Search results

1 – 10 of over 3000
Open Access
Article
Publication date: 9 November 2018

Viviane Souza Vilela Junqueira, Marcelo Seido Nagano and Hugo Hissashi Miyata

This paper aims to exemplify the use of project management tools in the scheduling of aircraft maintenance activities. This process is known as maintenance, repair and overhaul…

6624

Abstract

Purpose

This paper aims to exemplify the use of project management tools in the scheduling of aircraft maintenance activities. This process is known as maintenance, repair and overhaul and it has gained importance within the aeronautical sector due to its expected growth in the coming years; however, it also faces increasing competitiveness in its market. This fact gives rise to the need of acting in maintenance management and seeking lower costs while maintaining the quality of the service provided. The purpose of this paper is to propose the structuring of a procedure that aims to reduce the total maintenance time (downtime) and guarantee the delivery of the aircraft on time.

Design/methodology/approach

The paper, through a case study at a Brazilian aircraft maintenance center, used critical path method and critical chain project management, the latter being derived from the theory of constraints, with the purpose of analyzing resources systematically and synchronizing the activities in the precedence network.

Findings

As a result, it is shown that downtime can be reduced from 11 to 5 days and improvements are proposed to achieve greater market competitiveness.

Originality/value

This paper demonstrates the competitive advantage that resulted from the application of project management tools in the aircraft maintenance planning and execution.

Details

Revista de GestĂŁo, vol. 27 no. 1
Type: Research Article
ISSN: 2177-8736

Keywords

Content available
Article
Publication date: 20 January 2012

M. Fitzgerald

857

Abstract

Details

Human Resource Management International Digest, vol. 20 no. 1
Type: Research Article
ISSN: 0967-0734

Keywords

Content available
Article
Publication date: 21 March 2008

100

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 80 no. 2
Type: Research Article
ISSN: 0002-2667

Content available
Article
Publication date: 6 January 2012

Geary Soska

438

Abstract

Details

Industrial Robot: An International Journal, vol. 39 no. 1
Type: Research Article
ISSN: 0143-991X

Content available
382

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 71 no. 4
Type: Research Article
ISSN: 0002-2667

Keywords

Open Access
Article
Publication date: 11 May 2017

Rizwana Shaheen Hussain, Kirti Ruikar, Marcus P. Enoch, Nigel Brien and David Gartside

Diminishing local government budgets and the need to reduce highway works activities necessitate cost effective and efficient processes. The purpose of this paper is to…

6370

Abstract

Purpose

Diminishing local government budgets and the need to reduce highway works activities necessitate cost effective and efficient processes. The purpose of this paper is to investigate streamlining road works administrative processes to enhance coordinated working at Derby City Council.

Design/methodology/approach

Case study research of a local authority was undertaken using business process mapping. Specifically, Swimlane analysis enabled re-engineering of business processes from design stage, to works permit issuance. Process improvement recommendations were validated by nine industry experts through a focus group and semi-structured interviews. A logic map was developed for transferability to other councils, identifying key attributes for a successful administrative road works management process.

Findings

Research revealed inherent silo working and processes built around fragmented IT systems creating process inefficiency. Validation found numerous practices and management styles were culturally embedded and common across councils. Peer reviewed recommendations are made to improve working practices, including improving IT systems, removing process bottlenecks, and training staff.

Research limitations/implications

Whilst road works management policy is generally under-researched, its strategic and negative impacts are widely acknowledged. This study highlights the day-to-day operational problems which are interconnected to the strategic impact, bridging an important gap in knowledge, as well as adding to business process re-engineering literature.

Originality/value

The research adds to a limited body of road works management policy research, and also presents a high-level logic map for councils to adopt as appropriate.

Details

Built Environment Project and Asset Management, vol. 7 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 21 June 2022

Babatunde Fatai Ogunbayo, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Opeoluwa Israel Akinradewo and David Edwards

Maintenance policy is an element of building maintenance management that deals with organisation policy, planning and procedures, and delineates how maintenance units in an…

1171

Abstract

Purpose

Maintenance policy is an element of building maintenance management that deals with organisation policy, planning and procedures, and delineates how maintenance units in an organisation will manage specific building components, auxiliary facilities and services. Given this contextual setting, this study investigates whether organisational maintenance policies (OMPs) utilised in developed countries are relevant in developing countries – using Nigeria as a case study exemplar.

Design/methodology/approach

An empirical research design (using deductive reasoning) was implemented for this research. Specifically, a Delphi study conducted revealed 23 elements that impact OMP development in Nigeria.

Findings

Of these twenty elements, six had a very high impact on maintenance management (VHI: 9.00–10.00), nine variables had a high impact (HI: 7.00–8.99) and eight other variables scored a medium impact (MI: 5.00–6.99). Emergent findings reveal that the elements of organisational maintenance policy that engender effective building maintenance management include preparation of safety procedure, optimisation of the maintenance policy, optimisation of the maintenance action plan, well-defined priority system, risk factor establishment, suitable maintenance procedures and a clearly delineated process.

Practical implications

The study findings will guide policymakers in identifying the main elements required in maintenance policies development towards making national public asset preservation and economic gains. Also, the content of the future educational curriculum on maintenance management study will be more receptive to the body of knowledge and the built environment industry.

Originality/value

Cumulatively, the research presented illustrates that these elements replicate those adopted in other countries and that effective maintenance management of public buildings is assured when these elements are integral to the development of an OMP.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 8 December 2021

Paola Ramassa and Giulia Leoni

This paper explores how the International Accounting Standards Board (IASB) has dealt with the emerging issue of accounting for cryptocurrencies by investigating its constituents'…

7453

Abstract

Purpose

This paper explores how the International Accounting Standards Board (IASB) has dealt with the emerging issue of accounting for cryptocurrencies by investigating its constituents' expectations and the motivations underlying its regulatory response.

Design/methodology/approach

The theoretical lens of regulatory space is used to analyse the four-year debate around cryptocurrency holdings and informs the extensive thematic analysis of public documents, meetings recordings and comment letters on the topic.

Findings

Facing national standard setters' initiatives to regulate accounting for cryptocurrency, the IASB defended its position in the regulatory space through an agenda decision based on ewct 2xisting standards, which was finalised by the International Financial Reporting Standards Interpretation Committee (IFRS IC) despite criticism from constituents and Board members.

Research limitations/implications

The paper provides insights into the IASB approach to a regulatory vacuum regarding a new class of items, which derive from a new and rapidly-evolving technology. Disruptive technology impacts the contested arena of accounting regulation, in which the constituents ask for new solutions and the IASB tries to resist such pressures, while defending its position.

Practical implications

The paper sheds light on the growing importance of agenda decisions in the IFRS environment and on the limits of the IASB long regulatory process in the circumstance of emerging accounting issues deriving from rapidly-evolving technology.

Originality/value

This investigation is timely and relevant as it considers the regulatory issues arising from disruptive technological innovations (i.e. cryptocurrency), shedding light on the limits of regulatory processes in times of technological change.

Details

Accounting, Auditing & Accountability Journal, vol. 35 no. 7
Type: Research Article
ISSN: 0951-3574

Keywords

Content available
Article
Publication date: 23 March 2010

96

Abstract

Details

Pigment & Resin Technology, vol. 39 no. 2
Type: Research Article
ISSN: 0369-9420

1 – 10 of over 3000