Search results

1 – 10 of over 2000
Article
Publication date: 25 June 2019

Adnan Enshassi, Nour Saleh and Sherif Mohamed

This paper aims to investigate the application of lean construction (LC) techniques in reducing accidents in construction projects.

1096

Abstract

Purpose

This paper aims to investigate the application of lean construction (LC) techniques in reducing accidents in construction projects.

Design/methodology/approach

A quantitative approach was used to collect the required data using a questionnaire survey and descriptive analysis was used to analyse the collected data. The LC techniques that were investigated in this paper are related to the tools of the last planner system (LPS), increased visualisation (IV), 5S, error-proofing, daily huddle meetings (DHMs), first-run studies (FRS), continuous improvement (Kaizen) and accident investigation (5Whys).

Findings

The overall results indicated that LC techniques are poorly implemented in construction projects in the Gaza Strip. The top three LC tools used to reduce the causes of accidents in the Gaza construction projects were 5Whys, 5S and LPS, while the highest three LC techniques applied to reduce the causes of accidents that were applicable were cleaning the workplace and removing materials and machines that are not required; conducting accident investigation and root cause analysis programmes; and using safety signs and labels on site.

Research limitations/implications

There is a lack of information and published studies regarding the links between LC and safety, especially in the Middle East. This paper is limited to the perceptions and geographical boundaries; therefore, it cannot be generalised. However, it could form the basis for useful comparison in the future. Triangulation research method could also be used in future research to minimise the bias and validate the conclusions.

Practical implications

The findings of this paper will stress professionals and construction companies in Gaza to reconsider their behaviour towards using LC techniques. The findings of this paper will aid them to shift their attention and resources towards including LC techniques in their plans to reduce the causes of accidents on construction sites.

Social implications

The findings of this paper will encourage professionals and construction companies in Gaza to reconsider their behaviour towards using LC techniques. The findings will also aid them to shift their attention and resources towards including LC techniques in their plans to reduce and/or avoid the causes of accidents on construction.

Originality/value

Because of the lack of published works that are specific to the Middle East, the authors believe that the originality lies in the paper’s serious attempt to explore the application level of the LC concept to safety in this part of the world. This paper contributes to a better understanding of the applicability of LC techniques in terms of accidents reduction. Findings from this paper provide a clear picture of the current status of using LC techniques to reduce accidents in the Gazan construction projects which drive them to investigate the main barriers and try to overcome them.

Details

Journal of Financial Management of Property and Construction , vol. 24 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 3 February 2020

Adib Amany, Katayoon Taghizade and Esmatullah Noorzai

This paper aims to increase the integrity of the planning process with the executive process by simulating the Last Planner System (LPS) technique using building information…

Abstract

Purpose

This paper aims to increase the integrity of the planning process with the executive process by simulating the Last Planner System (LPS) technique using building information modeling.

Design/methodology/approach

A five-dimensional model was prepared, and after specifying the number of physical conflicts on the plans, all the scenarios of the starting points in the expert contractors’ plans were analyzed. Accordingly, the best scenario was determined by LPS technique. To assess the performance of the study, it was implemented on several tasks of a construction project.

Findings

The results of this research indicate that if this method is used in the planning process, the time conflicts between the expert contractors who are in the critical path are reduced, and the total delay of the scheduled time reaches zero. In addition, the conflicts between contractors whose suspension will cause no incentive and increase the daily cost overruns will reduce to the lowest point.

Originality/value

By simulating LPS in the planning process, time-physical conflicts are considered at the lowest point. Using this approach, conflicts are detected before the execution process, resulting in a significant reduction in the delays and cost overruns in construction projects.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 28 February 2023

Yanqing Fang, Shang Gao, Yanwu Jiang and Shuquan Li

Building information modelling (BIM), lean construction (LC) and prefabricated housing construction (PHC) have individually aroused great attention from academia and industry…

534

Abstract

Purpose

Building information modelling (BIM), lean construction (LC) and prefabricated housing construction (PHC) have individually aroused great attention from academia and industry. However, the integration of LC and BIM in PHC projects has not been sufficiently explored. This study aims to assess the current status of the implementation of BIM and LC in China’s PHC sector given, firstly, that China is a developing country characterised by the world’s largest population and a huge housing market, and secondly, that although China’s PHC is strongly supported by the government, the adoption of BIM and LC in PHC varies.

