Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79142

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 26 May 2023

Sina Moradi and Piia Sormunen

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…

2460

Abstract

Purpose

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.

Design/methodology/approach

A systematic literature review was conducted to fulfill the purpose of this study.

Findings

The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.

Originality/value

The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 27 September 2021

Monique Rieger Rodrigues and Søren Munch Lindhard

The traditional construction delivery method is challenged by low trust and collaboration issues, resulting in increased project costs. The integrated project delivery (IPD…

5570

Abstract

Purpose

The traditional construction delivery method is challenged by low trust and collaboration issues, resulting in increased project costs. The integrated project delivery (IPD) method is developed, through a contractual agreement, to overcome these challenges by creating a common set of terms, expectations and project goals.

Design/methodology/approach

A singular construction case was followed during a four-month period. Data collection consisted of contract documents and a series of semi-structured interviews with representatives from the owner, design-group and contractors.

Findings

The IPD contract was found to have a number of positive effects; it improved project behavior (e.g. trust, collaboration and communication), increased ownership among project participants and improved buildability of the design, leading to fewer surprises and interruptions in the construction phase. The study also revealed a number of challenges including contractual and legal challenges and involving too many participants in the early phases. Moreover, co-location was identified as a particular important supporting element, to build relations and improve collaboration.

Originality/value

This research identified lessons learned from the application, as well as initial barriers and persistent barriers for implementing IPD. To improve IPD application the top three lessons were as follows: 1) the contractual documents should be adapted and signed at an early stage as this increases financial transparency, 2) cost estimates should be carried as an iterative process and project main concept be freezed at an early stage to increase understanding and minimize risks, 3) only the most important project developers should be involved in the early phases, to avoid going into detailed design issues before the main concept is completed.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 2 August 2022

Sina Moradi and Kalle Kähkönen

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have…

1851

Abstract

Purpose

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have addressed success factors of various collaborative delivery models (e.g. alliance and partnering). However, there is currently very limited research-based knowledge concerning core success factors for different collaborative delivery models, exploring the commonalities. Thus, this study aims to conceptualize a success model for collaborative construction projects by identifying and structuring their core success factors through the lens of project delivery elements.

Design/methodology/approach

A systematic literature review was conducted, and thematic as well as content analysis of the relevant studies led to the identification of mentioned success factors in the literature for different collaborative delivery models. Then, those common success factors were structured in a model based on factors' relation to project delivery elements.

Findings

The obtained results present eight core success factors (e.g. equality, mutual trust and commitment to win–win philosophy) for collaborative construction projects, structured in a model based on their contribution toward project organization, contractual relationships, and operational system in construction project delivery. Moreover, the differences between success factors for traditional and collaborative construction projects are discussed.

Originality/value

This study's findings provide insightful theoretical contributions on collaborative construction project success and providing a departure point for future studies based on the discussed differences between success factors of collaborative and traditional construction projects. The findings can be also practically insightful for the project professionals in collaborative construction projects to succeed in managing project organization, contractual relationships, and operational system.

Details

Built Environment Project and Asset Management, vol. 12 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 10 August 2018

Denise Ann Brady, Patricia Tzortzopoulos, John Rooke, Carlos Torres Formoso and Algan Tezel

The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a…

8142

Abstract

Purpose

The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a systematic way to the planning and control process. The application of the visual tools in this way facilitates the flow of information, thus improving transparency between the interfaces of planning, execution and control.

Design/methodology/approach

Design Science research is adopted for this investigation, which analyses the original development of the model and reports on its testing and refinement over different types of projects. The research is divided into three parts, each part focussing on a different stage of development and construction project type.

Findings

The main findings are related to the benefits of visual management in the construction planning and control process, such as maintaining consistency between different planning levels, so that feasible execution plans are created; control becomes more focussed on prevention rather than correction, and creates opportunities for collaborative problem solving. Moreover, the physical display of the visual tools in a discrete planning area on-site encourages a regular exchange between participants on actual work progress as it unfolds, leading to more timely reaction to the problems at hand.

