Article
Publication date: 21 August 2019

X.K. Li, X.M. Wang and L. Lei

The purpose of this paper is to propose a method for assessing the lean construction management performance (LCMP) of engineering projects using the analytic network process-fuzzy…

1349

Abstract

Purpose

The purpose of this paper is to propose a method for assessing the lean construction management performance (LCMP) of engineering projects using the analytic network process-fuzzy comprehensive evaluation (ANP-FCE) model.

Design/methodology/approach

Literature review and questionnaire surveys were used to achieve an evaluation index system for LCMP. The data needed to calculate the weights of the indices were derived from questionnaire surveys. The ANP and the Super Decisions (SD) software were used to calculate the weights of the indices and verify the validity of the weights. The FCE was adopted to carry out a comprehensive evaluation of LCMP, and the validity of the evaluation results was verified by applying the validity degree of maximum membership principle. The applicability of the method for evaluating LCMP was validated by empirical research.

Findings

The proposed method for assessing the LCMP using the ANP-FCE model is validated to be feasible. Decision makers can easily identify the strengths and weaknesses of lean construction (LC) management of the evaluated project from the evaluation results.

Research limitations/implications

Some subjectivity may exist in the assessment process due to questionnaire surveys, and only one case has been studied to validate the applicability of the method. Therefore, researchers are encouraged to increase the number of LC experts and cases over the world to make the proposed method more standard.

Practical implications

The research is expected to propose an assessment method of LCMP for construction enterprises, provide a reference to develop assessment standards for LCMP for building associations or governments and help decision makers know the improving path of LC management.

Originality/value

This research contributes to the literature by summarizing the commonly used lean management tools for quality, cost, time, safety and organization in practice, and proposing a novel approach for assessing the LCMP of engineering projects. The study is useful for researchers, project managers and decision makers engaged in LC.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 July 2021

Phuoc Luong Le and Nguyen Thi Duc Nguyen

To deal with the present situation and recover after the COVID-19 pandemic, construction firms are required to recognise the trends in construction supply chain management (CSCM…

1261

Abstract

Purpose

To deal with the present situation and recover after the COVID-19 pandemic, construction firms are required to recognise the trends in construction supply chain management (CSCM) for the upcoming years and determine the appropriate practices towards the trends for the improvement of construction activities in terms of strategy, tactic and operations. This paper aims to recognise key trends in CSCM and uses these trends as strategic criteria for the evaluation and prioritisation of lean construction (LC) tools at different project phases including design and architectural engineering, planning and control, on-site construction and safety management.

Design/methodology/approach

The integrated analytic hierarchy process–Delphi method is used to collect and analyse the data from construction experts to evaluate the importance levels of the CSCM trends and recommend the appropriate tools for LC practices to improve project performances.

Findings

Seven key CSCM trends are identified: lean supply chain management (SCM), supply chain (SC) integration, SC standardisation, SC problem-solving, SC information-sharing, SC flexibility and SC sustainability. Based on these trends, a set of prioritised lean tools are suggested for LC practices, in which “virtual design construction” (VDC) and “last planner system” are considered as the central tools. These two LC practices can be integrated with other effective tools to support the strategic, tactical and operational targets in construction supply chain (CSC) projects.

Research limitations/implications

This study gives the managerial implications by developing an application framework of LC practices for CSC projects. The framework promotes “VDC” as a strategic tool for the phase of design and architectural engineering and considers “last planner system” as the central LC practice for the phase of project planning and control. The framework also focuses on the improvement of efficiency in construction operations by taking into account the aspects of on-site collaboration, problem-solving, improvement and safety.

Originality/value

Up to date, there is still a lack of researches in classifying and prioritising the significant LC tools for each project phase to deal with CSC issues in both breadth and depth. Thus, this study is performed to provide construction managers with the awareness of CSCM trends on which they can focus to have strategic criteria for selecting LC practices to improve CSC performances.

