Search results

1 – 10 of 45
Open Access
Book part
Publication date: 1 May 2019

Per Fridtjof Larssen, Atle Engebø, Ola Lædre and Ole Jonny Klakegg

This paper aims to examine how a partnering contract facilitates project values and the culture in a construction project and the consequences of said facilitation. Hence, it…

Abstract

Purpose

This paper aims to examine how a partnering contract facilitates project values and the culture in a construction project and the consequences of said facilitation. Hence, it answers the following research questions: 1) How does the contractual framework in Bispevika facilitate relational culture? 2) What effects of this facilitation can be identified in the early phase of development?

Design/Methodology/Approach

An explorative approach is taken into a single case. A literature study into the topics of relational contracting and culture provides a backdrop for the study. The empirical work consists of a study of the construction contracts and six in-depth interviews with actors from the supply-chain.

Findings

Contractual elements affect the project organizations’ motivation. On the basis of existing literature, five contractual elements are identified explicitly in the contracts: “shared goals”, “incentives and bonus”, “open book”, “colocation”, and “design-build”.

Research Limitations/Implications

The data collection is restricted to a single point in time in a single project. Further research is necessary both at a later stage in the same case and in similar projects.

Practical Implications

The paper identifies the effects that proper use of contractual elements has on the relational culture in a construction project and is, therefore, important for subsequent research within the area.

Originality/Value

In addition to identifying the existing contractual elements, the interviews also revealed two additional practices that might be useful for subsequent research: “involvement of executive management” and “subsequent contracts dependent on previous project performance”.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Book part
Publication date: 1 May 2019

Johan Nyström

Provide explanations to why firms subcontract.

Abstract

Purpose

Provide explanations to why firms subcontract.

Design/Methodology/Approach

Theoretical analysis based on current and specific conditions of the construction sector and empirical indicators.

Findings

Attributes potentially influencing the subcontracting decision are updated.

Research Limitations/Implications

The paper will only focus on the make-or-buy decision of the main contractor and not the client.

Practical Implications

Contributing to coming analysis on the subcontractor decision.

Originality/Value

Updated transaction cost analysis on the construction industry.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 2 August 2022

Sina Moradi and Kalle Kähkönen

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have…

1937

Abstract

Purpose

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have addressed success factors of various collaborative delivery models (e.g. alliance and partnering). However, there is currently very limited research-based knowledge concerning core success factors for different collaborative delivery models, exploring the commonalities. Thus, this study aims to conceptualize a success model for collaborative construction projects by identifying and structuring their core success factors through the lens of project delivery elements.

Design/methodology/approach

A systematic literature review was conducted, and thematic as well as content analysis of the relevant studies led to the identification of mentioned success factors in the literature for different collaborative delivery models. Then, those common success factors were structured in a model based on factors' relation to project delivery elements.

Findings

The obtained results present eight core success factors (e.g. equality, mutual trust and commitment to win–win philosophy) for collaborative construction projects, structured in a model based on their contribution toward project organization, contractual relationships, and operational system in construction project delivery. Moreover, the differences between success factors for traditional and collaborative construction projects are discussed.

Originality/value

This study's findings provide insightful theoretical contributions on collaborative construction project success and providing a departure point for future studies based on the discussed differences between success factors of collaborative and traditional construction projects. The findings can be also practically insightful for the project professionals in collaborative construction projects to succeed in managing project organization, contractual relationships, and operational system.

Details

Built Environment Project and Asset Management, vol. 12 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 25 October 2021

Yaser Gamil and Ismail Abd Rahman

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in…

13754

Abstract

Purpose

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.

Design/methodology/approach

The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.

Findings

The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.

Originality/value

The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.

Details

Journal of Facilities Management , vol. 21 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 31 May 2022

Laura Saukko, Kirsi Aaltonen and Harri Haapasalo

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

2058

Abstract

Purpose

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

Design/methodology/approach

A theoretical construct of, referred in this study as integration capability framework is elaborated following a systematic literature review. Thereafter, an integration capability self-assessment model, based on maturity thinking, is derived from the theoretical framework. The self-assessment model is further developed and tested for validity within five inter-organizational project networks in cooperation with industry practitioners, representing construction, industrial engineering, and mining sectors.

Findings

The results show that inter-organizational projects can use the developed model in self-assessing the maturity levels of various integration mechanisms, thus the state of integration capability at any point in time during inter-organizational projects.

Originality/value

This study is an attempt to identify how the integration capability dimensions can be self-assessed in inter-organizational projects, through the maturity levels of various integration mechanisms. The results offer insights for both academics and project management practitioners.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 14 March 2023

Rianne Warsen

The purpose of this paper is to conduct a systematic literature review of studies addressing relational quality in public–private partnerships (PPPs). The ambition of this study…

Abstract

Purpose

The purpose of this paper is to conduct a systematic literature review of studies addressing relational quality in public–private partnerships (PPPs). The ambition of this study is twofold: first, to present more clarity regarding the definition of the concept. Second, to develop a framework that explains the antecedents, characteristics and outcomes of relational quality in PPPs.

Design/methodology/approach

A systematic literature review of 99 academic articles, which were analyzed and coded on the definition, characteristics, antecedents and outcomes of relational quality.

Findings

The study shows that trust, communication, commitment, openness and reciprocity are considered core aspects of the concept. The analysis further identifies important antecedents (e.g. shared values, leadership) and outcomes (performance, innovation) of relational quality in PPPs. The findings result in the development of a framework on relational quality in PPPs to be used for further research.

Research limitations/implications

The findings indicate that relational quality is valuable for the functioning of PPPs, but the current focus of this review excludes studies addressing relational quality in other types of collaboration and public–private exchange. The lessons from these research fields might further improve people’s understanding of relational quality.