Originality/value

The problem of a lack of transparency in construction planning and control leads to communication issues on-site, poor process orientation and high levels of waste. LCM improves process transparency by making information related to system-wide processes more readily available to project participants. This enables them to foresee problems in a timely manner and to take necessary measures to resolve them or to adapt the process to current circumstances. The LCM model proposes a new way of applying visual tools and controls systematically to improve transparency in construction planning and control.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 28 April 2020

Rita Lavikka, Olli Seppänen, Antti Peltokorpi and Joonas Lehtovaara

University research efforts have not been effective in developing lasting impacts on operations management in construction because of inadequate coordination between academia and…

4444

Abstract

Purpose

University research efforts have not been effective in developing lasting impacts on operations management in construction because of inadequate coordination between academia and industry. This study aims to describe the development of an industry–university (IU) relationship which has enabled the conduct of practically and scientifically relevant research.

Design/methodology/approach

Design science research was carried out between 2016 and 2019 to build a consortium between a university and 17 design, construction, technology and logistics companies for enabling process innovations in construction. The consortium conducted industry-funded research on various topics, such as takt production, lean design management, prefabrication, measurement of waste and business models supported by digitalisation. The academic and practical impacts of the consortium’s research projects were investigated through a survey and in-depth company interviews.

Findings

The paper presents a conceptual model for creating an IU relationship to support scientifically and practically relevant research. The model includes network architects who mobilised consortium development and a joint governance body that developed a shared long-term vision and selected research topics based on this vision. The results show that using the model’s approach, the consortium selected research topics that have led to both academic publications and process innovations in construction.

Originality/value

Using empirical data, this study describes how to create a win-win IU innovation relationship that enables the implementation of process innovations into the construction sector and, at the same time, the conduct of scientific research in construction management.

Details

Construction Innovation , vol. 20 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 24 November 2022

Eleni Papadonikolaki, Algan Tezel, Ibrahim Yitmen and Per Hilletofth

Rapid advancements in blockchain technology transform various sectors, attracting the attention of industrialists, practitioners, policymakers and academics, and profoundly affect…

1974

Abstract

Purpose

Rapid advancements in blockchain technology transform various sectors, attracting the attention of industrialists, practitioners, policymakers and academics, and profoundly affect construction businesses through smart contracts and crypto-economics. This paper explores the blockchain innovation ecosystem in construction.

Design/methodology/approach

Through a qualitative study of 23 diverse interviewees, the study explores how open or closed the blockchain innovation ecosystem in construction is and who its emerging orchestrators are.

Findings

The data showed that construction aims towards an open innovation blockchain ecosystem, although there are elements of hybridisation and closedness, each system pointing out to different orchestrators.

Practical implications

The study has implications for governments and large companies in construction, showing that open innovation initiatives need to be encouraged by policymakers through rules, regulations and government-sponsored demonstrator projects.

Social implications

The data showed that there is lack of readiness for business model change to support open innovation blockchain ecosystems in construction.

Originality/value

This is the first study applying the open innovation theory in the construction industry and sheds light into the phenomenon of blockchain, suggesting routes for further democratisation of the technology for policymakers and practitioners.

Details

Industrial Management & Data Systems, vol. 123 no. 2
Type: Research Article
ISSN: 0263-5577

Keywords

Open Access
Article
Publication date: 11 May 2017

Rizwana Shaheen Hussain, Kirti Ruikar, Marcus P. Enoch, Nigel Brien and David Gartside

Diminishing local government budgets and the need to reduce highway works activities necessitate cost effective and efficient processes. The purpose of this paper is to…

6334

Abstract

Purpose

Diminishing local government budgets and the need to reduce highway works activities necessitate cost effective and efficient processes. The purpose of this paper is to investigate streamlining road works administrative processes to enhance coordinated working at Derby City Council.