Details

International Journal of Lean Six Sigma, vol. 13 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 6 November 2017

Bankole Awuzie and Fidelis Emuze

This study aims to review the zeal exhibited by universities in South Africa towards aligning institutional mandates of teaching, learning, research and community engagement to…

1111

Abstract

Purpose

This study aims to review the zeal exhibited by universities in South Africa towards aligning institutional mandates of teaching, learning, research and community engagement to the sustainable development (SD) agenda. The implementation of the SD agenda across higher education institutions (HEIs) continues to draw attention from the wider society. This is because HEIs are increasingly being looked up to for leadership in this regard. However, although several studies are quick to identify various factors which have driven the adoption of sustainable practices in HEIs, the paucity of studies seeking to identify the drivers for SD implementation remains glaring. This is particularly so in developing countries like South Africa.

Design/methodology/approach

To confirm the exploratory data from desktop study on public university engagement with sustainability in South Africa, a single case study was conducted in the Central University of Technology (CUT). The single case study design adopted semi-structured interviews and document reviews as data collection techniques. Purposive snowballing sampling technique was strictly adhered to in the selection of interviewees. Interviewees were selected on the basis of their roles in the implementation of the CUT’s sustainability agenda.

Findings

Data emanating from these interviews were analysed thematically using qualitative content analysis. Although a plethora of drivers were identified, there appeared to be a consensus between most of the interviewees that the quest for cost reduction remained the most significant driver for the viable implementation of the sustainability agenda at CUT.

Research limitations/implications

It is expected that findings from this study would provide a platform for the development of effective implementation strategies in South African HEIs. Also, the findings contribute to filing the extant gap observed concerning implementation and drivers for engendering SD implementation in HEIs in sub-Saharan Africa (SSA) region.

Practical implications

By highlighting the drivers for SD implementation, this study contributes to the development of a more receptive social ontology among various stakeholders in an HEI towards the agenda, particularly within the SSA context where there is low level of awareness and buy-in by these stakeholders.

Originality/value

This study makes an original contribution to the research base of SD in HEIs and implementation.

Details

International Journal of Sustainability in Higher Education, vol. 18 no. 7
Type: Research Article
ISSN: 1467-6370

Keywords

Article
Publication date: 18 March 2022

Xiaoming Wang, Nanjun He and Xiaokang Li

Anti-epidemic Emergency Projects (AEEPs) have unique characteristics such as a short construction period, high-quality requirements, complex construction environment, many…

Abstract

Purpose

Anti-epidemic Emergency Projects (AEEPs) have unique characteristics such as a short construction period, high-quality requirements, complex construction environment, many construction participants and many uncertain affecting factors. The purpose of this paper was to propose the establishment method for the Construction Community (CC) of AEEPs (CC-AEEPs) by analyzing the management features of AEEPs, to establish the method of the Social Network Analysis (SNA) for CC-AEEPs, and to apply this method and the framework to Wuhan Huoshenshan Hospital for their verification.

Design/methodology/approach

According to the CC theory, this paper explored the member composition and the establishment method for CC-AEEPs. The optimal management factors of CC-AEEPs were proposed by combining the management features of AEEPs and the SNA method for CC-AEEPs was further established. Finally, the applicability of the method was verified through a case study, and some countermeasures for the CC-AEEP social networks were proposed.

Findings

The establishment of CC-AEEPs is an important guarantee to complete AEEPs with top speed and high quality. Ten types of CC-AEEP members all played different but irreplaceable roles in cooperative construction, among which the Government, the Contractor, and the Supervisor had outstanding performances. The SNA method could effectively analyze the complexity and cooperative relationship among the members in four aspects. The case study of Huoshenshan Hospital validated the important role of CC-AEEP and its social network in the AEEP research providing beneficial enlightenment for the cooperative optimization path of the AEEP construction participants.

Originality/value

The new establishment method for CC-AEEPs was proposed from the perspective of “cooperation among human, society, and engineering” according to the theories of the engineering sociology and the CC. In this paper, the SNA method was applied to the research on the AEEP construction for the first time and the SNA method for CC-AEEPs was purposed. The optimal management factors of CC-AEEPs and the expansion path of the CC-AEEP social networks were proposed according to the whole-process tracking of AEEPs in Wuhan.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 February 2024

Sara S. Badran and Ayman Bahjat Abdallah

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in…

Abstract

Purpose

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in Jordan. This study focuses on six key project performance outcomes, namely cost, time, quality, client satisfaction, innovation and responsiveness.