Design/methodology/approach

A mixed approach (questionnaire survey and interviews) is adopted in this study. A total of 127 valid questionnaires were collected. This is followed by interviewing 12 interviewees who are key stakeholders in PHC and hold managerial positions.

Findings

The findings of the questionnaire survey show that BIM is more prevalent than LC in PHC projects in China. In addition, the adoption of LC exhibits more maturity in stages associated with production and manufacturing, and logistics and transportation, whereas BIM has seen wider adoption in design and construction. The interviews validated the factors that influence the implementation of BIM and LC in PHC projects in China.

Originality/value

The study uses a strengths, weaknesses, opportunities and threats analysis framework to clarify the opportunities, threats, strengths and weaknesses of BIM and LC in China’s PHC and proposes strategies.

Details

International Journal of Lean Six Sigma, vol. 14 no. 7
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 26 May 2023

Sina Moradi and Piia Sormunen

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…

2782

Abstract

Purpose

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.

Design/methodology/approach

A systematic literature review was conducted to fulfill the purpose of this study.

Findings

The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.

Originality/value

The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 October 2023

Mohamed Saad Bajjou and Anas Chafi

Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do…

Abstract

Purpose

Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do exist in the construction industry, the research topic related to LC implementation is still unexplored due to the scarcity of validated assessment frameworks. This study aims to provide the first attempt in developing a structural model for successful LC implementation.

Design/methodology/approach

This study developed a Lean construction model (LCM) by critically reviewing seven previous LC frameworks from different countries, defining 18 subprinciples grouped into 6 major principles and formulating testable hypotheses. The questionnaire was pre-tested with 12 construction management experts and revised by 4 specialized academics. A pilot study with 20 construction units enhanced content reliability. Data from 307 Moroccan construction companies were collected to develop a measurement model. SPSS V. 26 was used for Exploratory Factor Analysis, followed by confirmatory factor analysis using AMOS version 23. Finally, a structural equation model statistically assessed each construct's contribution to the success of LC implementation.

Findings

This work led to the development of an original LCM based on valid and reliable LC constructs, consisting of 18 measurement items grouped into 6 LC principles: Process Transparency, People involvement, Waste elimination, Planning and Continuous improvement, Client Focus and Material/information flow and pull. According to the structural model, LC implementation success is positively influenced by Planning and Scheduling/continuous improvement (β = 0.930), followed by Elimination of waste (β = 0.896). Process transparency ranks third (β = 0.858). The study demonstrates that all these factors are mutually complementary, highlighting a positive relationship between LC implementation success and the holistic application of all LC principles.

Originality/value

To the best of the authors’ knowledge, this study is the first attempt to develop a statistically proven model of LC based on structural equation modelling analysis, which is promising for stimulating construction practitioners and researchers for more empirical studies in different countries to obtain a more accurate reflection of LC implementation. Moreover, the paper proposes recommendations to help policymakers, academics and practitioners anticipate the key success drivers for more successful LC implementation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Mughees Aslam, Edmund Baffoe-Twum and Sohail Malik

Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the…

Abstract

Purpose

Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the construction sector of Pakistan, it has not been extensively explored. This study aims to address this knowledge gap by identifying and predicting current lean practices and assessing the strengths and weaknesses of LC implementation in Pakistan.

Design/methodology/approach

Using robust statistical methods to analyze 92 valid responses, the study reveals that approximately 54% of lean practices are currently in use in the construction industry of Pakistan, with a population mean ranging from 52.7% to 55.6%.

Findings

Surprisingly, the research identifies instances where some construction firms in Pakistan are implementing LC practices, even though they have only a limited understanding of its underlying principles. Notably, certain subprinciples, such as visual management, top management commitment to change, employee training, process cycle time reduction and production optimization, are less integrated within the construction industry. Exploring the possibility of implementing LC, recommendations for strategies to implement LC in Pakistan are suggested, aligning with the conceptual model proposed by the researchers.

Originality/value

The novelty of this work offers insights that can serve as a comprehensive guide for developing nations. It provides a structured approach to assess and benchmark LC practices, which, in turn, can contribute to a more efficient and effective construction industry. Moreover, the strategies proposed in this research can aid developing countries in the efficient implementation of LC. This will have a positive implication for both economic and developmental outcomes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2023

Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…

Abstract

Purpose

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.

