streams with coarser bed material, steep longitudinal bed slopes and dynamic environments, in the interest of the safety and the economy of hydraulic structures. The knowledge of scour in such geographical complexities is very crucial for a comprehensive understanding of scour failures and for establishing definitive criteria to bridge this major research gap.

Design/methodology/approach

The existing available literature shows significant work done in case of silt, sand and small sized coarser bed material but any substantial work for bed material of gravel size or above is lacking, resulting in a wide gap. Though some researchers have attempted to explore possibilities of refining the existing models by adding pier size, shape, sediment non-uniformity and armouring effects, which otherwise have been given a miss by the various researchers, including the pioneer in the field Lacey–Inglis (1930). But still, a rational model for scour estimation in such complex conditions for global use is yet to come. This is because all the parameters governing the scour have not been studied properly till date as is evident from the globally available literature and is witnessed in the field too, in recurrent failure of hydraulic structures especially bridges.

Findings

The researchers presume that the finer materials move only as a result of erosion. However, in actual field conditions, it has been observed that the large-sized stones also roll down and cause huge erosion along the river bed and damage the hydraulic structures, especially in the steep river/stream beds along hilly slopes. This fact has been overlooked in the models available globally and has been highlighted only in the current work in an attempt to recognize this major research gap. A study carried out on a number of streams globally and in Jammu and Kashmir, India also, has shown that in steep river and stream beds with bed material consisting of gravel size or greater than gravel, large scour holes ranging from 1 m to 5 m were created by furious floods, and due to other unknown forces along the channel path and near foundations of hydraulic structures.

Originality/value

To the best of the authors’ knowledge, this work is purely original.

Details

World Journal of Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1708-5284

Keywords

Article
Publication date: 19 December 2023

Zul-Atfi Ismail

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of…

Abstract

Purpose

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of statement), environmental, economic (campus development) and social (health and wellbeing). Because these standards have proven to be challenging to integrate, local governments are increasingly experimenting with social innovation (SI) as a bottom-up form of standard integration. This study aims to apply the concept of SI to the O&M processes of facilities management at polytechnics in Malaysia to identify problems with conventional working practices in this area and to recommend potential solutions.

Design/methodology/approach

The paper reviews evidence that conventional working methods generate significant problems related to paper-based forms, improper database management and flawed decision-making processes. Because of the lack knowledge about different ways of how standard integration is achieved, the comparison of three polytechnic institutions which are Rensselaer Polytechnic Institute (RPI) and Southern Polytechnic College of Engineering and Engineering Technology (SPCEET) in USA as well as Seberang Perai Polytechnic, Pulau Pinang (PSP) in Malaysia shares the ambition to realise standard integration of O&M through SI.

Findings

The findings reveal that SI leads to four ways of standard integration: computerised maintenance management system, online customer complaint, electronic form and relational database. Application of the concept of SI reveals the need for more sophisticated management solutions in the O&M processes of facilities management.

Originality/value

These standard integration arrangements unfortunately seem to mainly contribute to greater alignment between standard rather than true standard integration. The concept of SI will guide future improvements and developments in maintenance management systems to fulfil requirements in this area.

Details

Journal of Global Responsibility, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2041-2568

Keywords

1 – 10 of over 1000