Design/methodology/approach

The present study employed a quantitative approach to achieve the research objectives. Accordingly, a multi-item survey questionnaire was prepared to gather data from 392 project managers from construction companies in Jordan. The study’s model showed acceptable levels regarding reliability, validity, fit indices and discriminant validity. In order to test the hypotheses of this study, path analysis was employed using Amos 24.0 software.

Findings

LPM demonstrated a remarkably high positive impact on cost performance. It also positively affected quality performance and client satisfaction. However, LPM insignificantly affected time, innovation and responsiveness performance measures. On the other hand, APM showed a notably high positive impact on innovation and responsiveness. The findings also revealed that APM positively impacted quality performance and client satisfaction. In addition, APM negatively impacted cost performance and insignificantly impacted time performance.

Originality/value

This study is one of the first comprehensive studies to empirically examine the impact of both LPM and APM on various project performance outcomes in the construction industry in the context of a developing country. It reveals some similarities and differences between LPM and APM with regard to their impacts on project management outcomes. The findings are expected to guide managers in selecting the appropriate project management approach based on the desired performance outcomes. Accordingly, it offers important implications for project managers in construction companies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The…

Abstract

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The analysis from the literature revealed that the implementation of SCM in the construction industry enhances the industry's value in terms of cost-saving, time savings, material management, risk management and others. The construction supply chain (CSC) can be managed using the pull or push system. This chapter also discusses the origin and proliferation of SCM into the construction industry. The chapter revealed that the concept of SCM has passed through five different eras: the creation era, the use of ERP, globalisation stage, specialisation stage and electronic stage. The findings from the literature revealed that we are presently in the fourth industrial revolution (4IR) era. At this stage, the SCM witnesses the adoption of technologies and principles driven by the 4IR. This chapter also revealed that the practice of SCM in the construction industry is centred around integration, collaboration, communication and the structure of the supply chain (SC). The forms and challenges hindering the adoption of these practices were also discussed extensively in this chapter.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The prevalent practice of construction supply chain (CSC) in developing countries with a focus on Africa was presented in this chapter. Two African countries (South Africa and…

Abstract

The prevalent practice of construction supply chain (CSC) in developing countries with a focus on Africa was presented in this chapter. Two African countries (South Africa and Ghana) were selected due to the extensive literature on the CSC emanating from the countries. The impediment to the effective management of the CSC in the two African countries was also examined in this chapter. It was discovered that the vital inhibition to the performance of CSC in developing countries is the adoption of culture from developed countries without a proper model for ensuring its implementation in developing countries. Also, no model has incorporated the principles and technologies of the fourth industrial revolution (4IR) to manage the CSC. The failure to adopt the 4IR technologies like block chain, big data and the internet of things has prevented the proper application of CSC practices in developing countries. CSC practices like collaboration, integration, lean supply chain, information sharing, financial management and communication are the primary practice in developing countries. Finally, this chapter called for the development of a model for managing the CSC in developing countries in alignment with the principles of the 4IR.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Article
Publication date: 13 October 2021

Tirivavi Moyo and Benviolent Chigara

Increased waste during projects execution has led to time and cost overruns within the Zimbabwean construction projects industry. However, contextual barriers to lean construction

Abstract

Purpose

Increased waste during projects execution has led to time and cost overruns within the Zimbabwean construction projects industry. However, contextual barriers to lean construction implementation are yet to be established for derivation of effective remedies. The purpose of this paper is to report on a study that sought to determine barriers to lean construction implementation and assess the existence of statistically significant differences because of gender, designation and educational levels of respondents.

Design/methodology/approach

A questionnaire survey was administered on construction professionals for the collection of quantitative data. Factor analysis was used to reveal interrelated significant sets of barriers to lean construction implementation. Non-parametric statistical methods were also used to determine significant differences because of demographic variables.

