Search results

1 – 10 of 42
Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79142

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 31 October 2023

Emilia Kääriä and Ahm Shamsuzzoha

This study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the…

1001

Abstract

Purpose

This study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the most visible process to the customer, and therefore, its punctual and fluent order management is vital. It is observed that the high degree of manual work in the O2C process causes mistakes, delays and rework in the process. The purpose of this article is therefore to analyze the case company's current state of the O2C process as well as to identify the areas of development in this process by deploying the means of Lean Six Sigma tools such as value stream mapping (VSM).

Design/methodology/approach

The study was conducted as a mix of quantitative and qualitative analysis. Based on both the quantitative and qualitative data, a workshop on VSM was organized to analyze the current state of the O2C process of a case company, engaged in the energy and environment sector in Finland.

Findings

The results found that excessive manual work was highly connected to inadequate or incorrect data in pricing and invoicing activities, which resulted in canceled invoices. Canceled invoices are visible to the customer and have a negative impact on the customer experience. This study found that by improving the performance of the O2C process activities and improving communication among the internal and external stakeholders, the whole O2C process can perform more effectively and provide better customer value.

Originality/value

The O2C process is the most visible process to the customer and therefore its punctual and fluent order management is vital. To ensure that the O2C process is operating as desired, suitable process performance metrics need to be aligned and followed. The results gathered from the case company's data, questionnaire interviews, and the VSM workshop are all highlighted in this study. The main practical and managerial implications were to understand the real-time O2C process performance, which is necessary to ensure strong performance and enhance continuous improvement of the O2C process that leads to operational excellence and commercial competitiveness of the studied case company.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 22 March 2024

Sheak Salman, Shah Murtoza Morshed, Md. Rezaul Karim, Rafat Rahman, Sadia Hasanat and Afia Ahsan

The imperative to conserve resources and minimize operational expenses has spurred a notable increase in the adoption of lean manufacturing within the context of the circular…

Abstract

Purpose

The imperative to conserve resources and minimize operational expenses has spurred a notable increase in the adoption of lean manufacturing within the context of the circular economy across diverse industries in recent years. However, a notable gap exists in the research landscape, particularly concerning the implementation of lean practices within the pharmaceutical industry to enhance circular economy performance. Addressing this void, this study endeavors to identify and prioritize the pivotal drivers influencing lean manufacturing within the pharmaceutical sector.

Findings

The outcome of this rigorous examination highlights that “Continuous Monitoring Process for Sustainable Lean Implementation,” “Management Involvement for Sustainable Implementation” and “Training and Education” emerge as the most consequential drivers. These factors are deemed crucial for augmenting circular economy performance, underscoring the significance of management engagement, training initiatives and a continuous monitoring process in fostering a closed-loop practice within the pharmaceutical industry.

Research limitations/implications

The findings contribute valuable insights for decision-makers aiming to adopt lean practices within a circular economy framework. Specifically, by streamlining the process of developing a robust action plan tailored to the unique needs of the pharmaceutical sector, our study provides actionable guidance for enhancing overall sustainability in the manufacturing processes.

Originality/value

This study represents one of the initial efforts to systematically identify and assess the drivers to LM implementation within the pharmaceutical industry, contributing to the emerging body of knowledge in this area.

Details

International Journal of Industrial Engineering and Operations Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2690-6090

Keywords

Article
Publication date: 28 March 2024

Elisa Gonzalez Santacruz, David Romero, Julieta Noguez and Thorsten Wuest

This research paper aims to analyze the scientific and grey literature on Quality 4.0 and zero-defect manufacturing (ZDM) frameworks to develop an integrated quality 4.0 framework…

Abstract

Purpose

This research paper aims to analyze the scientific and grey literature on Quality 4.0 and zero-defect manufacturing (ZDM) frameworks to develop an integrated quality 4.0 framework (IQ4.0F) for quality improvement (QI) based on Six Sigma and machine learning (ML) techniques towards ZDM. The IQ4.0F aims to contribute to the advancement of defect prediction approaches in diverse manufacturing processes. Furthermore, the work enables a comprehensive analysis of process variables influencing product quality with emphasis on the use of supervised and unsupervised ML techniques in Six Sigma’s DMAIC (Define, Measure, Analyze, Improve and Control) cycle stage of “Analyze.”

