Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 29 September 2023

Shang Gao, Toong-Khuan Chan and Phil Hendy

Infrastructure projects are complex, task-based endeavours; the reliability of project schedules is often low, as delays occur. As a result, the infrastructure sector is…

Abstract

Purpose

Infrastructure projects are complex, task-based endeavours; the reliability of project schedules is often low, as delays occur. As a result, the infrastructure sector is constantly searching for innovative practices that might improve project performance. This study aims to pursue one research question: what are the benefits and challenges to last planner system (LPS) implementation in Australia’s infrastructure industry? It addresses this question through an examination of two rail infrastructure projects in Victoria, Australia.

Design/methodology/approach

The state of Victoria in Australia provides an excellent context for this study. The study was set in one of the programme alliances which was contracted to carry out five level-crossing removal projects. This study uses a combination of qualitative and quantitative research techniques, including surveys, interviews and site visits. The authors collected 43 valid survey responses. Additionally, 19 participants from the alliance programme’s two projects (Projects A and B) took part in the interviews. Extensive empirical evidence has been triangulated to achieve the research goals.

Findings

The findings show through the questionnaire survey that the greatest benefits that digital LPS brings are primarily associated with process improvement and social benefits. The interview results acknowledged that the roll-out of digital LPS had a positive impact on schedules, cost, occupational health and safety (OHS) and quality performance. The research also noted a few challenges in the introduction of digital LPS. Overall, the finding presents strong evidence that the introduction of digital LPS has been a clear success in the case company.

Originality/value

This is the first piece of research to fill this major gap in the LPS literature by exploring the issue of digital LPS adoption in Australia’s infrastructure sector. This study has thus laid the foundation for future work on LPS research in the Australian context. The authors are optimistic that this exploratory work will generate interest across other alliances, and perhaps extend into Australia’s construction sector.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 7 December 2023

Hui Zhao, Xian Cheng, Jing Gao and Guikun Yu

Building a smart city is a necessary path to achieve sustainable urban development. Smart city public–private partnership (PPP) project is a necessary measure to build a smart…

Abstract

Purpose

Building a smart city is a necessary path to achieve sustainable urban development. Smart city public–private partnership (PPP) project is a necessary measure to build a smart city. Since there are many participants in smart city PPP projects, there are problems such as uneven distribution of risks; therefore, in order to ensure the normal construction and operation of the project, the reasonable sharing of risks among the participants becomes an urgent problem to be solved. In order to make each participant clearly understand the risk sharing of smart city PPP projects, this paper aims to establish a scientific and practical risk sharing model.

Design/methodology/approach

This paper uses the literature review method and the Delphi method to construct a risk index system for smart city PPP projects and then calculates the objective and subjective weights of each risk index through the Entropy Weight (EW) and G1 methods, respectively, and uses the combined assignment method to find the comprehensive weights. Considering the nature of the risk sharing problem, this paper constructs a risk sharing model for smart city PPP projects by initially sharing the risks of smart city PPP projects through Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) to determine the independently borne risks and the jointly borne risks and then determines the sharing ratio of the jointly borne risks based on utility theory.

Findings

Finally, this paper verifies the applicability and feasibility of the risk-sharing model through empirical analysis, using the smart city of Suzhou Industrial Park as a research case. It is hoped that this study can provide a useful reference for the risk sharing of PPP projects in smart cities.

Originality/value

In this paper, the authors calculate the portfolio assignment by EW-G1 and construct a risk-sharing model by TOPSIS-Utility Theory (UT), which is applied for the first time in the study of risk sharing in smart cities.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 22 March 2024

Giovanni Cláudio Pinto Condé, José Carlos Toledo and Mauro Luiz Martens

The purpose of this paper is to test and develop a method for generation and selection of six sigma projects. This is done by testing the use of the generation and selection…

Abstract

Purpose

The purpose of this paper is to test and develop a method for generation and selection of six sigma projects. This is done by testing the use of the generation and selection method for six sigma projects (GSM_SSP) in a Brazilian manufacturing industry with the participation of managers, aiming to gather the user’s perspective and improvement opportunities for the approach itself.