Practical implications

Practitioners should pay attention to relational quality in long-term PPPs. Among others, (process) management activities might contribute to relational quality as it stimulates communication and openness.

Originality/value

The presented framework explaining antecedents, characteristics and outcomes of relational quality allows for more structured use of this concept in future research.

Details

International Journal of Public Sector Management, vol. 36 no. 2
Type: Research Article
ISSN: 0951-3558

Keywords

Open Access
Article
Publication date: 7 August 2017

Per Erik Eriksson

The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.

12302

Abstract

Purpose

The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.

Design/methodology/approach

This paper is based on a literature review of organizational research and construction management literature together with a brief interview study of Swedish clients and contractors.

Findings

The theoretical and empirical findings propose that small and simple projects with low uncertainty and scarce resources may focus on exploitation to enhance short-term efficiency through traditional procurement strategies including delivery systems that separate the actors and their activities (i.e. pure design-build- or design-bid-build-contracts), fixed price payment and price focus in bid evaluation. Large complex projects with high uncertainty and customization benefit from combining exploration and exploitation to enhance sustainable performance. This requires collaborative procurement strategies including joint specification through early contractor involvement, cost reimbursement coupled with incentive-based payment, bid evaluation based on multiple criteria and collaborative tools and activities in partnering arrangements.

Research limitations/implications

This paper contributes to organizational learning literature by pinpointing the need for integrating procurement strategies that enhance combination of exploration and exploitation. The main contribution to the construction management literature involves the investigation of how procurement strategies may affect exploration and exploitation, as identified and articulated in the propositions developed in this paper.

Practical implications

From a practical perspective, the findings highlight the importance of tailoring procurement strategies to project characteristics to enhance a suitable balance between exploration and exploitation in construction projects.

Originality/value

The explicit focus on the operational project-level is uncommon but relevant in organizational learning literature.

Details

Journal of Financial Management of Property and Construction, vol. 22 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 12 May 2022

Kari-Pekka Tampio, Harri Haapasalo and Farooq Ali

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the…

8804

Abstract

Purpose

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the authors aim to identify the implications that stakeholder management has on value creation in a hospital project.

Design/methodology/approach

The research method is qualitative. Empirical data were collected in three cycles: project internal documentation, thematic interviews and survey. The literature related to hospital projects, stakeholder analysis and management, stakeholder salience and landscape is summarised, informing the qualitative design of the study.

Findings

The authors noted the importance of project-specific stakeholder identification, salience analysis and landscape description. The regulatory, formal and contractual stakeholders give an over-simplistic picture on stakeholder map. The operative stakeholder map and landscape describe the complexity, uncertainty, dynamism and institutional context inducing the challenges for the stakeholder management. There is an evident potential of utilising the stakeholder landscape and its elements in the resulting collaborative value creation in hospital projects. Multiple and changing stakeholders with differing expectations are an important opportunity to improve the value creation process.

Originality/value

Stakeholder management has recently attracted much attention in the industrial project setting. This research attempts to identify the operative stakeholder landscape in a large hospital project, not to mention its impact on value creation. This study offers a framework that can help academics and project management practitioners tackle the challenges amongst project stakeholders.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 26 July 2019

Simon van Zoest, Leentje Volker and Marleen Hermans

The purpose of this paper is to address the barriers that Dutch housing associations encounter in implementing new procurement strategies.

5401

Abstract

Purpose

The purpose of this paper is to address the barriers that Dutch housing associations encounter in implementing new procurement strategies.

Design/methodology/approach

Several aspects of purchasing, portfolio management, project delivery and supply management are discussed in relation to the changing role of housing associations as semi-public commissioning bodies in the Dutch construction industry, based on data derived from workshops with six Dutch housing associations.

Findings

Housing associations are adapting their procurement strategy towards a more integrative and performance-based approach to supply management. Due to the complexity of implementing this process, housing associations struggle especially with moving beyond pilot projects, increasing the maturity levels throughout the organisation and aligning new policies with daily practices at a tactical and an operational level.

Practical implications

Increased knowledge of change processes and seeing the potential of maturity models will be valuable for practitioners who are dealing with changes on the work floor.

Social implications

Client organisations are considered one of the key drivers of change in the construction industry. Insights into these particular organisational change processes contribute to the potential of industry reform.

Originality/value

Most studies on collaboration and integration in the supply chain focus on the inter-organisational level or on the supply side, rather than the internal organisation of the client.

Details

International Journal of Managing Projects in Business, vol. 13 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 16 November 2015

Pablo Ballesteros-Pérez, Maria Luisa del Campo-Hitschfeld, Manuel Alejandro González-Naranjo and Mari Carmen González-Cruz

Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The…

10092

Abstract

Purpose

Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze the influence of climate on standard construction work activities through a case study.

Design/methodology/approach

By studying the extent at which some weather variables impede outdoor work from being effectively executed, new maps and tables for planning for delays are presented. In addition, a real case regarding the construction of several bridges in southern Chile is analyzed.

Findings

Few studies have thoroughly addressed the influences of major climatic agents on the most common outdoor construction activities. The method detailed here provides a first approximation for construction planners to assess to what extent construction productivity will be influenced by the climate.

Research limitations/implications

Although this study was performed in Chile, the simplified method proposed is entirely transferable to any other country, however, other weather or combinations of weather variables could be needed in other environments or countries.

Practical implications

The implications will help reducing the negative social, economic and environmental outcomes that usually emerge from project delays.

Originality/value

Climatic data were processed using extremely simple calculations to create a series of quantitative maps and tables that would be useful for any construction planner to decide the best moment of the year to start a project and, if possible, where to build it.

Details

Engineering, Construction and Architectural Management, vol. 22 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 45