Search results

1 – 10 of 447
Article
Publication date: 20 January 2022

Pragyan Paramita Das, Vishwas Nandkishor Khatri, Rahul Doley, Rakesh Kumar Dutta and Jitendra Singh Yadav

This paper aims to estimate the bearing capacity of a surface strip and circular footings lying on layered sand using numerical limit analysis.

Abstract

Purpose

This paper aims to estimate the bearing capacity of a surface strip and circular footings lying on layered sand using numerical limit analysis.

Design/methodology/approach

Lower and upper bound limit analysis, as well as finite elements and second-order conic programming (SOCP), are used in this analysis. The yield criterion of Mohr-Coulomb is used to model soil behavior. Using this technique, stringent lower and upper bounds on ultimate bearing capacity can be achieved by assuming an associated flow law.

Findings

The obtained results indicate that the exact collapse load is typically being bracketed to within 6% about a mean of both the bounds. The obtained results are compared with the existing literature wherever applicable.

Originality/value

To the best of the authors’ knowledge, no study has used lower and upper bound limit analysis, as well as finite elements and SOCP, to estimate the bearing capacity of a surface strip and circular footings lying on layered sand.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 9 January 2024

Muneeb Afzal, Johnny Kwok Wai Wong and Alireza Ahmadian Fard Fini

Request for information (RFI) documents play a pivotal role in seeking clarifications in construction projects. However, perceived as inevitable “non-value adding” tasks, they…

Abstract

Purpose

Request for information (RFI) documents play a pivotal role in seeking clarifications in construction projects. However, perceived as inevitable “non-value adding” tasks, they harbour risks like schedule delays and increased project costs, underlining the importance of strategic RFI management in construction projects. Despite this, a lack of literature dissecting RFI processes impedes a full understanding of their intricacies and impacts. This study aims to bridge the gap through a comprehensive literature review, delving into RFI intricacies and implications, while emphasising the necessity for strategic RFI management to prevent project risks.

Design/methodology/approach

This research study systematically reviews RFI-related papers published between 2000 and 2023. Accordingly, the review discusses key themes related to RFI management, yielding best practices for industry stakeholders and highlighting research directions and gaps in the body of knowledge.

Findings

Present RFI management platforms exhibit deficiencies and lack analytics essential for streamlined RFI processing. Complications arise in building information modelling (BIM)-enabled projects due to software disparities and interoperability hurdles. The existing body of knowledge heavily relies on manual content analysis, an impractical approach for the construction industry. The proposed research direction involves automated comprehension of unstructured RFI content using advanced text mining and natural language processing techniques, with the potential to greatly elevate the efficiency of RFI processing.

Originality/value

The study extends the RFI literature by providing novel insights into the problemetisation with the RFI process, offering a holistic understanding and best practices to minimise adverse effects. Additionally, the paper synthesises RFI processes in traditional and BIM-enabled project settings, maps a causal-loop diagram to identify associated issues and summarises approaches for extracting knowledge from the unstructured content of RFIs. The outcomes of this review stand to offer invaluable insights to both industry practitioners and researchers, enabling and promoting the refinement of RFI processes within the construction domain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 July 2023

Prachi Vinod Ingle, Mahesh Gangadhar and M.D. Deepak

In recent times, there has been a lot of research focused on performance measurement (PM) in project-based sectors. However, there are very few studies that were reported on the…

Abstract

Purpose

In recent times, there has been a lot of research focused on performance measurement (PM) in project-based sectors. However, there are very few studies that were reported on the significance of PM in the construction sector. Keeping track of an organization in achieving organizations goals and objectives seems an important way. One of the major challenges faced by the industry is unavailable of an appropriate PM system for assessing organizational performance. Most of the PM approaches consider the traditional project triangle assessment of project success. Based on the limitations identified in existing PM models, the purpose of this paper is to develop a comprehensive PM model, i.e. Modified Project Quarter Back Rating (MPQR) applicable for construction projects.

Design/methodology/approach

A detailed list of performance areas as a method for PM is analyzed in the construction industry context. Also, industry-specific professionals conducted semi-structured interviews to assess whether these performance areas are sufficient to measure and understand the PM systems.

Findings

The research finding focuses on developing the MPQR model that considers both financial and non-financial areas for performance assessment to provide a holistic assessment of project performance.

Practical implications

MPQR model provides an opportunity to set the benchmark for overall performance for construction organizations.