Design/methodology/approach

The work adopts the action research (AR) approach once the researchers were busily involved in the training, implementation and use of the GSM_SSP. The intervention was performed in on a series of 15 workshops, with a group of managers, during six months.

Findings

The application of the eight steps of the GSM_SSP approach assisted the company’s management team to generate nine project candidates and also to select three six sigma projects. This study also finds and discusses barriers and lessons learned used to improve the GSM_SSP.

Research limitations/implications

This study presents an example of how six sigma project generation and selection has been applied to a manufacturing industry by adapting AR to the process using the eight steps of GSM_SSP, demonstrating how the management team was involved. This study should be replicated in different companies because AR is limited in its generalization.

Originality/value

To the best of the authors’ knowledge, this study represents the first use of AR methodology in six sigma project selection. This study contributes a method that can generate and select six sigma projects. In doing so, the research offers a simple approach that can be used by managers. In addition, the steps of the approach before selection were explored.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 20 February 2024

Nguyen Van Tam

Though widely recognized as essential for improving work performance across various domains, self-efficacy’s specific role in managing construction workforces remains…

Abstract

Purpose

Though widely recognized as essential for improving work performance across various domains, self-efficacy’s specific role in managing construction workforces remains understudied. This knowledge gap restricts our ability to uncover new factors that enhance workforce management effectiveness and ultimately boost construction labor productivity (CLP). To address this, our study proposes and tests a novel model. This model explores the impact mechanism of self-efficacy on CLP by investigating the mediating role of work motivation. By delving into this crucial yet underexplored area, we aim to provide valuable insights for construction project managers and researchers alike, paving the way for more effective workforce management strategies and consequently, improved CLP.

Design/methodology/approach

This study utilizes a mixed-method approach, incorporating both qualitative and quantitative methodologies. Data from 112 rebar workers at five construction sites in Vietnam underwent analysis using Cronbach’s alpha, exploratory factor analysis (EFA), confirmatory factor analysis (CFA) and structural equation modeling (SEM) to examine the novel research model.

Findings

The results indicate a positive and significant association between self-efficacy and CLP. Additionally, work motivation emerged as a full mediator in the relationship between self-efficacy and CLP. Specifically, individuals with higher self-efficacy set ambitious goals and invest more effort in their pursuit, leading to increased work motivation and, ultimately, heightened productivity levels.

Practical implications

The significant implications of the current study extend to construction managers and policymakers alike. Construction managers can leverage the findings to devise targeted interventions aimed at enhancing the self-efficacy and work motivation of their workforce, potentially resulting in noteworthy enhancements in CLP. Policymakers, too, can benefit from these findings by formulating policies that actively support the cultivation of self-efficacy and work motivation among construction workers. Such policies have the potential to foster a more productive and efficient construction industry, aligning with the broader goals of workforce development and industry enhancement.

Originality/value

This study expands existing knowledge by identifying the important role of self-efficacy in work performance enhancement and the mediating role of work motivation in terms of these relationships.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 August 2023

Diego A. de J. Pacheco, Rodrigo Veleda Caetano, Samuel Vinícius Bonato, Bruno Miranda dos Santos and Wagner Pietrobelli Bueno

Small retail stores in the luxury market face significant challenges due to fluctuations in market demand. This task turns challenging as it requires effectively coordinating and…

Abstract

Purpose

Small retail stores in the luxury market face significant challenges due to fluctuations in market demand. This task turns challenging as it requires effectively coordinating and translating customer needs into specific requirements that align with retail goals and available resources. However, limited empirical research exists investigating how managers can address service value and quality attributes in small retail stores. This article aims to bridge this gap by investigating the role of quality function deployment (QFD) in improving market and quality requirements management in small retail stores.

