Marcello Braglia, Francesco Di Paco, Marco Frosolini and Leonardo Marrazzini

This paper presents Quick Changeover Design (QCD), which is a structured methodological approach for Original Equipment Manufacturers to drive and support the design of machines…

1282

Abstract

Purpose

This paper presents Quick Changeover Design (QCD), which is a structured methodological approach for Original Equipment Manufacturers to drive and support the design of machines in terms of rapid changeover capability.

Design/methodology/approach

To improve the performance in terms of set up time, QCD addresses machine design from a single-minute digit exchange of die (SMED). Although conceived to aid the design of completely new machines, QCD can be adapted to support for simple design upgrades on pre-existing machines. The QCD is structured in three consecutive steps, each supported by specific tools and analysis forms to facilitate and better structure the designers' activities.

Findings

QCD helps equipment manufacturers to understand the current and future needs of the manufacturers' customers to: (1) anticipate the requirements for new and different set-up process; (2) prioritize the possible technical solutions; (3) build machines and equipment that are easy and fast to set-up under variable contexts. When applied to a production system consisting of machines subject to frequent or time-consuming set-up processes, QCD enhances both responsiveness to external market demands and internal control of factory operations.

Originality/value

The QCD approach is a support system for the development of completely new machines and is also particularly effective in upgrading existing ones. QCD's practical application is demonstrated using a case study concerning a vertical spindle machine.

Details

Journal of Manufacturing Technology Management, vol. 34 no. 9
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 28 November 2022

Elena Stefana, Paola Cocca, Federico Fantori, Filippo Marciano and Alessandro Marini

This paper aims to overcome the inability of both comparing loss costs and accounting for production resource losses of Overall Equipment Effectiveness (OEE)-related approaches.

1538

Abstract

Purpose

This paper aims to overcome the inability of both comparing loss costs and accounting for production resource losses of Overall Equipment Effectiveness (OEE)-related approaches.

Design/methodology/approach

The authors conducted a literature review about the studies focusing on approaches combining OEE with monetary units and/or resource issues. The authors developed an approach based on Overall Equipment Cost Loss (OECL), introducing a component for the production resource consumption of a machine. A real case study about a smart multicenter three-spindle machine is used to test the applicability of the approach.

Findings

The paper proposes Resource Overall Equipment Cost Loss (ROECL), i.e. a new KPI expressed in monetary units that represents the total cost of losses (including production resource ones) caused by inefficiencies and deviations of the machine or equipment from its optimal operating status occurring over a specific time period. ROECL enables to quantify the variation of the product cost occurring when a machine or equipment changes its health status and to determine the actual product cost for a given production order. In the analysed case study, the most critical production orders showed an actual production cost about 60% higher than the minimal cost possible under the most efficient operating conditions.

Originality/value

The proposed approach may support both production and cost accounting managers during the identification of areas requiring attention and representing opportunities for improvement in terms of availability, performance, quality, and resource losses.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 15 January 2024

Marcello Braglia, Francesco Di Paco, Roberto Gabbrielli and Leonardo Marrazzini

This paper presents a new and well-structured framework that aims to assess the current environmental impact from a Greenhouse Gas (GHG) emissions perspective. This tool includes…

545

Abstract

Purpose

This paper presents a new and well-structured framework that aims to assess the current environmental impact from a Greenhouse Gas (GHG) emissions perspective. This tool includes a new set of Lean Key Performance Indicators (KPIs), which translates the well-known logic of Overall Equipment Effectiveness in the field of GHG emissions, that can progressively detect industrial losses that cause GHG emissions and support decision-making for implementing improvements.

Design/methodology/approach

The new metrics are presented with reference to two different perspectives: (1) to highlight the deviation of the current value of emissions from the target; (2) to adopt a diagnostic orientation not only to provide an assessment of current performance but also to search for the main causes of inefficiencies and to direct improvement implementations.

Findings

The proposed framework was applied to a major company operating in the plywood production sector. It identified emission-related losses at each stage of the production process, providing an overall performance evaluation of 53.1%. The industrial application shows how the indicators work in practice, and the framework as a whole, to assess GHG emissions related to industrial losses and to proper address improvement actions.

Originality/value

This paper scrutinizes a new set of Lean KPIs to assess the industrial losses causing GHG emissions and identifies some significant drawbacks. Then it proposes a new structure of losses and KPIs that not only quantify efficiency but also allow to identify viable countermeasures.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 11 February 2022

Oluseyi Julius Adebowale and Justus Ngala Agumba

Labour productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades. Although several scholarly research projects…

2788

Abstract

Purpose

Labour productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades. Although several scholarly research projects have been conducted to salvage the prevalent low labour productivity in construction, contractors in the construction industry have continued to grapple with the devastating impact of low productivity. The purpose of this study is to determine key areas of focus necessary to promote productivity growth in construction.

Design/methodology/approach

Bibliometric and scientometric assessments were conducted to map the existing construction labour productivity (CLP) studies and establish key focus areas in the research domain. The keywords “Construction Productivity” OR “Construction Labour Productivity” OR “Construction Labor Productivity” OR “Construction Worker Productivity”.