Originality/value

The findings of the study are expected to provide guidelines to construction professionals for implementing the performance model that will improve performance in the construction industry.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 3 November 2023

Qiuwen Ma, Sai On Cheung and Shan Li

Integrated project delivery (IPD) project that does not use multiparty agreement is identified as IPD-ish. The use of IPD-ish arrangement by incorporating integration practices in…

Abstract

Purpose

Integrated project delivery (IPD) project that does not use multiparty agreement is identified as IPD-ish. The use of IPD-ish arrangement by incorporating integration practices in conventional contract can be viewed as the part of the adoption process of IPD. Moreover, inappropriate integration practices invite new forms of risks and the absence of multiparty agreement adds to the challenges of risk management in IPD-ish projects. This study discusses such challenges and proposes the use of joint risk management to address the potential pitfalls in IPD-ish arrangement.

Design/methodology/approach

A mixed research method was applied. First, the criticality of IPD-ish general and integration-specific risks was examined through a survey. Second, a real IPD-ish project was used to exemplify the use of joint risk management (JRM) to manage IPD-ish risks.

Findings

Two types of risks, namely integration risks (IRs) and general risks (GRs), are identified in IPD-ish projects. Two major findings for the IRs: (1) the most critical IRs are related to unbalanced incentivization and inefficient multidisciplinary teams; and (2) only team formation related pre-contract JRM strategies affect IRs. As for the GRs, the most critical ones are associated with design issues and can be effectively mitigated by post-contract JRM.

Originality/value

Using IPD-ish arrangement is an inevitable part of implementation of full IPD. This happens as many change-averse owners would like to test the integration principles using a conventional contract that they are familiar with. In fact, success in IPD-ish would pave the path for further adoption of IPD. This study offers insight into categorization of risks in IPD-ish projects. Appropriate use of post-contract and organization related pre-contract JRM would improve the chance of teasing out the values of IPD through IPD-ish arrangements. Care should be taken to introduce some contracting integration initiatives, such as risk/reward sharing incentive.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 June 2022

Sara Rankohi, Mario Bourgault and Ivanka Iordanova

Integrated project delivery (IPD) has attracted considerable attention in recent years, however only a few review studies captured the dynamic and evolving nature of this topic…

Abstract

Purpose

Integrated project delivery (IPD) has attracted considerable attention in recent years, however only a few review studies captured the dynamic and evolving nature of this topic. The purpose of this study is to review the most recent IPD publications, in order to shed light on future research.

Design/methodology/approach

Using a systematic review methodology, the study aims to synthesize the current IPD literature, and frame the latest research and development in this domain. A systematic review is conducted to identify the current state-of-the-art of IPD research and the latest research themes and trends in this domain. A bibliometric analysis is performed to explain characteristics of screened articles, and through a thematic analysis the latest themes and trends are recognized.

Findings

In this study, based on IPD characteristics (contractual-regulative, operational-cognitive and organizational-structural), research themes (legal, commercial, technological, procedural, cultural and structural), sub-themes and their associated trends are identified. The latest emerging trends are mostly related to the contractual characteristics of IPD, and are focused on the combination of IPD with new business models and developing contractual guidelines for promoting IPD applications in off-site and on-site construction projects.

Originality/value

This research contributes to the body of knowledge by synthesizing the state of the art of IPD in construction literature and exposing the latest research trends in this area. A theoretical framework of integration in an IPD context is developed, based on the literature. Finally, future areas of studies are discussed.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 September 2022

Sara Rankohi, Mario Bourgault and Ivanka Iordanova

Recent construction literature has been focusing more on integrative contracting approaches such as integrated project delivery (IPD). However, conceptual studies on integration…

Abstract

Purpose

Recent construction literature has been focusing more on integrative contracting approaches such as integrated project delivery (IPD). However, conceptual studies on integration in IPD literature are scattered and fragmented, that is, most of the studies only focused on the segmented dimension of integration. A systemic understanding of the concepts of integration in IPD project-based context is still lacking. To fill this gap, this paper analyzes two aspects of integration (dimensions and directions) in IPD literature and explores their extent in construction projects.

Design/methodology/approach

Grounded theory review and focus group discussion approaches were employed to perform a thorough conceptual review of the literature, frame the research into the theory and increase the fundamental understanding of the concept of integration in IPD literature.