Design/methodology/approach

The research methodology employed a systematic literature review (SLR) based on PRISMA guidelines to develop the integrated framework, followed by a real industrial case study set in the automotive industry to fulfill the objectives of verifying and validating the proposed IQ4.0F with primary data.

Findings

This research work demonstrates the value of a “stepwise framework” to facilitate a shift from conventional quality management systems (QMSs) to QMSs 4.0. It uses the IDEF0 modeling methodology and Six Sigma’s DMAIC cycle to structure the steps to be followed to adopt the Quality 4.0 paradigm for QI. It also proves the worth of integrating Six Sigma and ML techniques into the “Analyze” stage of the DMAIC cycle for improving defect prediction in manufacturing processes and supporting problem-solving activities for quality managers.

Originality/value

This research paper introduces a first-of-its-kind Quality 4.0 framework – the IQ4.0F. Each step of the IQ4.0F was verified and validated in an original industrial case study set in the automotive industry. It is the first Quality 4.0 framework, according to the SLR conducted, to utilize the principal component analysis technique as a substitute for “Screening Design” in the Design of Experiments phase and K-means clustering technique for multivariable analysis, identifying process parameters that significantly impact product quality. The proposed IQ4.0F not only empowers decision-makers with the knowledge to launch a Quality 4.0 initiative but also provides quality managers with a systematic problem-solving methodology for quality improvement.

Details

The TQM Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 21 March 2024

Abul Bashar, Ahsan Akhtar Hasin, Md. Nazmus Sakib and Nabila Binta Bashar

In the highly competitive business landscape, manufacturing firms need to adopt an effective manufacturing strategy to attain a successful world-class manufacturing status. Over…

Abstract

Purpose

In the highly competitive business landscape, manufacturing firms need to adopt an effective manufacturing strategy to attain a successful world-class manufacturing status. Over the past few decades, the lean manufacturing (LM) approach has gained recognition as one of the foremost strategies for enhancing performance. However, the implementation of LM poses significant challenges due to several barriers. The purpose of this paper is to investigate the primary barriers to lean implementation within the apparel industry.

Design/methodology/approach

This paper used an exploratory study approach, using a three-part structured questionnaire to assess the level of agreement on different lean barriers. The measurement of these barriers was conducted using a five-point Likert scale. Empirical data were collected from 177 apparel companies located in Bangladesh.

Findings

The findings of the research highlight that the primary obstacles to implementing LI include a lack of understanding of the lean manufacturing system (LMS), the manufacturing process, the company culture and resistance from employees.

Research limitations/implications

This paper could potentially limit the generalizability of this research, as it exclusively examines a single manufacturing sector – the apparel industry.

Practical implications

This paper will help practitioners in finding solutions to resolve discrepancies between current manufacturing practices and the LMS.

Originality/value

This paper fulfills an identified need to examine the extent of lean adoption within the apparel industry of Bangladesh.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 29 September 2023

Darwish Abdulrahman Yousef

This study aims to review the current status of quality management (QM) research in Arab countries between 2001 and 2020.

Abstract

Purpose

This study aims to review the current status of quality management (QM) research in Arab countries between 2001 and 2020.

Design/methodology/approach

The study adopted the content analysis methodology, searching through various databases and search engines for relevant publications using several keywords. The selected publications were classified according to several criteria and the obtained results were presented in the form of frequencies and percentages.

Findings

Most research publications regarding QM were journal articles. The number of publications has steadily increased between 2001 and 2020. Moreover, QM research largely uses the quantitative research design. Questionnaire surveys are widely used as a data collection method; basic statistical analysis techniques are commonly employed to analyze the data. There is a tendency toward empirical research versus conceptual research. A few journal articles were published in reputed peer-reviewed international journals with low citation. Overall, Arab scholars research on QM and related topics over the past two decades is not significant for the field considering the number of published papers, citations and the papers published in reputed peer-reviewed international journals.