Findings

Emerging trends in the CLP research field are reported. The study also determined the most productive authors and collaboration among authors, most productive journals, most active regions and publications with the highest impact in CLP research.

Research limitations/implications

Documents published in the Scopus database were considered for analysis because of the wider coverage of the database. Journal and conference articles written in English language represent the inclusion criteria, while articles in press, review, book chapters, editorial, erratum, note, short survey and data paper were excluded from analysis. The study is also limited to documents published from 2012 to 2021.

Practical implications

The study brought to the awareness of the industry practitioners and other construction stakeholders, the key knowledge areas that are critical to promoting productivity growth in construction.

Originality/value

Except bibliometric analysis, previous research studies have used different approaches to investigate productivity in construction. The study presented future research directions through the emerging knowledge areas identified in the study.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 7
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 14 July 2020

Marcello Braglia, Leonardo Marrazzini, Luca Padellini and Rinaldo Rinaldi

The purpose of this paper is to present a structured framework whose objectives are to identify, analyse and eliminate fashion-luxury supply chains inefficiencies.

6093

Abstract

Purpose

The purpose of this paper is to present a structured framework whose objectives are to identify, analyse and eliminate fashion-luxury supply chains inefficiencies.

Design/methodology/approach

A Lean Manufacturing tool, the 5-Whys Analysis, has been used to find out the root causes associated with the problem identified from a data analysis of production orders of a fashion-luxury company. A case study, which explains the methodology and illustrates the capability of the tool, is provided.

Findings

This tool can be considered a suitable instrument to identify the causal factors of inefficiencies within luxury supply chains, suggesting potential countermeasures able to eliminate the problems previously highlighted. In addition, enabling technologies that deal with Industry 4.0 are associated with the root causes to enable further improvement of the supply chain.

Practical implications

The effectiveness and practicality of the tool are illustrated using an industrial case study concerning an international Italian signature in the world of fashion-luxury footwear sector.

Originality/value

This framework provides practitioners with an operative tool useful to highlight where the major inefficiencies of fashion-luxury supply chains take place and, at the same time, individuates both the root causes of inefficiencies and the corresponding corrective actions, even considering Industry 4.0 enabling technologies.

Details

Journal of Fashion Marketing and Management: An International Journal, vol. 25 no. 1
Type: Research Article
ISSN: 1361-2026

Keywords

Open Access
Article
Publication date: 21 January 2021

Marcus Bengtsson, Lars-Gunnar Andersson and Pontus Ekström

The purpose of the study is to test if it, by the use of a survey methodology, is possible to measure managers' awareness on, and specifically if there exist preconceived beliefs…

2026

Abstract

Purpose

The purpose of the study is to test if it, by the use of a survey methodology, is possible to measure managers' awareness on, and specifically if there exist preconceived beliefs on, overall equipment effectiveness (OEE) results. The paper presents the design of the survey methodology as well as a test of the survey in one case company.

Design/methodology/approach

Actual OEE logs from a case company are collected and a survey on the data is designed and managers at the same case company are asked to answer the survey. The survey results are followed-up by an interview study in order to get deeper insights to both the results of the survey as well as the OEE strategy at the case company.

Findings

The findings show that the managers at this particular case company, on a general level, does not suffer too much from preconceived beliefs. However, it is clear that the managers have a preconceived belief that lack of material is logged as a loss much more often than what it actually is.

Research limitations/implications

The test has only been performed with data from one case company within the automotive manufacturing industry and only the managers at that case company has been active in the test.

Practical implications

The survey methodology can be replicated and used by other companies to find out how aware their employees are on their OEE results and if possible preconceived beliefs exists.

Originality/value

To the authors' knowledge, this is the first attempt at measuring if preconceived beliefs on OEE results exist.

Details

Journal of Quality in Maintenance Engineering, vol. 28 no. 2
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 3 October 2016

Jon Bokrantz, Anders Skoogh, Torbjörn Ylipää and Johan Stahre

A common understanding of what events to regard as production disturbances (PD) are essential for effective handling of PDs. Therefore, the purpose of this paper is to answer the…

5162

Abstract

Purpose

A common understanding of what events to regard as production disturbances (PD) are essential for effective handling of PDs. Therefore, the purpose of this paper is to answer the two questions: how are individuals with production or maintenance management positions in industry classifying different PD factors? Which factors are being measured and registered as PDs in the companies monitoring systems?

Design/methodology/approach

A longitudinal approach using a repeated cross-sectional survey design was adopted. Empirical data were collected from 80 companies in 2001 using a paper-based questionnaire, and from 71 companies in 2014 using a web-based questionnaire.

Findings

A diverging view of 21 proposed PD factors is found between respondents in manufacturing industry, and there is also a lack of correspondence with existing literature. In particular, planned events are not classified and registered to the same extent as downtime losses. Moreover, the respondents are often prone to classify factors as PDs compared to what is actually registered. This diverging view has been consistent for over a decade, and hinders companies to develop systematic and effective strategies for handling of PDs.

Originality/value

There has been no in-depth investigation, especially not from a longitudinal perspective, of the personal interpretation of PDs from people who play a central role in achieving high reliability of production systems.

Details

Journal of Manufacturing Technology Management, vol. 27 no. 8
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79306

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.