Findings

In this study, IPD integrating techniques were identified and their integration dimensions and directions were discussed. Results show that integration in the project-based environment of IPD is a multidimensional construct. Based on organizational, contractual and operational characteristics of IPD projects, twenty-four integration mechanisms were identified and framed into seven clusters. The integration directions over project life-cycle were demonstrated in three contexts: (1) an on-site construction project, delivered traditionally, (2) an on-site construction project, delivered with IPD and (3) an off-site construction project, delivered with IPD.

Originality/value

This paper gathers the segments of integration into a comprehensive overview, which can help researchers and practitioners explore elements of IPD project success more precisely. A theoretical framework of integration clusters is developed, based on IPD literature. The impact of IPD on on-site versus off-site construction is illustrated from an integration direction perspective. Finally, future areas of studies for researchers and practitioners about the concept of integration in an IPD context are discussed. This paper provides a point of departure for future theoretical and empirical explorations.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 June 2022

Qiuwen Ma, Shan Li, Pei Xin Teo and Florence Yean Yng Ling

Compared with traditional approaches, integrated project delivery (IPD) improves project performance by enhancing integration. To adopt IPD, however, existing practices need to be…

Abstract

Purpose

Compared with traditional approaches, integrated project delivery (IPD) improves project performance by enhancing integration. To adopt IPD, however, existing practices need to be changed, which creates barriers to implementation. This study aims to identify the barriers to IPD practices in China and Singapore, whose practitioners show different types and levels of integration experience.

Design/methodology/approach

A questionnaire survey was administered to two groups of respondents: Chinese and Singaporean. The data were analyzed using three nonparametric techniques, including Wilcoxon signed-rank test, Mann-Whitney-Wilcoxon test, and Spearman rank correlation.

Findings

(1) Of 39 possible barriers, 36 were consistently felt by both Chinese and Singaporean practitioners with different backgrounds; (2) The Chinese group perceived more issues to be significant barriers than the Singaporean group; (3) The Singaporean group had more experience than the Chinese group in performing integration in five areas. This lessens some barriers to adopting IPD practices.

Originality/value

This study is important because it uncovers barriers to the effective implementation of IPD and shows the importance of certain types and levels of integration experience in overcoming these barriers. The results will be useful to practitioners planning to adopt IPD in China or Singapore.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 May 2023

Md Noor Uddin Milon and Habib Zafarullah

Money laundering (ML) is a major criminal offence stemming from unethical practices by personnel on the ground at Chattogram Port, an important import and export facility in…

Abstract

Purpose

Money laundering (ML) is a major criminal offence stemming from unethical practices by personnel on the ground at Chattogram Port, an important import and export facility in Bangladesh. Because money can be more easily laundered through imports, it is necessary to investigate the dubious process in this sector. This study aims to identify the items most regularly used for easy ML and the factors contributing to their vulnerability.

Design/methodology/approach

This research uses a qualitative approach and analyses information from primary sources. Data is obtained from customs officials, port authority personnel, importers and customs brokers through semi-structured questionnaires. Although there are many techniques for ML, this study only found three most overwhelming: under-invoicing, over-invoicing and misdeclaration. A few case studies have been used based on newspaper reports and the internet to triangulate the qualitative data.

Findings

Four import items – food products, garments, capital machinery and chemicals – have a higher risk of ML. This study also revealed that money launderers prefer under-invoicing food and garment items. Misdeclaration is more commonly associated with capital machinery and chemical items. Over-invoicing, on the other hand, is only prevalent in government purchases. The port authorities need to pay particular attention to these issues.

Research limitations/implications

As ML is an ongoing activity that changes over time, the findings of this research are circumscribed by the data collected at a single point in time. Additionally, this research did not consider alternative laundering methods.

Practical implications

The research results can provide a basis for creating effective anti-money laundering (AML) strategies to assist with sustainable economic growth.

Social implications

Developing effective AML measures can help combat corruption and establish good governance in the country and support human well-being.

Originality/value

This paper presents original research findings based on technical analysis. The Chattogram Port Authority and the National Board of Revenue have accepted and used the main findings in a collaborative action plan to tackle ML. The Bangladesh Bank, the country’s central bank, has also incorporated the necessary guidelines and regulations into the Money Laundering Prevention Act, 2012.

Details

Journal of Money Laundering Control, vol. 27 no. 3
Type: Research Article
ISSN: 1368-5201

Keywords

Article
Publication date: 28 August 2023

Haiyan Xie, Ying Hong, Mengyang Xin, Ioannis Brilakis and Owen Shi

The purpose of this study is to improve communication success through barrier identification and analysis so that the identified barriers can help project teams establish…

Abstract

Purpose

The purpose of this study is to improve communication success through barrier identification and analysis so that the identified barriers can help project teams establish effective information-exchange strategies.