Design/methodology/approach

Based on the case study, a customer survey was initially conducted to gather information on critical characteristics valued in the luxury retail segment. QFD was used to assist the company in identifying and prioritizing key quality attributes to meet customer requirements effectively.

Findings

The findings demonstrate that implementing QFD in small luxury retail stores empowers managers to identify previously neglected product and service quality aspects. The article shows that QFD informs organizational adaptations that align with the demands of the retail market, leading to an improved ability to meet customer expectations and enhance customer value through the development of enhanced products and services. The study showcases the efficacy of the tested methodology in effectively capturing and prioritizing both tangible and intangible customer needs in retail.

Practical implications

Findings offer valuable insights to retail managers of small luxury stores, providing actionable market-oriented strategies. By implementing the recommended practices, managers can improve the store’s competitiveness and better cater to the customer base.

Originality/value

This study contributes to bridging persistent knowledge gaps by addressing the unique context of small luxury retail stores and introducing the application of QFD in this setting. The insights gained from this research are relevant to both retailing and quality management literature. Considering the growing prevalence of transformations in the retail industry, the study provides practical implications for retail managers in effectively navigating these changes.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 20 June 2023

Debolina Dutta and Anasha Kannan Poyil

The importance of learning in development in increasingly dynamic contexts can help individuals and organizations adapt to disruption. Artificial intelligence (AI) is emerging as…

Abstract

Purpose

The importance of learning in development in increasingly dynamic contexts can help individuals and organizations adapt to disruption. Artificial intelligence (AI) is emerging as a disruptive technology, with increasing adoption by various human resource management (HRM) functions. However, learning and development (L&D) adoption of AI is lagging, and there is a need to understand of this low adoption based on the internal/external contexts and organization types. Building on open system theory and adopting a technology-in-practice lens, the authors examine the various L&D approaches and the roles of human and technology agencies, enabled by differing structures, different types of organizations and the use of AI in L&D.

Design/methodology/approach

Through a qualitative interview design, data were collected from 27 key stakeholders and L&D professionals of MSMEs, NGOs and MNEs organizations. The authors used Gioia's qualitative research approach for the thematic analysis of the collected data.

Findings

The authors argue that human and technology agencies develop organizational protocols and structures consistent with their internal/external contexts, resource availability and technology adoptions. While the reasons for lagging AI adoption in L&D were determined, the future potential of AI to support L&D also emerges. The authors theorize about the socialization of human and technology-mediated interactions to develop three emerging structures for L&D in organizations of various sizes, industries, sectors and internal/external contexts.

Research limitations/implications

The study hinges on open system theory (OST) and technology-in-practice to demonstrate the interdependence and inseparability of human activity, technological advancement and capability, and structured contexts. The authors examine the reasons for lagging AI adoption in L&D and how agentic focus shifts contingent on the organization's internal/external contexts.

Originality/value

While AI-HRM scholarship has primarily relied on psychological theories to examine impact and outcomes, the authors adopt the OST and technology in practice lens to explain how organizational contexts, resources and technology adoption may influence L&D. This study investigates the use of AI-based technology and its enabling factors for L&D, which has been under-researched.

Details

Personnel Review, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0048-3486

Keywords

Article
Publication date: 27 July 2023

Ning Huang, Qiang Du, Libiao Bai and Qian Chen

In recent decades, infrastructure has continued to develop as an important basis for social development and people's lives. Resource management of these large-scale projects has…

Abstract

Purpose

In recent decades, infrastructure has continued to develop as an important basis for social development and people's lives. Resource management of these large-scale projects has been immensely concerned because dozens of construction enterprises (CEs) often work together. In this situation, resource collaboration among enterprises has become a key measure to ensure project implementation. Thus, this study aims to propose a systematic multi-agent resource collaborative decision-making optimization model for large projects from a matching perspective.

