Article
Publication date: 29 September 2023

Shang Gao, Toong-Khuan Chan and Phil Hendy

Infrastructure projects are complex, task-based endeavours; the reliability of project schedules is often low, as delays occur. As a result, the infrastructure sector is…

Abstract

Purpose

Infrastructure projects are complex, task-based endeavours; the reliability of project schedules is often low, as delays occur. As a result, the infrastructure sector is constantly searching for innovative practices that might improve project performance. This study aims to pursue one research question: what are the benefits and challenges to last planner system (LPS) implementation in Australia’s infrastructure industry? It addresses this question through an examination of two rail infrastructure projects in Victoria, Australia.

Design/methodology/approach

The state of Victoria in Australia provides an excellent context for this study. The study was set in one of the programme alliances which was contracted to carry out five level-crossing removal projects. This study uses a combination of qualitative and quantitative research techniques, including surveys, interviews and site visits. The authors collected 43 valid survey responses. Additionally, 19 participants from the alliance programme’s two projects (Projects A and B) took part in the interviews. Extensive empirical evidence has been triangulated to achieve the research goals.

Findings

The findings show through the questionnaire survey that the greatest benefits that digital LPS brings are primarily associated with process improvement and social benefits. The interview results acknowledged that the roll-out of digital LPS had a positive impact on schedules, cost, occupational health and safety (OHS) and quality performance. The research also noted a few challenges in the introduction of digital LPS. Overall, the finding presents strong evidence that the introduction of digital LPS has been a clear success in the case company.

Originality/value

This is the first piece of research to fill this major gap in the LPS literature by exploring the issue of digital LPS adoption in Australia’s infrastructure sector. This study has thus laid the foundation for future work on LPS research in the Australian context. The authors are optimistic that this exploratory work will generate interest across other alliances, and perhaps extend into Australia’s construction sector.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 14 January 2014

Abdullah O. AlSehaimi, Patricia Tzortzopoulos Fazenda and Lauri Koskela

The purpose of this paper is to evaluate the effectiveness of implementing the Last Planner System (LPS) to improve construction planning practice and enhance site management in…

4979

Abstract

Purpose

The purpose of this paper is to evaluate the effectiveness of implementing the Last Planner System (LPS) to improve construction planning practice and enhance site management in the Saudi construction industry.

Design/methodology/approach

LPS was implemented in two large state-owned construction projects through an action research process. The data collection methods included interviews, observations and a survey questionnaire.

Findings

The findings identify benefits including improved construction planning, enhanced site management and better communication and coordination between the parties involved. The paper describes the critical success factors for LPS implementation. The paper also describes barriers to the realisation the full potential of LPS, including the involvement of many subcontractors and people's commitment and attitude to time.

Research limitations/implications

The work reported in this paper is limited to two case studies.

Practical implications

The study has thus contributed to improving management practice and may aid the establishment of a basis for the development of further research in the area of lean construction. The research outcomes can inform practitioners of the opportunity to implement alternative management methods in construction, and give a good account of the opportunities and challenges. Beside the direct benefits to managerial practice, the study also contributed to practice by offering practical recommendation that can assist in the achievement of the full potential of lean and LPS in Saudi Arabia.

Originality/value

This is the first comprehensive academic study in the Saudi construction sector concerning the application of lean construction principles and techniques. The study has thus contributed to practice and developed a basis for the development of further research in the area of lean construction. It may help construction organisations to establish a new strategy and policies to improve their managerial practice. The outcomes of the case studies can be used as a reference for organisations seeking to improve their managerial practice.

Details

Engineering, Construction and Architectural Management, vol. 21 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 September 2018

Athena Maria Perez and Somik Ghosh

Documented evidence supports the improvements resulting from the use of the Last Planner System® (LPS) as a lean construction technique; however, several barriers to the…

Abstract

Purpose

Documented evidence supports the improvements resulting from the use of the Last Planner System® (LPS) as a lean construction technique; however, several barriers to the implementation of the technique have been identified. The purpose of this paper is to evaluate the implementation process of LPS by a project team that is transitioning from the traditional planning and control to LPS on a typical commercial project. The paper compares the adopted implementation process with that of the recommended best practices and identifies the overlaps and variances.

Design/methodology/approach

An in-depth case study was conducted to accomplish the specific objectives: document the process of LPS implementation in detail; identify the overlaps and variance from the recommended practices; and investigate the causes for variance from the recommended practices. The authors used direct observations, document investigations and semi-structured interviews with key project participants to gather data. Constant comparison and content analysis were used as data analysis method for this study.

Findings

The paper identified critical barriers to the implementation process of LPS in the case study project, which are supported by existing literature and are considered typical of project teams that are new adopters and transitioning to the implementation of LPS.

