Article
Publication date: 6 February 2024

Moslem Sheikhkhoshkar, Hind Bril El Haouzi, Alexis Aubry and Farook Hamzeh

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control…

Abstract

Purpose

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control metrics have been devised and put into practice, often with little emphasis on analyzing their underlying concepts. To cover this gap, this research aims to identify and analyze a holistic list of control metrics and their functionalities in the construction industry.

Design/methodology/approach

A multi-step analytical approach was conducted to achieve the study’s objectives. First, a holistic list of control metrics and their functionalities in the construction industry was identified. Second, a quantitative analysis based on social network analysis (SNA) was implemented to discover the most important functionalities.

Findings

The results revealed that the most important control metrics' functionalities (CMF) could differ depending on the type of metrics (lagging and leading) and levels of control. However, in general, the most significant functionalities include managing project progress and performance, evaluating the look-ahead level’s performance, measuring the reliability and stability of workflow, measuring the make-ready process, constraint management and measuring the quality of construction flow.

Originality/value

This research will assist the project team in getting a comprehensive sensemaking of planning and control systems and their functionalities to plan and control different dynamic aspects of the project.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 4 July 2023

Muhammad Sami Ur Rehman, Muhammad Tariq Shafiq, Fahim Ullah and Khaled Galal Ahmed

The purpose of this study is to investigate the current construction progress monitoring (CPM) process in relation to the contractual obligations, how project management teams…

Abstract

Purpose

The purpose of this study is to investigate the current construction progress monitoring (CPM) process in relation to the contractual obligations, how project management teams carry out this activity in the field and why teams continue to adopt the current method. The study aims to provide a comprehensive understanding of the current monitoring process and its effectiveness, identify any shortcomings and propose recommendations for improvements that can lead to better project outcomes.

Design/methodology/approach

The study conducted semi-structured interviews with 28 construction management practitioners to explore their views on contractual requirements, traditional progress monitoring practices and advanced monitoring methods. Thematic analysis was used to identify existing processes, practices and incentives for advanced monitoring.

Findings

Standard construction contracts mandate current progress monitoring practices, which often rely on manual, document-centric and labor-intensive methods, leading to slow and erroneous progress reporting and project delays. Key barriers to adopting advanced tools include rigid contractual clauses, lack of incentives and the absence of reliable automated tools. A holistic automated approach that covers the entire CPM process, from planning to claim management, is needed as a viable alternative to traditional practices.

Research limitations/implications

The study's findings can inform researchers, stakeholders and decision-makers about the existing monitoring practices and contribute to enhancing project management practices.

Originality/value

The study identified contractually mandated progress monitoring processes, traditional methods of collecting, transferring, analyzing and dispensing progress-related information and potential incentives and points of departure towards technologically advanced methods.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 1 June 2022

James T. O'Connor, Fernanda Leite and Jong Won Ma

The purpose of this paper is to present a comprehensive analysis on how the advanced work packaging (AWP) managerial paradigm could be advanced by incorporating and integrating…

Abstract

Purpose

The purpose of this paper is to present a comprehensive analysis on how the advanced work packaging (AWP) managerial paradigm could be advanced by incorporating and integrating the post-construction commissioning and startup (CSU) phases.

Design/methodology/approach

This study was implemented with the support of consolidated knowledge from industry subject matter experts and an exhaustive literature review to provide a knowledge foundation for the developments. The findings were further validated and strengthened by external subject matter experts.

Findings

A new operating system-oriented work package, systems work package (SWP), is devised with a set of definitions and models of how it relates to AWPs with three-dimensional visualizations. SWP-related constraints, key roles and responsibilities are thoroughly investigated.

Research limitations/implications

A new SWP concept would pose potential challenges for its adoption because of inherent organizational culture and hesitation to change. A systematic reorganization of existing practices is considered as a key strategy to alleviate the limitation, and short- and long-term validity of SWP is currently being investigated by organizations.

Practical implications

This research provides practical implementation strategies on CSU integration which lead to benefits including: better alignment and collaboration of stakeholders, reduced costs for associating AWPs to SWP and improved predictability.