Design/methodology/approach

Case study research of a local authority was undertaken using business process mapping. Specifically, Swimlane analysis enabled re-engineering of business processes from design stage, to works permit issuance. Process improvement recommendations were validated by nine industry experts through a focus group and semi-structured interviews. A logic map was developed for transferability to other councils, identifying key attributes for a successful administrative road works management process.

Findings

Research revealed inherent silo working and processes built around fragmented IT systems creating process inefficiency. Validation found numerous practices and management styles were culturally embedded and common across councils. Peer reviewed recommendations are made to improve working practices, including improving IT systems, removing process bottlenecks, and training staff.

Research limitations/implications

Whilst road works management policy is generally under-researched, its strategic and negative impacts are widely acknowledged. This study highlights the day-to-day operational problems which are interconnected to the strategic impact, bridging an important gap in knowledge, as well as adding to business process re-engineering literature.

Originality/value

The research adds to a limited body of road works management policy research, and also presents a high-level logic map for councils to adopt as appropriate.

Details

Built Environment Project and Asset Management, vol. 7 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 13 August 2021

Juliana Parise Baldauf, Carlos Torres Formoso and Patricia Tzortzopoulos

This paper proposes a method for managing client requirements with the use of Building Information Modelling (BIM). The development of healthcare projects demands a large amount…

2428

Abstract

Purpose

This paper proposes a method for managing client requirements with the use of Building Information Modelling (BIM). The development of healthcare projects demands a large amount of requirements information, in order to deal with a diversity of clients and frequents changes in healthcare services. The proposed method supports healthcare design by adopting a process-based approach for client requirements management, with the aim of improving value generation.

Design/methodology/approach

Design Science Research was the methodological approach adopted in this investigation. The main outcome of this study emerged from an empirical study carried out in a healthcare project in Brazil.

Findings

The proposed method involves three stages: (1) capturing and processing requirements; (2) product and requirements modelling, which involves the connection between requirements and the BIM 3-D model and (3) supporting design solution refinement, through the communication of requirements and the assessment of design in relation to updated client requirements information.

Originality/value

This study explores client requirements management from a process perspective, proposing activities and their interdependences and possible sources of data, including healthcare services information. The main theoretical contributions are related to the understanding of the nature and complexity of the information involved in client requirements management, and how this can be modelled.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 24 September 2020

Guido Noto and Federico Cosenz

Lean Thinking is an operation management discipline which aims to identify, map and analyse the activities forming a process to detect “value waste” and outline the most effective…

4030

Abstract

Purpose

Lean Thinking is an operation management discipline which aims to identify, map and analyse the activities forming a process to detect “value waste” and outline the most effective flow of activities to execute in sequence. Process mapping is often developed in lean projects through the use of the Value Stream Map (VSM). Like many other management tools, the VSM adopts a static and non-systemic perspective in the representation of an organizational process. This may result in the implementation of Lean projects inconsistent with the overall organizational long-term strategy, thus leading to dysfunctional performance. In order to overcome this limit, the paper suggests combining VSM with System Dynamics (SD) modelling.

Design/methodology/approach

The paper is based on a review of the literature on VSM. This review is matched with an analysis of SD modelling principles aimed at explaining the practical and theoretical contribution of this approach to operation and strategic management practices. An illustrative case study is then provided to explore the practical implications of the proposed approach.

Findings

Our results show that SD modelling provides robust methodological support to VSM and Lean Thinking due to its inner characteristics, namely: simulation, systemic view, explicit link between system structure and behaviour and effective visual representation.

Originality/value

This research proposes a novel approach to design VSMs aimed at fostering a strategic perspective in Lean Thinking applications. Such an approach connects two fields of research and practice – i.e. VSM and SD modelling – which have traditionally been kept separated or, at least, partially combined for specific organizational sub-systems, thereby neglecting a broader strategic view of the entire process system.