1 – 10 of 620Xin Jin, Geoffrey Shen, Lizi Luo and Xin Zhou
Modular integrated construction (MiC) is an innovative and effective manufacturing-based method of construction that has become the mainstream development direction of projects in…
Abstract
Purpose
Modular integrated construction (MiC) is an innovative and effective manufacturing-based method of construction that has become the mainstream development direction of projects in Hong Kong (HK). However, large-scale promotion of MiC practice still needs efforts. A pressing concern is that the impact of relevant policies on stakeholders during project implementation is rarely explored in depth. Therefore, to fill the research gap, this study aims to investigate the influence of policies on stakeholders to drive the successful implementation of MiC in HK.
Design/methodology/approach
This study uses a strategy of multiple methods. First, a comprehensively literature review and survey were adopted to identify critical policies and stakeholders. Second, semi-structured interviews with 28 experts were conducted to quantify their relationships. Third, three policy–stakeholder networks at initiation, planning and design and construction stages were established using social network analysis.
Findings
Environmental protection policy, COVID-19 pandemic policy and environmental protection policy and quality acceptance standard for project completion are found to be the most important policies of the three stages, respectively. The HK government and developers are highlighted as prominent stakeholders influencing policy implementation at all three stages. The dynamics of the influence stakeholders receive from critical policies at different stages of MiC are discussed. Valuable recommendations are accordingly proposed to enhance the successful implementation of MiC projects from the perspective of various stakeholders.
Originality/value
This study contributes to the body of knowledge by considering the mediating influence of stakeholders during policy implementation in the MiC uptake, and is valuable in helping policymakers to deeply understand the influence of policies to further forward successful MiC implementation and practicality in HK.
Details
Keywords
Xiaolin Li, Huimin Li, Ruirui Zhang, Yilin Yin, Shaonan Sun, Juan Bai and Ruihua Liu
The purpose of this study is to explore the impact of asymmetric trust on construction project management performance in China's construction industry. Moreover, the authors…
Abstract
Purpose
The purpose of this study is to explore the impact of asymmetric trust on construction project management performance in China's construction industry. Moreover, the authors explore the mediating role of two types of knowledge sharing (explicit knowledge sharing and tacit knowledge sharing) in explaining the association between asymmetric trust and project management performance.
Design/methodology/approach
A theoretical model based on the research hypotheses proposed in this study was developed and a questionnaire survey was conducted with 271 professionals. The data collected was analyzed by the structural equation modeling (SEM) technique.
Findings
The results of this study indicate that there is a significant and negative association between asymmetric trust and project management performance. Moreover, two types of knowledge sharing (explicit knowledge sharing and tacit knowledge sharing) have different degrees of impact on improving project management performance. In addition, tacit knowledge sharing is a mediator between asymmetric trust and project management performance.
Research limitations/implications
The data used in this study is from Chinese scenarios, so the research conclusions and application effects based on this are bound to have certain regional limitations. Besides, there are many factors that affect project management performance improving, and the relationships among them are so complex. The theoretical model proposed in this study may not be fully considered. Therefore, follow-up researchers can consider bringing more suitable variables into their researches, so that the theoretical researches can be more in line with the actual project management practice, and the specific mechanism for improving project management performance can be explained more deeply.
Originality/value
This research's value is as follows: Firstly, this paper contributes to the trust and relational governance literature by expanding the research perspective of mutual trust to asymmetric trust. Specially, this research designs a measurement scale for asymmetric trust and then reveals the impact mechanism of it on project management performance, which will certainly promote research paradigm change of trust. Secondly, this research is beneficial to knowledge sharing literature in the construction management field by expanding the research scope of knowledge sharing from a cross-organizational perspective.
Details
Keywords
Xiaowei An, Sicheng Ren, Lunyan Wang and Yehui Huang
The purpose of this paper is to explore the support for multi-party collaboration in project construction provided by building information modeling (BIM). Based on the perspective…
Abstract
Purpose
The purpose of this paper is to explore the support for multi-party collaboration in project construction provided by building information modeling (BIM). Based on the perspective of value co-creation, the research results can provide support for the collaborative application and contract design of BIM platform.
Design/methodology/approach
In this paper, an evolutionary game model involving the owner, designer and constructor is constructed by using prospect theory and evolutionary game theory. Through simulation analysis, the evolution law of the strategy choice of each party in the collaborative application of BIM platform is discussed and the key factors affecting the strategy choice of all parties are analyzed.
Findings
The results show that there is an ideal local equilibrium point with progressive stability in the evolutionary game between the three parties: “the construction party shares information, the designer receives the information and optimizes the project and the owner does not provide incentives”; in addition, the opportunistic behaviors of the design and construction parties, as well as the probability of such behaviors being detected and the subsequent punishment have a significant impact on the evolutionary outcome.
Originality/value
This method can provide support for the collaborative application and contract design of BIM platform.