Originality/value

AWP-related studies have primarily focused on the construction phase, with minimal integration of CSU considerations. Highlighting the importance of the philosophy “start with the end in mind,” this research describes how the AWP managerial paradigm can be expanded to include CSU, by placing a strong emphasis on understanding CSU priorities, sequences and constraints.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Book part
Publication date: 12 April 2024

Glenys Caswell

Abstract

Details

Time of Death
Type: Book
ISBN: 978-1-80455-006-9

Article
Publication date: 11 August 2022

Yanhu Han, Xiyu Yan and Poorang Piroozfar

As a strand in industrialization movement in architecture, engineering and construction (AEC) industry, prefabricated construction (PC) has gained widespread popularity due to…

1846

Abstract

Purpose

As a strand in industrialization movement in architecture, engineering and construction (AEC) industry, prefabricated construction (PC) has gained widespread popularity due to high efficiency, energy saving, low environmental impacts, safety and other advantages of PC. Well-managed supply chain can further leverage the advantages of PC. However, there is a lack of more systematically overview of the prefabricated construction supply chain (PCSC). This paper aims to comb the current status and look into the future direction of PCSC by reviewing the existing research.

Design/methodology/approach

In total, 131 articles related to prefabricated construction supply chain management (PCSCM) from 2000 to 2022 have been collated to (1) conduct a bibliometric analysis by using VOSviewer, including the literature sources, keywords co-occurrence, co-authorships, authorship citation and country active in the field of PCSCM; (2) classify and summarize the status of research in PCSCM through qualitative discussion and (3) point out the future research directions.

Findings

In total, 131 articles are carried out for bibliometric analysis and in-depth qualitative discussion, the visualization maps and the main research themes in the field of PCSCM are obtained. The results show that supply chain intelligentization and informatization are hot topics. Finally, future research directions that should be paid attention to in the field of PCSCM are pointed out.

Practical implications

This study can help project managers understand the current status and problems of PCSC operations and provide a basis for future management decisions.

Originality/value

Compared with previous studies, this study adds the dimension of “article authorship” to the quantitative analysis and discusses the research themes in the field of PCSCM in a comprehensive manner. In addition, this paper deeply discusses the main research topics from both the specific contents and research methods adopted.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 26 May 2023

Sina Moradi and Piia Sormunen

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…

2782

Abstract

Purpose

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.

Design/methodology/approach

A systematic literature review was conducted to fulfill the purpose of this study.

Findings

The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.

Originality/value

The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 March 2024

Suresh Renukappa, Subashini Suresh, Nisha Shetty, Lingaraja Gandhi, Wala Abdalla, Nagaraju Yabbati and Rahul Hiremath

The COVID-19 pandemic has affected around 216 countries and territories worldwide and more than 2000 cities in India, alone. The smart cities mission (SCM) in India started in…

33

Abstract

Purpose

The COVID-19 pandemic has affected around 216 countries and territories worldwide and more than 2000 cities in India, alone. The smart cities mission (SCM) in India started in 2015 and 100 smart cities were selected to be initiated with a total project cost of INR 2031.72 billion. Smart city strategies play an important role in implementing the measures adopted by the government such as the issuance of social distancing regulations and other COVID-19 mitigation strategies. However, there is no research reported on the role of smart cities strategies in managing the COVID-19 outbreak in developing countries.

Design/methodology/approach

This paper aims to address the research gap in smart cities, technology and healthcare management through a review of the literature and primary data collected using semi-structured interviews.

Findings

Each city is unique and has different challenges, the study revealed six key findings on how smart cities in India managed the COVID-19 outbreak. They used: Integrated Command and Control Centres, Artificial Intelligence and Innovative Application-based Solutions, Smart Waste Management Solutions, Smart Healthcare Management, Smart Data Management and Smart Surveillance.

Originality/value

This paper contributes to informing policymakers of key lessons learnt from the management of COVID-19 in developing countries like India from a smart cities’ perspective. This paper draws on the six Cs for the implications directed to leaders and decision-makers to rethink and act on COVID-19. The six Cs are: Crisis management leadership, Credible communication, Collaboration, Creative governance, Capturing knowledge and Capacity building.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 17 November 2023

Rebecca Kassa, Ibilola Ogundare, Brian Lines, Jake B. Smithwick, Nancy J. Kepple and Kenneth T. Sullivan

Construction organizations' investment in effective talent-development programs is a key strategy in attracting, developing and retaining staff. Such programs are especially…

Abstract

Purpose

Construction organizations' investment in effective talent-development programs is a key strategy in attracting, developing and retaining staff. Such programs are especially important given the current challenges in the construction workforce, including labor shortages, an aging workforce, generational differences in the workforce, supply chain disruptions and the need to effectively train staff in the skills that are essential in a constrained labor environment. To address these challenges, this study proposes a performance measurement strategy that construction companies can use as input to design their talent development programs.