Design/methodology/approach

Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.

Findings

Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.

Practical implications

This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.

Originality/value

This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Content available
Article
Publication date: 12 April 2023

Arpit Singh, Vimal Kumar, Ankesh Mittal and Pratima Verma

This study aims to set out to identify and evaluate potential obstacles to successfully implementing lean construction (LC) as a result.

Abstract

Purpose

This study aims to set out to identify and evaluate potential obstacles to successfully implementing lean construction (LC) as a result.

Design/methodology/approach

Several indicators were recognized as major obstacles following an exhaustive assessment of the literature and a multicriteria decision analysis based on the analytic hierarchy process (AHP) of information obtained from a questionnaire survey that was directed to practitioners in the Indian construction industry.

Findings

The results of this AHP model suggest that “Managerial” and “Inadequate resources” categories with a priority weight of “0.361” and “0.309” have the highest levels of influence, respectively, while “Inadequate knowledge” and “just in time (JIT)” categories with a priority weight of “0.053” and “0.034” have the lowest levels of influence, respectively.

Research limitations/implications

Construction companies can use the study’s findings as a guide to determine whether they are ready to embrace LC, learn more about the components needed for implementation or investigate any challenges that may arise. These businesses can then create plans to promote the adoption and application of the lean philosophy.

Originality/value

The Indian construction industry may see great success with LC management initiatives. LC concepts have been adopted by many nations, but during the past 20 years, there has only appeared to be a limited amount of lean implementation in the Indian construction industry. It seems that several structural and cultural barriers are preventing its effective implementation. Organizations will not be able to determine what improvement efforts are required, where these efforts should be directed or which initiatives could provide the best outcomes if they are unaware of the elements that influence the effective implementation of LC.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 1 March 1974

Tom Schultheiss, Lorraine Hartline, Jean Mandeberg, Pam Petrich and Sue Stern

The following classified, annotated list of titles is intended to provide reference librarians with a current checklist of new reference books, and is designed to supplement the…

Abstract

The following classified, annotated list of titles is intended to provide reference librarians with a current checklist of new reference books, and is designed to supplement the RSR review column, “Recent Reference Books,” by Frances Neel Cheney. “Reference Books in Print” includes all additional books received prior to the inclusion deadline established for this issue. Appearance in this column does not preclude a later review in RSR. Publishers are urged to send a copy of all new reference books directly to RSR as soon as published, for immediate listing in “Reference Books in Print.” Reference books with imprints older than two years will not be included (with the exception of current reprints or older books newly acquired for distribution by another publisher). The column shall also occasionally include library science or other library related publications of other than a reference character.

Details

Reference Services Review, vol. 2 no. 3
Type: Research Article
ISSN: 0090-7324

Article
Publication date: 14 July 2022

Lixuan Jiang, Hua Zhong, Jianghong Chen, Jiajia Cheng, Shilong Chen, Zili Gong, Zhihui Lun, Jinhua Zhang and Zhenmin Su

The construction industry is facing challenges not only for workers' mobility in the pandemic situation but also for Lean Construction (LC) practise in responding to the…

Abstract

Purpose

The construction industry is facing challenges not only for workers' mobility in the pandemic situation but also for Lean Construction (LC) practise in responding to the high-quality development during the post-pandemic. As such, this paper presents a construction workforce management framework based on LC to manage both the emergency goal in migrant worker management and the long-term goal in labour productivity improvement in China.

Design/methodology/approach

The framework is created based on the integrated culture and technology strategies of LC. A combination of qualitative and quantitative methods is taken to explore factors influencing the mobility of construction workers and to measure labour productivity improvement. The case study approach is adopted to demonstrate the framework application.

Findings

For method application, a time-and-motion study and Percent Plan Complete indicator are proposed to offer labour productivity measurements of “resources efficiency” and “flow efficiency”. Moreover, the case study provides an industry level solution for construction workforce management and Lean Construction culture shaping, as well as witnesses the LC culture and technology strategies alignment contributing to LC practise innovation.

Originality/value

Compared with previous studies which emphasised solely LC techniques rather than socio-technical system thinking, the proposed integration framework as well as implementation of “Worker's Home” and “Lean Work Package” management models in the COVID-19 pandemic contribute to new extensions of both the fundamental of knowledge and practise in LC.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 2000