Research limitations/implications

This study has several limitations. First, it does not cover non-English information sources due to the overall lack of Arabic publication databases. Second, it uses a limited number of criteria to classify the selected publications. Third, it adopts the content analysis methodology to classify the selected publications. This method has several limitations, which may negatively affect the results. Nevertheless, the study offers several implications for research scholars, educators and practitioners.

Originality/value

This is the first study to attempt a comprehensive overview of the state of research on QM in Arab countries between 2001 and 2020 using the content analysis methodology.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 4
Type: Research Article
ISSN: 0265-671X

Keywords

Open Access
Article
Publication date: 3 March 2023

Amy B.C. Tan, Desirée H. van Dun and Celeste P.M. Wilderom

With the growing need for employees to be innovative, public-sector organizations are investing in employee training. This study aims to examine the effects of a combined Lean Six…

3966

Abstract

Purpose

With the growing need for employees to be innovative, public-sector organizations are investing in employee training. This study aims to examine the effects of a combined Lean Six Sigma and innovation training, using action learning, on public-sector employees’ creative role identity and innovative work behavior.

Design/methodology/approach

The authors studied a public service agency in Singapore in which a five-day Lean Innovation Training was implemented, using a combination of Lean Six Sigma and Creative Problem-Solving tools, with a simulation on day one and subsequent team-based project coaching, spread over six months. The authors administered pre- and postintervention surveys among all the employees, and initiated group interviews and observations before, during and after the intervention.

Findings

Creative role identity and innovative work behavior had significantly improved six months after the intervention, enabled through senior management’s transformational leadership. The training induced managers to role-model innovative work behaviors while cocreating, with their employees, a renewal of their agency’s core processes. The three completed improvement projects contributed to an innovative work culture and reduced service turnaround time.

Originality/value

Starting with a role-playing simulation on the first day, during which leaders and followers swapped roles, the action-learning type training taught all the organizational members to use various Lean Six Sigma and Creative Problem-Solving tools. This nimble Lean Innovation Training, and subsequent team-based project coaching, exemplifies how advancing the staff’s creative role identity can have a positive impact.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 22 March 2024

Giovanni Cláudio Pinto Condé, José Carlos Toledo and Mauro Luiz Martens

The purpose of this paper is to test and develop a method for generation and selection of six sigma projects. This is done by testing the use of the generation and selection…

Abstract

Purpose

The purpose of this paper is to test and develop a method for generation and selection of six sigma projects. This is done by testing the use of the generation and selection method for six sigma projects (GSM_SSP) in a Brazilian manufacturing industry with the participation of managers, aiming to gather the user’s perspective and improvement opportunities for the approach itself.

Design/methodology/approach

The work adopts the action research (AR) approach once the researchers were busily involved in the training, implementation and use of the GSM_SSP. The intervention was performed in on a series of 15 workshops, with a group of managers, during six months.

Findings

The application of the eight steps of the GSM_SSP approach assisted the company’s management team to generate nine project candidates and also to select three six sigma projects. This study also finds and discusses barriers and lessons learned used to improve the GSM_SSP.

Research limitations/implications

This study presents an example of how six sigma project generation and selection has been applied to a manufacturing industry by adapting AR to the process using the eight steps of GSM_SSP, demonstrating how the management team was involved. This study should be replicated in different companies because AR is limited in its generalization.

Originality/value

To the best of the authors’ knowledge, this study represents the first use of AR methodology in six sigma project selection. This study contributes a method that can generate and select six sigma projects. In doing so, the research offers a simple approach that can be used by managers. In addition, the steps of the approach before selection were explored.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 7 June 2023

Khalil Idrissi Gartoumi, Mohamed Aboussaleh and Smail Zaki

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation…

Abstract

Purpose

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects.

Design/methodology/approach

This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process.

Findings

Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators.

Research limitations/implications

This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used.

Originality/value

This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

1 – 10 of 42