Research limitations/implications

Based on a single case study, the outcomes may lack generalizability. However, similar findings of existing literature and evaluations by the project personnel substantiated the findings of the study.

Originality/value

The study attempted to conduct a systematic investigation on the implementation process of LPS, which is a less investigated topic. The paper draws attention to the major barriers experienced while adopting LPS in the case study project and suggested possible ways to address similar issues in the future. The barriers experienced by the case study project are typical of project teams who are new adopters and transitioning to the adoption of LPS, process and have the potential to be alleviated through the recommended practice implementation and process maintenance strategy.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 June 2019

Bassam A. Tayeh, Khalid Al Hallaq, Hafiz Zahoor and Abdulla H. Al Faqawi

The purpose of this paper is to prioritize the vital tools/techniques for the effective implementation of the last planner system (LPS) in the cross-cultural setting of a…

Abstract

Purpose

The purpose of this paper is to prioritize the vital tools/techniques for the effective implementation of the last planner system (LPS) in the cross-cultural setting of a developing country, i.e. Gaza Strip. Besides, the potential benefits of implementing LPS are prioritized.

Design/methodology/approach

The significant techniques and likely benefits of LPS implementations were identified through comprehensive literature, followed by their verification through a pilot study. The quantitative data were collected using a questionnaire survey from 89 companies, operating in the Gaza Strip construction industry. The relative important index was calculated for prioritizing the significant tools/techniques (16) which support the effective LPS implementation, and highlighting the potential benefits (10) achieved through LPS implementation.

Findings

The results showed that the “use of visual devices to spread information in the construction site,” “attendance of key actors” and “look ahead plan” are the most important tools/techniques supporting LPS implementation. The top three potential benefits of implementing LPS include: “allows a better understanding of the program control,” “maximizes the co-operation and confidence among team members” and “allows the manager to better visualize the work program.” To prevent any waste in project time and to ensure the material supply and continuity of works, the study recommends advance supply and storage of demand materials, and early availability of the shop-drawings for acceptance by the superintendent.

Practical implications

The study’s findings are expected to guide the key construction stakeholders to prioritize their energies toward effective LPS implementation in the Gaza Strip.

Originality/value

Though this study pertains to Palestine, its methodology can be generalized in other countries and regions, having a similar work environment, after making necessary cultural adjustments.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 September 2021

Gunnar Jürgen Lühr, Marian Bosch-Rekveldt and Mladen Radujković

The purpose of this paper is to investigate the Last-Planner-System’s impact on project cultures in terms of partnering.

Abstract

Purpose

The purpose of this paper is to investigate the Last-Planner-System’s impact on project cultures in terms of partnering.

Design/methodology/approach

A case study was performed using multiple data gathering approaches. The project cultures of three projects not applying the Last-Planner-System were compared with three projects that apply the Last-Planner-System. In total, 30 participants were involved in the study. Semi-structured interviews were held and analysed by applying qualitative content analysis. Also, the “organizational culture assessment instrument”, which belongs to the “competing values framework”, was used by means of an online survey.

Findings

The Last-Planner-System leads to increased levels of mutual understanding and control about the tasks and issues of the other parties. This detailed overview leads towards a more distinguished evaluation of the trustworthiness of individuals. This does not necessarily lead to a partnering project culture.

Originality/value

The contribution to research is that higher levels of transparency and mutual understanding do not necessarily lead to a high level of trust. Rather, transparency could be seen as a controlling mechanism that leads to better-founded estimations about the trustworthiness of others in the project.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 October 2023

Mohamed Saad Bajjou and Anas Chafi

Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do…

Abstract

Purpose

Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do exist in the construction industry, the research topic related to LC implementation is still unexplored due to the scarcity of validated assessment frameworks. This study aims to provide the first attempt in developing a structural model for successful LC implementation.

Design/methodology/approach

This study developed a Lean construction model (LCM) by critically reviewing seven previous LC frameworks from different countries, defining 18 subprinciples grouped into 6 major principles and formulating testable hypotheses. The questionnaire was pre-tested with 12 construction management experts and revised by 4 specialized academics. A pilot study with 20 construction units enhanced content reliability. Data from 307 Moroccan construction companies were collected to develop a measurement model. SPSS V. 26 was used for Exploratory Factor Analysis, followed by confirmatory factor analysis using AMOS version 23. Finally, a structural equation model statistically assessed each construct's contribution to the success of LC implementation.

Findings

This work led to the development of an original LCM based on valid and reliable LC constructs, consisting of 18 measurement items grouped into 6 LC principles: Process Transparency, People involvement, Waste elimination, Planning and Continuous improvement, Client Focus and Material/information flow and pull. According to the structural model, LC implementation success is positively influenced by Planning and Scheduling/continuous improvement (β = 0.930), followed by Elimination of waste (β = 0.896). Process transparency ranks third (β = 0.858). The study demonstrates that all these factors are mutually complementary, highlighting a positive relationship between LC implementation success and the holistic application of all LC principles.