Design/methodology/approach

The recent publications on construction communication about time management are reviewed. Then, the semi-structured interviews are performed with both questionnaires and audio recordings (n1 = 18). Next, the collected data are analyzed using both statistical measures on the questionnaire survey and qualitative coding analysis on the text transcripts from an audio recording. Particularly, the identified barriers are substantiated using a scientometrics approach based on the published articles (2011–2020, n2 = 52,915) for purposeful information-sharing solutions in construction time management. Furthermore, the intervention strategies from the top 10 most-cited articles are analyzed and validated by comparisons with the results from construction surveys and relevant studies.

Findings

Based on the discussed communication difficulties, five main barriers were identified during time-cost risk management: probability and statistical concepts, availability of data from external resources, details of team member experiences, graphics (and graphical presentation skills), and spatial and temporal (a.k.a. 4D) simulation skills. For the improvement of communication skills and presentation quality regarding probability and statistical concepts, project teams should emphasize context awareness, case studies and group discussions. Details of communication techniques can be adjusted based on the backgrounds, experiences and expectations of team members.

Research limitations/implications

The dataset n1 has both size and duration limits because of the availability of the invited industry professionals. The dataset n2 considers the literature from 2011 to 2020. Any before-the-date and unpublished studies are not included in the study.

Practical implications

A thorough comprehension of communication barriers can help project teams develop speaking, writing and analytical thinking skills that will enable the teams to better deliver ideas, thoughts and meanings. Additionally, the established discussion on barrier-removal strategies may enhance time management effectiveness, reduce project delays, avoid confusion and misunderstanding and save rework costs.

Social implications

This research calls for the awareness of communication barriers in construction project execution and team collaboration. The identified barriers and the established solutions enrich the approaches of construction companies to share information with communities and society.

Originality/value

This is the first identification model for communication barriers in the time management of the construction industry to the authors' knowledge. The influencing factors and the countermeasures of communication difficulties highlighted by the research were not examined systematically and holistically in previous studies. The findings provide a new approach to facilitate the development of powerful communication strategies and to improve project execution.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 August 2022

Sitsofe Kwame Yevu, Ann Tit Wan Yu, Amos Darko, Gabriel Nani and David J. Edwards

This study aims to investigate the dynamic influences of clustered barriers that hinder electronic procurement technology (EPT) implementation in construction procurement, using…

Abstract

Purpose

This study aims to investigate the dynamic influences of clustered barriers that hinder electronic procurement technology (EPT) implementation in construction procurement, using the neuro-fuzzy system.

Design/methodology/approach

A comprehensive literature review was conducted and 21 barriers to EPT implementation within construction projects were identified. Based on an expert survey, 121 datasets were gathered for this study. Using mean and normalization analysis for the datasets, 15 out of the 21 barriers were deemed to have critical influences in EPT barriers phenomenon. Subsequently, the critical barriers were classified into five groups: human-related; technological risk-related; government-related; industry growth-related; and financial-related. The relationships and influence patterns between the groups of barriers to EPT implementation were analyzed using the neuro-fuzzy system. Furthermore, sensitivity analysis was performed to examine the dynamic influence levels of the barriers within the hindrance level composition.

Findings

The results reveal that addressing one barrier group does not reduce the high levels of hindrances experienced in EPT implementation. However, addressing at least two barrier groups mostly tends to reduce the hindrance levels for EPT implementation. Further, this study revealed that addressing some barrier group pairings, such as technological risk-related and government-related barriers, while other barrier groups remained at a high level, still resulted in high levels of hindrances to EPT implementation in construction procurement.

Research limitations/implications

This study provides insights for researchers to help them contribute to the development of theory with contemporary approaches based on the influence patterns of barrier interrelationships.

Practical implications

This study provides a model that would help practitioners and decision makers in construction procurement to understand and effectively determine the complex and dynamic influences of barrier groups to EPT uptake, for the development of suitable mitigation strategies.

Originality/value

This study provides novel insights into the complex influence patterns among grouped barriers concerning EPT adoption in the construction industry. Researchers and practitioners are equipped with knowledge on the influence patterns of barriers. This knowledge aids the development of effective strategies that mitigate the combined groups of barriers, and promote the wider implementation of EPT in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 447