Search results

1 – 8 of 8
Article
Publication date: 13 December 2022

Kejia Chen, Jintao Chen, Lixi Yang and Xiaoqian Yang

Flights are often delayed owing to emergencies. This paper proposes a cooperative slot secondary assignment (CSSA) model based on a collaborative decision-making (CDM) mechanism…

Abstract

Purpose

Flights are often delayed owing to emergencies. This paper proposes a cooperative slot secondary assignment (CSSA) model based on a collaborative decision-making (CDM) mechanism, and the operation mode of flight waves designs an improved intelligent algorithm to solve the optimal flight plan and minimize the total delay of passenger time.

Design/methodology/approach

Taking passenger delays, transfer delays and flight cancellation delays into account comprehensively, the total delay time is minimized as the objective function. The model is verified by a linear solver and compared with the first come first service (FCFS) method to prove the effectiveness of the method. An improved adaptive partheno-genetic algorithm (IAPGA) using hierarchical serial number coding was designed, combining elite and roulette strategies to find pareto solutions.

Findings

Comparing and analyzing the experimental results of various scale examples, the optimization model in this paper is greatly optimized compared to the FCFS method in terms of total delay time, and the IAPGA algorithm is better than the algorithm before in terms of solution performance and solution set quality.

Originality/value

Based on the actual situation, this paper considers the operation mode of flight waves. In addition, the flight plan solved by the model can be guaranteed in terms of feasibility and effectiveness, which can provide airlines with reasonable decision-making opinions when reassigning slot resources.

Details

International Journal of Intelligent Computing and Cybernetics, vol. 16 no. 2
Type: Research Article
ISSN: 1756-378X

Keywords

Article
Publication date: 12 September 2023

Kemal Subulan and Adil Baykasoğlu

The purpose of this study is to develop a holistic optimization model for an integrated sustainable fleet planning and closed-loop supply chain (CLSC) network design problem under…

Abstract

Purpose

The purpose of this study is to develop a holistic optimization model for an integrated sustainable fleet planning and closed-loop supply chain (CLSC) network design problem under uncertainty.

Design/methodology/approach

A novel mixed-integer programming model that is able to consider interactions between vehicle fleet planning and CLSC network design problems is first developed. Uncertainties of the product demand and return fractions of the end-of-life products are handled by a chance-constrained stochastic program. Several Pareto optimal solutions are generated for the conflicting sustainability objectives via compromise and fuzzy goal programming (FGP) approaches.

Findings

The proposed model is tested on a real-life lead/acid battery recovery system. By using the proposed model, sustainable fleet plans that provide a smaller fleet size, fewer empty vehicle repositions, minimal CO2 emissions, maximal vehicle safety ratings and minimal injury/illness incidence rate of transport accidents are generated. Furthermore, an environmentally and socially conscious CLSC network with maximal job creation in the less developed regions, minimal lost days resulting from the work's damages during manufacturing/recycling operations and maximal collection/recovery of end-of-life products is also designed.

Originality/value

Unlike the classical network design models, vehicle fleet planning decisions such as fleet sizing/composition, fleet assignment, vehicle inventory control, empty repositioning, etc. are also considered while designing a sustainable CLSC network. In addition to sustainability indicators in the network design, sustainability factors in fleet management are also handled. To the best of the authors' knowledge, there is no similar paper in the literature that proposes such a holistic optimization model for integrated sustainable fleet planning and CLSC network design.

Article
Publication date: 8 February 2023

Md Tanweer Ahmad, Mohammad Firouz and Nishit Kumar Srivastava

Increasing scarcity of natural resources and the adverse effects of unsustainable practices call for more and more efficient management strategies in the energy industry. The…

136

Abstract

Purpose

Increasing scarcity of natural resources and the adverse effects of unsustainable practices call for more and more efficient management strategies in the energy industry. The quality of the coke plays a significant role in the quality and durability of the output steel which is produced using the energy from the coal. This paper aims to investigate the dynamic coal blending problem under overall cost and coke quality constraints in the steel industry within a periodic cycle of operations.

Design/methodology/approach

Considering the variability of the natural properties over a periodic cycle, this study proposes a multi-period mixed-integer non-linear programming formulation to optimize the total blending costs while taking various coke quality constraints into account. Besides, this study applies factorial design to investigate about the significant effect of coal proportions as well as improvement into the overall cost of blending.

Findings

In this case study, utilizing real data from a coal blending facility in India, through a factorial design, the authors obtain optimal desirable levels of coal proportions and their criticality levels towards the total cost of blending (TCB) or objective function. This analysis reflects the role of the coke quality constraints in the objective function value while characterizing the price of sustainability for the case study among other critical insights.

Originality/value

Objective function (or TCB) includes basic coal cost, movement cost and environmental costs during the coal and coke processing at a coke-oven and blast furnace of steel industry. The price of sustainability provides managerial insights on that sacrifices the industry has to make in order to become more “sustainable”.

Details

International Journal of Quality & Reliability Management, vol. 40 no. 9
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 26 April 2022

Yizhong Chen, Taozhi Zhuang and Guiwen Liu

The aims of this paper is to establish an appropriate physical-change-based renewal (PCBR) projects selection mechanism capable of selecting the combination of the PCBR projects…

Abstract

Purpose

The aims of this paper is to establish an appropriate physical-change-based renewal (PCBR) projects selection mechanism capable of selecting the combination of the PCBR projects that can make up an integrated urban renewal program in high-density cities.

Design/methodology/approach

The research design follows a sequential integrated methodology that combines the calculation algorithms of Fuzzy Analytic Network Process (Fuzzy-ANP) with Zero-One Goal Programming (ZOGP) to support decisions for the selection of PCBR projects. In the first phase, general criteria for assessing the sustainability performance of PCBR projects were collected from relevant literature. In the second phase, the Fuzzy-ANP was used to identify the priority weights of the candidate projects through clarifying the interdependent degree between the criteria and candidate projects. Finally, ZOGP method was selected as a predetermined number of PCBR projects among candidate projects.

Findings

The feasibility and effectiveness of this hybrid approach is then verified in a case study of Yuzhong District, Chongqing in China. The results of this study indicate that the integrated method is capable of directing the decision maker toward the best compromising solution of PCBR program that can achieve the maximization of sustainable benefits and allocate limited resources most efficiently.

Originality/value

The novelty of this paper consists in combining the algorithms of the Fuzzy-ANP method with those of the ZOGP model that serves as an effective analysis tool to address practical decision problems. This is the first hybrid algorithms to make PCBR projects selection decision that reach the maximization of the sustainable benefits, both in economic and socio-environmental terms.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2022

Roya Amiri, Javad Majrouhi Sardroud and Vahid Momenaei Kermani

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary…

Abstract

Purpose

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary facilities such as tower cranes and areas on the jobsite for materials storage. This study proposes an approach to optimizing the type and location of the tower crane and material supply point on construction sites.

Design/methodology/approach

The problem is formulated into an integer linear programming (ILP) model considering the total cost of material transportation as the objective function and site conditions as constraints. The efficacy of the approach is demonstrated by finding the optimum site layout for a numerical example. The proposed model is validated and verified using two methods.

Findings

Results indicate that the proposed model successfully identifies the type and location of the tower crane and the location of material supply point, leading to approximately 20% cost reduction compared with when such features of a site layout are decided solely based on experience and educated guesses of the construction manager.

Originality/value

The primary contribution of this study is to present a modified linear mathematical model for site layout optimization that exhibits improved performance compared with previous models. The type and location of the tower crane and the material supply point as decision variables are extracted directly from solving the proposed model. The proposed model will help enhance time and cost efficiency on construction sites.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 February 2023

Gokhan Agac, Birdogan Baki and Ilker Murat Ar

The purpose of this study is to systematically review the existing literature on the blood supply chain (BSC) from a network design perspective and highlight the research gaps in…

Abstract

Purpose

The purpose of this study is to systematically review the existing literature on the blood supply chain (BSC) from a network design perspective and highlight the research gaps in this area. Moreover, it also aims to pinpoint new research opportunities based on the recent innovative technologies for the BSC network design.

Design/methodology/approach

The study gives a comprehensive systematic review of the BSC network design studies until October 2021. This review was carried out in accordance with preferred reporting items for systematic reviews and meta-analyses (PRISMA). In the literature review, a total of 87 studies were analyzed under six main categories as model structure, application model, solution approach, problem type, the parties of the supply chain and innovative technologies.

Findings

The results of the study present the researchers’ tendencies and preferences when designing their BSC network models.

Research limitations/implications

The study presents a guide for researchers and practitioners on BSC from the point of view of network design and encourages adopting innovative technologies in their BSC network designs.

Originality/value

The study provides a comprehensive systematic review of related studies from the BSC network design perspective and explores research gaps in the collection and distribution processes. Furthermore, it addresses innovative research opportunities by using innovative technologies in the area of BSC network design.

Details

Journal of Modelling in Management, vol. 19 no. 1
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 22 February 2024

Zoubida Chorfi

As supply chain excellence matters, designing an appropriate health-care supply chain is a great consideration to the health-care providers worldwide. Therefore, the purpose of…

Abstract

Purpose

As supply chain excellence matters, designing an appropriate health-care supply chain is a great consideration to the health-care providers worldwide. Therefore, the purpose of this paper is to benchmark several potential health-care supply chains to design an efficient and effective one in the presence of mixed data.

Design/methodology/approach

To achieve this objective, this research illustrates a hybrid algorithm based on data envelopment analysis (DEA) and goal programming (GP) for designing real-world health-care supply chains with mixed data. A DEA model along with a data aggregation is suggested to evaluate the performance of several potential configurations of the health-care supply chains. As part of the proposed approach, a GP model is conducted for dimensioning the supply chains under assessment by finding the level of the original variables (inputs and outputs) that characterize these supply chains.

Findings

This paper presents an algorithm for modeling health-care supply chains exclusively designed to handle crisp and interval data simultaneously.

Research limitations/implications

The outcome of this study will assist the health-care decision-makers in comparing their supply chains against peers and dimensioning their resources to achieve a given level of productions.

Practical implications

A real application to design a real-life pharmaceutical supply chain for the public ministry of health in Morocco is given to support the usefulness of the proposed algorithm.

Originality/value

The novelty of this paper comes from the development of a hybrid approach based on DEA and GP to design an appropriate real-life health-care supply chain in the presence of mixed data. This approach definitely contributes to assist health-care decision-makers design an efficient and effective supply chain in today’s competitive word.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 27 December 2022

Satya Prakash and Indrajit Mukherjee

This study primarily aims to develop and solve an enhanced optimisation model for an assembly product multi-period inbound inventory routing problem (IRP). The many-to-one…

Abstract

Purpose

This study primarily aims to develop and solve an enhanced optimisation model for an assembly product multi-period inbound inventory routing problem (IRP). The many-to-one (inbound) model considers the bill of materials (BOM), supply failure risks (SFR) and customer demand uncertainty. The secondary objective is to study the influence of potential time-dependent model variables on the overall supply network costs based on a full factorial design of experiments (DOE).

Design/methodology/approach

A five-step solution approach is proposed to derive the optimal inventory levels, best sourcing strategy and vehicle route plans for a multi-period discrete manufacturing product assembly IRP. The proposed approach considers an optimal risk mitigation strategy by considering less risk-prone suppliers to deliver the required components in a specific period. A mixed-integer linear programming formulation was solved to derive the optimal supply network costs.

Findings

The simulation results indicate that lower demand variation, lower component price and higher supply capacity can provide superior cost performance for an inbound supply network. The results also demonstrate that increasing supply capacity does not necessarily decrease product shortages. However, when demand variation is high, product shortages are reduced at the expense of the supply network cost.

Research limitations/implications

A two-echelon supply network for a single assembled discrete product with homogeneous vehicle fleet availability was considered in this study.

Originality/value

The proposed multi-period inbound IRP model considers realistic SFR, customer demand uncertainties and product assembly requirements based on a specific BOM. The mathematical model includes various practical aspects, such as supply capacity constraints, supplier management costs and target service-level requirements. A sensitivity analysis based on a full factorial DOE provides new insights that can aid practitioners in real-life decision-making.

Details

Journal of Modelling in Management, vol. 18 no. 6
Type: Research Article
ISSN: 1746-5664

Keywords

1 – 8 of 8