Design/methodology/approach

The strategy intends to assess the performance of project managers and develop criteria that define categories of their performance, including the top performers' category. This enables construction organizations to provide each project manager with individualized training that addresses areas of weakness and in turn, develops the skills that correspond with being top performers. The proposed strategy was developed and tested by surveying the immediate supervisors of 187 project managers working for general and specialty contractors in the United States. Principal component analysis was used to develop a single performance construct from seven performance criteria.

Findings

This construct was used to organize the project managers into the categories of top, above-average and below-average performers. According to the findings, top-performing project managers have well-rounded skills in the areas of leadership, communication, technical proficiency and overall job knowledge.

Practical implications

The outcomes of this study can help construction organizations focus their talent-development programs on the skills most associated with PMs being top performers.

Originality/value

This study provides construction organizations with a comprehensive performance-measuring construct to focus their talent-development programs on the skills most associated with top-performing project managers. Researchers can use this study as a foundation for further understanding how performance is related to various construction professions.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 November 2022

Jing Yin, Jiahao Li, Ahui Yang and Shunyao Cai

In regarding to operational efficiency and safety improvements, multiple tower crane service scheduling problem is one of the main problems related to tower crane operation but…

Abstract

Purpose

In regarding to operational efficiency and safety improvements, multiple tower crane service scheduling problem is one of the main problems related to tower crane operation but receives limited attention. The current work presents an optimization model for scheduling multiple tower cranes' service with overlapping areas while achieving collision-free between cranes.

Design/methodology/approach

The cooperative coevolutionary genetic algorithm (CCGA) was proposed to solve this model. Considering the possible types of cross-tasks, through effectively allocating overlapping area tasks to each crane and then prioritizing the assigned tasks for each crane, the makespan of tower cranes was minimized and the crane collision avoidance was achieved by only allowing one crane entering the overlapping area at one time. A case study of the mega project Daxing International Airport has been investigated to evaluate the performance of the proposed algorithm.

Findings

The computational results showed that the CCGA algorithm outperforms two compared algorithms in terms of the optimal makespan and the CPU time. Also, the convergence of CCGA was discussed and compared, which was better than that of traditional genetic algorithm (TGA) for small-sized set (50 tasks) and was almost the same as TGA for large-sized sets.

Originality/value

This paper can provide new perspectives on multiple tower crane service sequencing problem. The proposed model and algorithm can be applied directly to enhance the operational efficiency of tower cranes on construction site.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 October 2021

Sharareh Kermanshachi, Thahomina Jahan Nipa and Bac Dao

The purpose of this study is to ascertain and list the most effective management strategies in efficiently handling the project complexities to enhance the performance of the…

Abstract

Purpose

The purpose of this study is to ascertain and list the most effective management strategies in efficiently handling the project complexities to enhance the performance of the project.

Design/methodology/approach

To fulfill the aim of this study, a comprehensive literature review was conducted, and the qualitative Delphi technique in two rounds was applied. Participants of the Delphi technique consisted of 12 subject matter experts (SMEs) with cumulative experience of 250 years in working in construction projects. In the first round of the Delphi technique, SMEs were asked to provide complexity management strategies to address the complexities due to 37 complexity indicators (CIs) under 11 complexity categories. In the second round of the Delphi technique, SMEs identified the top three management strategies for each of the 37 CIs.

Findings

This study collected the outcome of the two-round Delphi technique and based on the output developed the list of strategies to manage complexities related to each indicator. For example, establishing a well-informed governance team, assigning a Project Manager (PM) when the number of projects is more than one in an organization, and assigning a PM efficient enough to communicate with higher authority effectively will help in managing complexity that arises due to faulty assessment of the influence of a project on the organization’s overall success.

Originality/value

This study will help practitioners in effectively managing the project complexities, and thus will reduce the monetary loss associated with project complexities.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords