Article
Publication date: 20 February 2024

Huy Minh Vo, Jyh-Bin Yang and Veerakumar Rangasamy

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus…

Abstract

Purpose

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus on whether existing DAMs effectively resolve delays, particularly in the case of complex concurrent delays. Thus, the primary objective of this study is to undertake a comprehensive and systematic literature review on concurrent delays, aiming to answer the following research question: Do existing delay analysis techniques deal with concurrent delays well?

Design/methodology/approach

This study conducts a comprehensive review of concurrent delays by both bibliometric and systematic analysis of research publications published between 1982 and 2022 in the Web of Science (WoS) and Scopus databases. For quantitative analysis, a bibliometric mapping tool, the VOSviewer, was employed to analyze 68 selected publications to explore the co-occurrence of keywords, co-authorship and direct citation. Additionally, we conducted a qualitative analysis to answer the targeted research question, identify academic knowledge gaps and explore potential research directions for solving the theoretical and practical problems of concurrent delays.

Findings

Concurrent delays are a critical aspect of delay claims. Despite DAMs developed by a limited number of research teams to tackle issues like concurrence, float consumption and the critical path in concurrent delay resolution, practitioners continue to face significant challenges. This study has successfully identified knowledge gaps in defining, identifying, analyzing and allocating liability for concurrent delays while offering promising directions for further research. These findings reveal the incompleteness of available DAMs for solving concurrent delays.

Practical implications

The outcomes of this study are highly beneficial for practitioners and researchers. For practitioners, the discussions on the resolution process of concurrent delays in terms of identification, analysis and apportionment enable them to proactively address concurrent delays and lay the groundwork for preventing and resolving such issues in their construction projects. For researchers, five research directions, including advanced DAMs capable of solving concurrent delays, are proposed for reference.

Originality/value

Existing research on DAMs lacks comprehensive coverage of concurrent delays. Through a scientometric review, it is evident that current DAMs do not deal with concurrent delays well. This review identifies critical knowledge gaps and offers insights into potential directions for future research.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 October 2022

Shumank Deep, Thayaparan Gajendran, Marcus Jefferies, Venkata Suresh Uggina and Sanjay Patil

Research on strategic procurement was mostly focussed on the clients' and main contractors' perspectives, while limited work had been done from a subcontractor's perspective. The…

Abstract

Purpose

Research on strategic procurement was mostly focussed on the clients' and main contractors' perspectives, while limited work had been done from a subcontractor's perspective. The paper hypothesises that “strategic capability” influences the latent constructs of power, dependence and collaboration in the main contractor–subcontractor relationship. Therefore, the purpose of this study is to investigate the influence of a subcontractor's strategic capabilities on power, dependence and collaboration.

Design/methodology/approach

A survey questionnaire was developed and distributed amongst the subcontractors in Australia, and 212 complete responses were received. Then second order confirmatory factor analysis and partial least square structure equation modelling (PLS-SEM) analysis were performed to test the hypothesised relationships.

Findings

The findings support “strategic capabilities” as a construct expressive of a subcontractor's unique market position and good business reputation. The findings also suggest that strategically capable subcontractors enhance their potential for forming partnerships with main contractors through dependence (StratC. → Dep., β = 0.84; Effect Size (ES) = 0.713; p < 0.01), collaboration (StratC. → Collab., β = 0.84; ES = 0.697; p < 0.01) and bargaining power (StratC. → Pow., β = 0.83; ES = 0.672; p < 0.01).

Originality/value

The study is one of its kind to explore the impact of a subcontractor's strategic capability on their bargaining power, dependability and ability to form collaborations. Furthermore, results indicate that the “strategic capabilities” of subcontractors can strongly influence their ability to create “dependence”, foster “collaboration” and exert “power” over a main contractor. The findings can help improve the strategic procurement decision-making processes of both subcontractors and main contractors to build better business relationships.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 2022

Chijoo Lee

Work crew productivity and the application of limited resources are necessary elements in construction duration delay analysis. This study thus proposes a method to analyze…

Abstract

Purpose

Work crew productivity and the application of limited resources are necessary elements in construction duration delay analysis. This study thus proposes a method to analyze construction delays and resource reallocation based on work crew productivity and resource constraints. The study also presents an economic feasibility analysis that maximizes economic effect by reducing construction duration, the cost of resource reallocation, delay liquidated damages (DLDs) and incentives for reducing contractual duration.

Design/methodology/approach

The proposed method involved three steps. First, work crew characteristics such as productivity, unit price and workload helped analyze delay information, including delay duration, reducible duration and daily reduced cost. Next, a goal programming method assessed resource reallocation based on the priority (as determined by decision-makers) of each constraint condition, such as the available number of workers, cost, goal workload and statutory working hours. Lastly, the level of reallocation was analyzed based on the results of the economic feasibility analysis and decision-makers’ delay attitudes.

Findings

A case study was performed to test the proposed method's applicability. Its involved sensitivity analysis indicated proposing to decision-makers a scenario based on the prioritization of economic feasibility. The proposed method's applicability proved high for decision-makers, as they can determine whether to reduce construction duration per the proposed data.

Originality/value

The proposed method's main contribution is the reallocation of resources to reduce construction duration based on work crew productivity and the prioritization of limited resources. The proposed method can analyze the differences in productivity between the plan and actual progress, as well as calculate the necessary number of workers. Decision-makers can then reduce the appropriate level of contractual duration based on their own delay attitude, constraint condition prioritization and results from daily economic feasibility analyses.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 February 2022

Craig Langston

Innovation during project delivery is contested space. The aim in this research is to empirically explore the theory of this contested space and how project implementation can be…

Abstract

Purpose

Innovation during project delivery is contested space. The aim in this research is to empirically explore the theory of this contested space and how project implementation can be optimized by the contractor to deliver better outcomes. It is hypothesized that project innovation has a proportional and measurable relationship to contractor success.

Design/methodology/approach

Based on a novel conceptual framework, this research applies a case study methodology to analyse 31 construction projects undertaken by a single Australian middle-tier contractor. Benefits from innovation are not often equitably shared. There are risks and rewards. The project innovation zone is defined as a combination of three key performance indicators – efficacy, efficiency and margin – merged into a single index that most likely shows evidence of “working smarter”.

Findings

Client–contractor project innovation (c2pi) is demonstrated to be strongly correlated with head contractor success (HCS), yielding an r2 value of 71%. Innovative projects mostly show positive change in efficacy, efficiency and margin when comparing “planned” and “actual” outcomes. Across the cases studied, 35% demonstrated likely evidence of innovative delivery and 52% demonstrated evidence of success from the construction contractor's perspective.

Originality/value

These findings verify that, within the studied sample, the pursuit of innovation leads to projects that are likely to also have greater success for the head contractor, evidenced by the mix of five critical success factors: finishing on schedule, making profit, and having less defects, less accidents and higher quality workmanship. These outcomes arguably also apply to sub-contractors, where the head contractor assumes the role of “client”.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 August 2022

Gulden Gumusburun Ayalp and Tülay Çivici

The construction industry is a crucial industry for national development worldwide. Because the construction industry is tied to national and international economic activities…

Abstract

Purpose

The construction industry is a crucial industry for national development worldwide. Because the construction industry is tied to national and international economic activities, the COVID-19 outbreak has limited construction projects. Therefore, this study investigates the most influential factors regarding COVID-19 and their effects on the construction industry.

Design/methodology/approach

The potential impacts of COVID-19 on the construction industry were identified through a realistic literature review and interviews with professionals. A questionnaire was distributed via e-mail to architects, civil engineers and contractors who play vital roles during the construction processes. The data were analysed using SPSS 22 and LISREL 8.7 software to quantify the most influential pandemic-related factors faced by the construction industry.

Findings

Ten influential pandemic factors affecting the construction industry in Turkey were identified. Among them, “increased costs and price escalations due to shortage of raw materials and supply chain disruption” and “challenges with payment and cash flows” were determined as the most influential pandemic factors.

Research limitations/implications

This research aims to advance comprehension of pandemic impacts and contributes an incipient assessment framework based on 10 determined pandemic factors. Therefore, contractors, architects and civil engineers may analyse their weaknesses and organise precise priorities so that their firms may remain competitive, thus minimising the adverse impact of COVID-19 and possible forthcoming waves.

Originality/value

Few studies have identified the effect of pandemics on the construction industry qualitatively, forcing management to make projections to the current situation. Moreover, no study has provided insights into the influential factors of pandemics using quantitative methods. Therefore, this study comprehensively and quantitatively determines the relevant COVID-19 pandemic factors using exploratory factor analysis (EFA) and utilises confirmatory factor analysis (CFA) and structural equation modelling to present a structural model of how pandemic factors affect the Turkish construction industry.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 January 2022

Ali Mohammad Mirzaee, M. Reza Hosseini, Igor Martek, Payam Rahnamayiezekavat and Mehrdad Arashpour

Legal remedies are incorporated into international construction joint ventures (ICJVs) to mitigate contractual breaches. The effectiveness of remedies is predicated on two…

Abstract

Purpose

Legal remedies are incorporated into international construction joint ventures (ICJVs) to mitigate contractual breaches. The effectiveness of remedies is predicated on two conditions; the comprehensiveness of the contract and its enforceability within the jurisdiction of interpretation. Relational-related weaknesses contribute to contracting parties placing a premium on the contract's capacity for mediating the relationship. However, contracts are not always enforceable. This study aims to examine means by which joint venture relational governance can be maintained under conditions of minimal legal recourse.

Design/methodology/approach

A relational contracting (RC) theory was used as the theoretical underpinning of the paper. Data were collected and analyzed following a multiple-case study approach from case projects in which ICJVs' was used.

Findings

The findings reveal (1) 17 relational and contractual governance problems; the main six being contractual flexibility, contractual joint venture system, contract reviewing, project conflict, national culture and leader–follower transgressions; (2) relational and contractual governance problems are managed differently, depending on financing sources and partners' national culture; and (3) that a developed RC-based framework comprising four stages is able to facilitate relational and contractual governance in ICJVs.

Originality/value

This study is novel in providing a guided approach to developing non-legal remedies for the mitigation of contractual breaches in ICJVs, grounded in theory and contextualized for the construction sector.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 June 2022

Shumank Deep, Rajesh Joshi and Sanjay Patil

Construction industry is one of the worst affected sectors due to the impact of the current coronavirus disease 2019 (COVID-19) outbreak. Therefore, the purpose of this study was…

Abstract

Purpose

Construction industry is one of the worst affected sectors due to the impact of the current coronavirus disease 2019 (COVID-19) outbreak. Therefore, the purpose of this study was to identify the key competencies that should be demonstrated by the contractors in the post-COVID-19 scenario to make them resilient to the adverse impact of pandemic outbreaks.

Design/methodology/approach

A survey instrument was developed using an extensive literature review and was tested using a pilot study. It was then administered online using survey monkey to 900 respondents, out of which 324 complete responses were obtained. The data analysis was performed using exploratory factor analysis and second-order confirmatory factor analysis.

Findings

After analyzing the data, it was identified that the most critical competence was managing site safety (standard factor loading (SFL) = 0.91), followed by leadership skills (SFL = 0.88), technical competence (SFL = 0.81), managing supply chain disruption (SFL = 0.73) and financial stability (SFL = 0.48) that were found to be less essential from the respondents’ point of view.

Originality/value

The study is first of its kind to identify the core competencies that should be demonstrated by the contractors to cope with COVID-19-induced disruptions. The findings of this article can be used by the practitioners to develop policies and procedures for selection of contractors.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 June 2022

Bee Lan Oo, Benson Teck-Heng Lim and Goran Runeson

With the aim to provide a global view of factors affecting mark-up size on construction projects, this study performs a meta-analytical review of the relevant studies over the…

Abstract

Purpose

With the aim to provide a global view of factors affecting mark-up size on construction projects, this study performs a meta-analytical review of the relevant studies over the past 20 years.

Design/methodology/approach

The analytical process involved the identification and evaluation of the importance of critical factors affecting mark-up size on construction projects, and the assessment of the generalisability of findings of the meta-analysis. A random-effects model was adopted in the statistical meta-analysis.

Findings

The results show that there are 23 critical factors, and the top five factors are: (1) competitiveness of other bidders; (2) number of bidders; (3) relationship and past experience with client; (4) experience on similar project; and (5) project size. A heterogeneity test further shows that there is no statistically significant heterogeneity across the studies, reinforcing the generalisability of the findings to a global context.

Research limitations/implications

The list of critical factors from a global perspective should form a good basis for future efforts in bidding model development.

Practical implications

The research findings have practical implications to both construction clients and contractors in formulating their contracting practices and strategies.

Originality/value

This is the first meta-analysis of a sizeable collection of replicated studies on factors affecting mark-up size on construction projects in the literature.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 January 2023

Peter Sutterby, Xiangming Wang, Hong Xian Li and Yingbo Ji

Effective maintenance of construction supply chains is paramount to business continuity during the pandemic. Focusing on a large private Australian construction company, this…

1395

Abstract

Purpose

Effective maintenance of construction supply chains is paramount to business continuity during the pandemic. Focusing on a large private Australian construction company, this research aims to investigate to what extent the current pandemic has affected the daily operations of this company. This research touches on the broader effect on the industry, while it narrows the focus on how effective construction supply chain management can minimise a pandemic's negative impact on a company. The critical question will be how private contractors that primarily rely on social infrastructure projects can fortify their supply chains and general operations during the global pandemic.

Design/methodology/approach

A mixed qualitative and quantitative approach is employed in this research. Based on literature review and question design, data is collected through interviews with various stakeholders. Moreover, operation data is also collected from the case company to support the results and findings.

Findings

The respondents have generally agreed that the case company has effectively managed its supply chains to this point of the pandemic through the implementation of supply chain monitoring processes and maintaining stable relationships with stakeholders. This is supported by the operation data of the case company.

Originality/value

This is timely-conducted research, and it is original research with invaluable operation data. This case study is conducted during a pandemic and provides lessons learned for global supply chain management in the post-pandemic period.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 April 2023

Lachlan McDonald-Kerr and Gordon Boyce

The purpose of this paper is to investigate public disclosures and accountability for government decision-making in the case of a major prison project delivered through a…

Abstract

Purpose

The purpose of this paper is to investigate public disclosures and accountability for government decision-making in the case of a major prison project delivered through a Public–Private Partnership (PPP) in the State of Victoria (Australia).

Design/methodology/approach

The study explores a unique case to provide insights into public disclosures for PPPs in a jurisdiction that is a recognised leader in PPP policy and practice. The analysis is theoretically framed by an understanding of neoliberalism and New Public Management, and draws on data from case-specific reporting, media reporting and public policy, to examine interconnections between accounting, public discourse and accountability.

Findings

The analysis shows how publicly available information relating to key government decisions routinely lacked supporting evidence or explanation, even though areas of subjectivity were recognised in public policy. Accounting was deployed numerically and discursively to present potentially contestable decisions as being based on common-sense “facts”. The implied “truth” status of government reporting is problematised by media disclosure of key issues absent from government disclosures.

Social implications

Under neoliberalism, accountingisation can help depoliticise the public sphere and limit discourse by constructing ostensible “facts” in an inherently contestable arena. By contrast, democratic accountability requires public disclosures that infuse a critical dialogical public sphere.

Originality/value

The paper shows how neoliberalism can be embedded in public policies and institutional practices, and buttressed by the use of accounting. The analysis illuminates the persistence and “failing forward” character of neoliberalism, whereby crises are addressed through further neoliberalisation.

Details

Accounting, Auditing & Accountability Journal, vol. 37 no. 1
Type: Research Article
ISSN: 0951-3574

Keywords

1 – 10 of 56