Findings

Integration- and performance-related, human capital management–related, quality management–related barriers were determined as the highest-ranked of the nine significant components. Significant differences because of gender, designation and educational levels were non-existent for aggregated barriers, generally indicating consensus on the barriers. However, individual barriers showed inadequacies in management requirements for lean construction implementation from architects and those with diplomas and degrees.

Research limitations/implications

The determination of barriers establishes the knowledge for construction policy evaluation for enhanced performance of the construction industry. However, because of the exploratory nature of this study, the insights of clients were not considered.

Originality/value

Context-specific barriers to lean construction implementation were determined for consequent construction policy improvements in the construction industry.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 13 September 2019

Shakil Ahmed and Md Habibur Rahman Sobuz

Construction management is ameliorated by the lean construction concept in many direct and indirect ways to reduce waste of construction process and improve the value. The purpose…

1413

Abstract

Purpose

Construction management is ameliorated by the lean construction concept in many direct and indirect ways to reduce waste of construction process and improve the value. The purpose of this paper is to identify the challenges of the implementation of lean construction in the Bangladeshi construction industry and to prioritize these factors that constitute these challenges.

Design/methodology/approach

A comprehensive literature review was used for shorting the global challenges of implementing lean construction. Subsequently, these challenges were incorporated into a structured questionnaire for survey. A total of 164 valid responses were collected from Bangladeshi construction practitioners involved in different types of construction organizations. The results were analyzed using the Relative Important Index (RII) and Mann–Whitney U test.

Findings

The findings revealed 41 challenges of lean construction implementation in the Bangladeshi construction industry. The highest ranking challenges are the lack of awareness about lean construction, lack of skills, training and lean techniques, unwillingness to change the existing culture, lack of management commitment, fragmented and cyclic nature of the construction project and unavailing communication between all project participants. The study also discusses some universally applicable solutions to overcome these challenges.

Originality/value

By the findings of this study, the Bangladeshi construction industry could get a new insight into the challenges of implementing lean construction. It could play a very important part in the body of knowledge, as it reveals the challenges of implementing lean construction for the first time with the socio-economic context of Bangladesh. Exploring the findings, the study could help the stakeholders, companies, academician, researchers and government to focus their effort and resources on the significantly appropriate issues. Furthermore, this study may beneficial to those developing countries especially in South Asia, who have shared the same socio-economic status with Bangladesh.

Details

Smart and Sustainable Built Environment, vol. 9 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 30 July 2020

Mohamed Saad Bajjou and Anas Chafi

This research seeks to evaluate the impact of applying lean construction principles on the performance of reinforcement operations using a discrete-event simulation (DES) approach.

1317

Abstract

Purpose

This research seeks to evaluate the impact of applying lean construction principles on the performance of reinforcement operations using a discrete-event simulation (DES) approach.

Design/methodology/approach

Process mapping of reinforcements operations was first established through field observation and interviews with construction managers involved in the selected project. Subsequently, quantitative data were gathered and then used to identify the best probabilistic density functions for each activity duration based on the fit-quality tests. Upon testing the validity of the real-world model, a lean simulation model was developed, using ARENA software, to investigate the impact of lean construction principles on the performance of such processes.

Findings

Lean principles are effective in enhancing the performance of the selected construction process. Output performance measurements for real-world model and lean model revealed that lean construction principles led to 41% improvement in process productivity, 14% enhancement in process efficiency and 17% reduction in cycle time.

Research limitations/implications

The statistical findings only represent the process under study (reinforcement process) and cannot be generalized to other construction activities. In order to draw generalizable conclusions, future works are needed to extend this study to different project sizes and more complex construction processes (e.g. bricklaying process and concrete pouring operations). Moreover, there are other factors such as labor skills, rework and uncertainty, site conditions that require further analyses for leaner construction projects.

Originality/value

The methodology and the techniques presented in this work can be used for decision making by analyzing various lean construction scenarios and evaluating their impacts on performance outcomes of any construction process prior to real-world implementation.

Details

International Journal of Productivity and Performance Management, vol. 70 no. 2
Type: Research Article
ISSN: 1741-0401

Keywords