Design/methodology/approach

The main contribution of this work was an advancement of the current research by: (1) generalizing the resource matching decision-making problem and quantifying the relationship between CEs. (2) Based on the matching domain, the resource input costs and benefits of each enterprise in the associated group were comprehensively analyzed to build the mathematical model, which also incorporated prospect theory to map more realistic decisions. (3) According to the influencing factors of resource decision-making, such as cost, benefit and attitude of decision-makers, determined the optimal resource input in different situations.

Findings

Numerical experiments were used to verify the effectiveness of the multi-agent resource matching decision (MARMD) method in this study. The results indicated that this model could provide guidance for optimal decision-making for each participating enterprise in the resource association group under different situations. And the results showed the psychological preference of decision-makers has an important influence on decision performance.

Research limitations/implications

While the MARMD method has been proposed in this research, MARMD still has many limitations. A more detailed matching relationship between different resource types in CEs is still not fully analyzed, and relevant studies about more accurate parameters of decision-makers’ psychological preferences should be conducted in this area in the future.

Practical implications

Compared with traditional projects, large-scale engineering construction has the characteristics of huge resource consumption and more participants. While decision-makers can determine the matching relationship between related enterprises, this is ambiguous and the wider range will vary with more participants or complex environment. The MARMD method provided in this paper is an effective methodological tool with clearer decision-making positioning and stronger actual operability, which could provide references for large-scale project resource management.

Social implications

Large-scale engineering is complex infrastructure projects that ensure national security, increase economic development, improve people's lives and promote social progress. During the implementation of large-scale projects, CEs realize value-added through resource exchange and integration. Studying the optimal collaborative decision of multi-agent resources from a matching perspective can realize the improvement of resource transformation efficiency and promote the development of large-scale engineering projects.

Originality/value

The current research on engineering resources decision-making lacks a matching relationship, which leads to unclear decision objectives, ambiguous decision processes and poor operability decision methods. To solve these issues, a novel approach was proposed to reveal the decision mechanism of multi-agent resource optimization in large-scale projects. This paper could bring inspiration to the research of large-scale project resource management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 July 2023

Lin Yang, Xiaoyue Lv and Xianbo Zhao

Abnormal behaviors such as rework, backlog, changes and claims generated by project organizations are unavoidable in complex projects. When abnormal behaviors emerge, the…

Abstract

Purpose

Abnormal behaviors such as rework, backlog, changes and claims generated by project organizations are unavoidable in complex projects. When abnormal behaviors emerge, the previously normal state of interactions between organizations will be altered to some extent. However, previous studies have ignored the associations and interactions between organizations in the context of abnormal organizational behaviors (AOBs), making this challenging to cope with AOBs. As a result, the objective of this paper is to explore how to reduce AOBs in complex projects at the organizational level from a network perspective.

Design/methodology/approach

To overcome the inherent limitations of a single case study, this research integrated two data collection methods: questionnaire survey and expert scoring method. The questionnaire survey captured the universal data on the influence possibility of AOBs between complex project organizations and the expert scoring method got the influence probability scores of AOBs between organizations in the case. Using these data, four organizational influence network models of AOBs based on a case were developed to demonstrate how to destroy AOBs networks in complex projects using network attack theory (NAT).

Findings

First, the findings show that controlling AOBs generated by key organizations preferentially and improving the ability of key organizations can weaken AOBs network, enabling more effective coping strategies. Second, the owners, government, material suppliers and designers are identified as key organizations across all four influence networks of AOBs. Third, change and claim behaviors are more manageable from the organizational level.

Practical implications

Project managers can target specific organizations for intervention, weaken the AOBs network by applying NAT and achieve better project outcomes through coping strategies. Additionally, by taking a network perspective, this research provides a novel approach to comprehending the associations and interactions between organizations in the context of complex projects.

Originality/value

This paper proposes a new approach to investigating AOBs in complex projects by simultaneously examining rework, backlog, change and claim. Leveraging NAT as a novel tool for managing the harmful effects of influence networks, this study extends the knowledge body in the field of organizational behavior (OB) management and complex project management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects…

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 3000