Mostafa Abd-El-Barr, Kalim Qureshi and Bambang Sarif

Ant Colony Optimization and Particle Swarm Optimization represent two widely used Swarm Intelligence (SI) optimization techniques. Information processing using Multiple-Valued…

Abstract

Ant Colony Optimization and Particle Swarm Optimization represent two widely used Swarm Intelligence (SI) optimization techniques. Information processing using Multiple-Valued Logic (MVL) is carried out using more than two discrete logic levels. In this paper, we compare two the SI-based algorithms in synthesizing MVL functions. A benchmark consisting of 50,000 randomly generated 2-variable 4-valued functions is used for assessing the performance of the algorithms using the benchmark. Simulation results show that the PSO outperforms the ACO technique in terms of the average number of product terms (PTs) needed. We also compare the results obtained using both ACO-MVL and PSO-MVL with those obtained using Espresso-MV logic minimizer. It is shown that on average, both of the SI-based techniques produced better results compared to those produced by Espresso-MV. We show that the SI-based techniques outperform the conventional direct-cover (DC) techniques in terms of the average number of product terms required.

Article
Publication date: 31 March 2023

Zul-Atfi Ismail

Green building (GB) maintenance is increasingly accepted in the construction industry, so it can now be interpreted as an industry best practice for maintenance planning. However…

Abstract

Purpose

Green building (GB) maintenance is increasingly accepted in the construction industry, so it can now be interpreted as an industry best practice for maintenance planning. However, the performance competency and design knowledge of the practice's building control instrument process can be affected by its evaluation and the information management of building information modelling (BIM)–based model checking (BMC). These maintenance-planning problems have not yet been investigated in instances such as the Grenfell Tower fire (14 June 2017, approximately 80 fatalities) in North Kensington, West London.

Design/methodology/approach

This study proposes a theoretical framework for analysing the existing conceptualisation of BIM tools and techniques based on a critical review of GB maintenance environments. These are currently employed on GB maintenance ecosystems embedded in project teams that can affect BMC practices in the automation system process. In order to better understand how BMC is implemented in GB ecosystem projects, a quantitative case study is conducted in the Malaysian public works department (Jabatan Kerja Raya (JKR)).

Findings

GB ecosystem projects were not as effective as planned due to safety awareness, design planning, inadequate track insulation, environmental (in) compatibility and inadequate building access management. Descriptive statistics and an ANOVA were applied to analyse the data. The study is reinforced by a process flow, which is transformed into a theoretical framework.

Originality/value

Industry practitioners can use the developed framework to diagnose BMC application issues and leverage the staff competency inherent in an ecosystem to plan GB maintenance environments successfully.

Details

Journal of Enterprise Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 2 March 2022

Zul-Atfi Bin Ismail

This paper aims to identify the different system approach using building information modelling (BIM) technology that is equipped with automated evaluation processes. BIM research…

Abstract

Purpose

This paper aims to identify the different system approach using building information modelling (BIM) technology that is equipped with automated evaluation processes. BIM research has mainly focused on theoretical models of acceptance in the green building (GB) maintenance industry. However, BIM has the potential to the competency’s performance and design knowledge of building control instrument. Realising this potential requires a study of BIM at the maintenance planning level, which is considered to be BIM-based model checking (BMC). BMC and its effect in the maintenance planning have not been sufficiently investigated.

Design/methodology/approach

The aim of this paper is to present a critical review of literature on the theoretical background of BMC practices and the main features of information and communication technology tools and techniques in the GB maintenance projects.

Findings

A theoretical framework of BMC is developed and presented. The proposed model incorporates requirement for maintaining a competency’s performance on maintenance planning schemes of GB projects and the importance of early integration of BMC in the design phase to identify alternative methods to cogenerate, monitor and optimise BMC.

Originality/value

It is found that variables facilitating BMC are integrated at different GB maintenance environments levels and are shaped by the context. Directions for future research are presented.