Details
Keywords
Jonas Ūsas, Tomas Balezentis and Dalia Streimikiene
The Green Deal strategy of the European Union (EU) as well as the increasing concerns over resource scarcity worldwide has put forward such concepts as the circular economy. This…
Abstract
Purpose
The Green Deal strategy of the European Union (EU) as well as the increasing concerns over resource scarcity worldwide has put forward such concepts as the circular economy. This paper seeks to compare the progress of the development of the circular economy across the EU Member States. Such analysis is helpful in guiding the circular economy support policies.
Design/methodology/approach
This paper develops a quantitative framework for analysis of the implementation of the circular economy objectives in the EU Member States. The framework proposed includes three multi-criteria decision making methods representing reference point and outranking approaches. The use of multiple methods allows exploiting the differences in the underlying aggregation principles.
Findings
Germany, Sweden and the Netherlands appear as the most advanced in the sense of circular economy development. The results indicate that the water-locked small countries and the new EU Member States are among the lowest performing ones. The flows of the waste need to be monitored more tightly in order to increase the circularity. The development of recycling facilities can also increase circularity irrespectively of the economic development level (e.g. the case of Bulgaria).
Originality/value
The paper contributes to the discussion regarding the circular economy by proposing an indicator system and the multi-criteria analysis framework. The proposed indicator system covers input use (circularity), trade flows and recycling processes. The proposed framework can be applied to track the progress of different countries in implementing the targets of the circular economy.
Details
Keywords
Frank Ato Ghansah and Weisheng Lu
While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the…
Abstract
Purpose
While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.
Design/methodology/approach
This is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.
Findings
The study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.
Practical implications
The findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.
Originality/value
The study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory.
Details
Keywords
Kenneth Lawani, Farhad Sadeghineko, Michael Tong and Mehmethan Bayraktar
The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D…
Abstract
Purpose
The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D laser scanning technologies. This case study integrated 3D laser point cloud scans with BIM to explore the effects of BIM adoption on ongoing construction project, whilst evaluating the utility of 3D laser scanning technology for producing structural 3D models by converting point cloud data (PCD) into BIM.
Design/methodology/approach
The primary data acquisition adopted the use of Trimble X7 laser scanning process, which is a set of data points in the scanned space that represent the scanned structure. The implementation of BIM with the 3D PCD to explore the precision and effectiveness of the construction processes as well as the as-built condition of a structure was precisely captured using the 3D laser scanning technology to recreate accurate and exact 3D models capable of being used to find and fix problems during construction.
Findings
The findings indicate that the integration of BIM and 3D laser scanning technology has the tendency to mitigate issues such as building rework, improved project completion times, reduced project cost, enhanced interdisciplinary communication, cooperation and collaboration amongst the project duty holders, which ultimately enhances the overall efficiency of the construction project.
Research limitations/implications
The acquisition of data using 3D laser scanner is usually conducted from the ground. Therefore, certain aspects of the building could potentially disturb data acquisition; for example, the gable and sections of eaves (fascia and soffit) could be left in a blind spot. Data acquisition using 3D laser scanner technology takes time, and the processing of the vast amount of data acquired is laborious, and if not carefully analysed, could result in errors in generated models. Furthermore, because this was an ongoing construction project, material stockpiling and planned construction works obstructed and delayed the seamless capture of scanned data points.
Originality/value
These findings highlight the significance of integrating BIM and 3D laser scanning technology in the construction process and emphasise the value of advanced data collection methods for effectively managing construction projects and streamlined workflows.
Details
Keywords
Seyed Ashkan Zarghami and Ofer Zwikael
A variety of buffer allocation methods exist to distribute an aggregated time buffer among project activities. However, these methods do not pay simultaneous attention to two key…
Abstract
Purpose
A variety of buffer allocation methods exist to distribute an aggregated time buffer among project activities. However, these methods do not pay simultaneous attention to two key attributes of disruptive events that may occur during the construction phase: probability and impact. This paper fills this research gap by developing a buffer allocation method that takes into account the synergistic impact of these two attributes on project activities.
Design/methodology/approach
This paper develops a three-step method, calculating the probability that project activities are disrupted in the first step, followed by measuring the potential impact of disruption on project activities, and then proposing a risk-informed buffer allocation index by simultaneously integrating probability and impact outputs from the first two steps.
Findings
The proposed method provides more accurate results by sidestepping the shortcomings of conventional fuzzy-based and simulation-based methods that are purely based on expert judgments or historical precedence. Further, the paper provides decision-makers with a buffer allocation method that helps in developing cost-effective buffering and backup strategies by prioritizing project activities and their required resources.
Originality/value
This paper develops a risk-informed buffer allocation method that differs from those already available. The simultaneous pursuit of the probability and impact of disruptions distinguishes our method from conventional buffer allocation methods. Further, this paper intertwines the research domains of complexity science and construction management by performing centrality analysis and incorporating a key attribute of project complexity (i.e. the interconnectedness between project activities) into the process for buffer allocation.
Details
Keywords
Liang Hong and Siti Rohaida Mohamed Zainal
Researcher agreed that job performance has a positive effect on productivity as well as an organisation’s efficiency. Thus, this study aims to investigate the impact of…
Abstract
Purpose
Researcher agreed that job performance has a positive effect on productivity as well as an organisation’s efficiency. Thus, this study aims to investigate the impact of mindfulness skill, inclusive leadership (IL), employee work engagement and self-compassion on the overall job performance of secondary school teachers in Hong Kong. It then evaluates the mediating effect of employee work engagement between the relationships of mindfulness skill, IL and job performance, as well as the moderate effect of self-compassion between the relationships of mindfulness skill, IL and employee work engagement.
Design/methodology/approach
The sample comprised 263 teachers working from three secondary schools in Sha Tin, Hong Kong. The data was then analysed using Smart PLS version 4.0.9.
Findings
The results showed significant positive relationships between mindfulness skill and IL towards employee work engagement and between employee work engagement and job performance; meanwhile, there emerged a significant effect on the relationship between mindfulness skill and IL towards job performance. Furthermore, this research has confirmed that self-compassion did not moderate the relationship between mindfulness skill, IL and employee work engagement, but employee work engagement plays a mediating effect on the relationship between mindfulness skill, IL and job performance.
Originality/value
This research has helped to fill the literature gap by examining the mediating roles of employee work engagement and mediator role of self-compassion in the integrated relationship of multi-factor and job performance. Examining the mediating role of employee work engagement has helped to enhance the understanding of the underlying principle of the indirect influence of mindfulness skill, IL and job performance. The result of this research shows that self-compassion plays a vital role in influencing the employees’ work engagement. Hence, it is important that companies design human resource management policy that enables self-compassion to be used as a consideration psychological-related strategy when structing organisation or teams. It is also crucial for top management and policymakers to define and communicate the organisation’s operating principle, value and goals.
Details
Keywords
Shan Shan Lu, Ruwen Tian and Dickson K.W. Chiu
The study aims to investigate the characteristics of the current situation of library programs and explore the possible reasons behind the low participation in Hong Kong. It…
Abstract
Purpose
The study aims to investigate the characteristics of the current situation of library programs and explore the possible reasons behind the low participation in Hong Kong. It focuses on the development of library programs in the era of digital technology, which can lead to discussion and reflections on the further development of library programs with innovative technology services.
Design/methodology/approach
This study applied a mixed-method research approach to investigate the current situation of library programming and the reasons for low participation in Hong Kong. The first part analyzes the characteristics of library programs offered by the Hong Kong Public Libraries (HKPL) through data collection from the HKPL website. The second part of this study investigated the reasons behind the low participation in library programs through quantitative research through an online survey.
Findings
The findings show that current library programs were dominated by reading activities and children's programs to a great extent, which both users and non-users are not very interested in. Further, most respondents expressed more interest in cultural and leisure events and hands-on activities (especially new technologies related) than traditional library programming. Many lapsed and non-users chose not to attend the library programs for boredom and uselessness. As a result, there is a need for HKPL to adjust its services to stay relevant to the needs and interests of local communities.
Originality/value
Scant studies explored the reasons behind non-users of public library programs, especially in Asia. This research contributes to the literature by analyzing and proposing the characteristics of the current situation of library programs and exploring the possible reasons behind the low participation in Hong Kong.
Details
Keywords
Kashif Noor, Mubashir Ali Siddiqui and Amir Iqbal Syed
This study was conducted to analyze the effects of machining parameters on the specific energy consumption in the computerized numerical control lathe turning operation of a…
Abstract
Purpose
This study was conducted to analyze the effects of machining parameters on the specific energy consumption in the computerized numerical control lathe turning operation of a hardened alloy steel roll at low cutting speeds. The aim was to minimize its consumption.
Design/methodology/approach
The design matrix was based on three variable factors at three levels. Response surface methodology was used for the analysis of experimental results. Optimization was carried out by using the desirability function and genetic algorithm. A multiple regression model was used for relationship build-up.
Findings
According to desirability function, genetic algorithm and multiple regression analysis, optimal machining parameters were cutting speed 40 m/min, feed 0.2 mm/rev and depth of cut 0.50 mm, which resulted in minimal specific energy consumption of 0.78, 0.772 and 0.78 kJ/mm3, respectively. Correlation analysis and multiple regression model found a quadratic relationship between specific energy consumption with power consumption and material removal rate.
Originality/value
In the past, many researchers have developed mathematical models for specific energy consumption, but these models were developed at high cutting speed, and a majority of the models were based on the material removal rate as the independent variable. This research work developed a mathematical model based on the machining parameters as an independent variable at low cutting speeds, for a new type of large-sized hardened alloy steel roll. A multiple regression model was developed to build a quadratic relationship of specific energy consumption with power consumption and material removal rate. This work has a practical application in hot rolling industry.