Originality/value

To the best of the authors’ knowledge, this study is the first attempt to develop a statistically proven model of LC based on structural equation modelling analysis, which is promising for stimulating construction practitioners and researchers for more empirical studies in different countries to obtain a more accurate reflection of LC implementation. Moreover, the paper proposes recommendations to help policymakers, academics and practitioners anticipate the key success drivers for more successful LC implementation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 June 2020

Wassim Albalkhy and Rateb Sweis

The purpose of this paper is to identify and theoretically explain the general barriers to adopting lean construction practices in the construction industry regardless of the…

2174

Abstract

Purpose

The purpose of this paper is to identify and theoretically explain the general barriers to adopting lean construction practices in the construction industry regardless of the country or the company size or specialization, and to suggest future research studies in this field.

Design/methodology/approach

Systematic literature review was conducted to identify and explain the list of the barriers from scientific sources that were published before May 2018.

Findings

Twenty-nine barriers were identified and explained, and a proposed model to classify the sources of the barriers was chosen. Seventeen barriers were classified as internal environment-related barriers, five were labor-related, three were materials-related and four were exogenous barriers. In addition, some directions for the future research studies were suggested.

Research limitations/implications

The barriers that are related to the advanced levels of lean construction (LC) implementations, to a specific location or to a specific LC tool were excluded.

Originality/value

This review will help to increase the understanding of the new concept of LC and might help to encourage the adoption of LC practices. Also, it might be useful for identifying the strategies to achieve successful application of these practices.

Details

International Journal of Lean Six Sigma, vol. 12 no. 2
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 7 June 2023

Khalil Idrissi Gartoumi, Mohamed Aboussaleh and Smail Zaki

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation…

Abstract

Purpose

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects.

Design/methodology/approach

This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process.

Findings

Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators.

Research limitations/implications

This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used.

Originality/value

This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The challenges confronting the Nigerian construction industry which led to the adoption of supply chain management (SCM) practice were evaluated in this chapter. It was discovered…

Abstract

The challenges confronting the Nigerian construction industry which led to the adoption of supply chain management (SCM) practice were evaluated in this chapter. It was discovered that the Nigerian construction industry is confronted with fragmentation and poor information management. The stakeholders within the Nigerian construction industry proposed the adoption of SCM to overcome the fragmentation and other shenanigans facing the industry. This chapter revealed that construction supply chain (CSC) practices within the Nigerian construction industry focus on waste elimination by adopting the lean concept. The focus on the lean concept could be attributed to the numerous research related to lean or the enormous waste emanating from the Nigerian construction industry. Regardless of the emphasis on lean, the Nigerian CSC is still confronted with fragmentation and heavy waste generation. Thus, this chapter proposed the adoption of principles and technologies driven by the fourth industrial revolution (4IR) is a paradigm shift for the management of CSC in the country. It was discovered in this chapter that Nigerian construction supply stakeholders had not embraced the technologies and principles of the 4IR. The failure to adopt the technologies driven by the 4IR is attributed to the absence of a CSC model that depicts the management of CSC in alignment with the 4IR. This chapter called for developing a SCM model for the Nigerian construction industry in tandem with the principles and technologies of the 4IR.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Article
Publication date: 24 March 2020

Aline Patricia Mano, Sergio E. Gouvea da Costa and Edson Pinheiro de Lima

The purpose of this study seeks to identify the critical barriers for the deployment of Lean Construction (LC).

1015

Abstract

Purpose

The purpose of this study seeks to identify the critical barriers for the deployment of Lean Construction (LC).

Design/methodology/approach

In order to identify the barriers of Lean Construction, a systematic review of the scientific literature was carried out, in addition to analysis of the content of papers presented at a major Lean Construction conference. After the barriers were identified, a Lawshe study was conducted with experts in Lean Construction to verify the criticality of each of the barriers encountered.

Findings

This study identified 83 potential pre-deployment barriers in the literature, of which eight were considered critical by the experts. The results of Lawshe study pointed that critical barriers refer to leadership characteristics, cultural aspects and structural aspects.

Research limitations/implications

Variations in the assessment of the criticality of the barriers may occur from one country to another due to regional differences in the construction sector.

Practical implications

The implications of this study are recognizing and identifying the characteristics of an organization that can hinder Lean Construction allows these issues to be resolved before beginning the Lean journey.

Originality/value

This article is the first of its kind to assess the criticality of barriers to Lean Construction using a quantitative technique. Knowledge of this set of barriers provides both practical and theoretical readers with an increased chance of success in the deployment of an LC project.

Details

International Journal of Productivity and Performance Management, vol. 70 no. 1
Type: Research Article
ISSN: 1741-0401

Keywords