To view the access options for this content please click here
Article
Publication date: 3 July 2017

L. Ebrahimnejad, K.D. Janoyan, D.T. Valentine and P. Marzocca

The application of reduced order models (ROMs) in the aerodynamic/aeroelastic analysis of long-span bridges, unlike the aeronautical structures, has not been extensively…

Abstract

Purpose

The application of reduced order models (ROMs) in the aerodynamic/aeroelastic analysis of long-span bridges, unlike the aeronautical structures, has not been extensively studied. ROMs are computationally efficient techniques, which have been widely used for predicting unsteady aerodynamic response of airfoils and wings. This paper aims to discuss the application of a reduced order computational fluid dynamics (CFD) model based on the eigensystem realization algorithm (ERA) in the aeroelastic analysis of the Great Belt Bridge (GBB).

Design/methodology/approach

The aerodynamic impulse response of the GBB section is used to construct the aerodynamic ROM, and then the aerodynamic ROM is coupled with the reduced DOF model of the system to construct the aeroelastic ROM. Aerodynamic coefficients and flutter derivatives are evaluated and compared to those of the advanced discrete vortex method-based CFD code.

Findings

Results demonstrate reasonable prediction power and high computational efficiency of the technique that can serve for preliminary aeroelastic analysis and design of long-span bridges, optimization and control purposes.

Originality/value

The application of a system identification tool like ERA into the aeroelastic analysis of long-span bridges is performed for the first time in this work. Authors have developed their earlier work on the aerodynamic analysis of long-span bridges, published in the Journal of Bridge Engineering, by coupling the aerodynamic forces with reduced DOF of structural system. The high computational efficiency of the technique enables bridge designers to perform preliminary aeroelastic analysis of long-span bridges in less than a minute.

Details

Engineering Computations, vol. 34 no. 5
Type: Research Article
ISSN: 0264-4401

Keywords

To view the access options for this content please click here
Article
Publication date: 17 July 2009

Latif Ebrahimnejad and Reza Attarnejad

The purpose of this paper is to introduce a novel approach to solving linear systems arising from applying a Boundary Element Method (BEM) to elasticity problems.

Abstract

Purpose

The purpose of this paper is to introduce a novel approach to solving linear systems arising from applying a Boundary Element Method (BEM) to elasticity problems.

Design/methodology/approach

The key idea is based on using wavelet transforms as a tool to change dense and fully populated matrices of BEM systems into sparse matrices. Wavelets are then used again to produce an algorithm to solve the resultant sparse linear systems. The wavelet transformation part of the method can be added as a black box to existing BEM codes.

Findings

Numerical results focusing on the sensitivity of the solution for various physical variables to the thresholding parameters, and savings in computer time and memory are presented. The results show that the proposed method is efficient for large problems.

Research limitations/implications

Application of the proposed method is restricted to problems with number of DOF equal to an integer power of 2.

Originality/value

The novel algorithm to solve transformed algebraic linear equations uses NS‐form of the modified matrix, taking the advantage of the hierarchical nature of Multi‐Resolution Analysis (MRA) to decompose a parent system into descendant systems with reduced size. These smaller systems are then solved iteratively using generalized minimal residual method.

Details

Engineering Computations, vol. 26 no. 5
Type: Research Article
ISSN: 0264-4401

Keywords

To view the access options for this content please click here
Book part
Publication date: 5 October 2018

Nima Gerami Seresht, Rodolfo Lourenzutti, Ahmad Salah and Aminah Robinson Fayek

Due to the increasing size and complexity of construction projects, construction engineering and management involves the coordination of many complex and dynamic processes…

Abstract

Due to the increasing size and complexity of construction projects, construction engineering and management involves the coordination of many complex and dynamic processes and relies on the analysis of uncertain, imprecise and incomplete information, including subjective and linguistically expressed information. Various modelling and computing techniques have been used by construction researchers and applied to practical construction problems in order to overcome these challenges, including fuzzy hybrid techniques. Fuzzy hybrid techniques combine the human-like reasoning capabilities of fuzzy logic with the capabilities of other techniques, such as optimization, machine learning, multi-criteria decision-making (MCDM) and simulation, to capitalise on their strengths and overcome their limitations. Based on a review of construction literature, this chapter identifies the most common types of fuzzy hybrid techniques applied to construction problems and reviews selected papers in each category of fuzzy hybrid technique to illustrate their capabilities for addressing construction challenges. Finally, this chapter discusses areas for future development of fuzzy hybrid techniques that will increase their capabilities for solving construction-related problems. The contributions of this chapter are threefold: (1) the limitations of some standard techniques for solving construction problems are discussed, as are the ways that fuzzy methods have been hybridized with these techniques in order to address their limitations; (2) a review of existing applications of fuzzy hybrid techniques in construction is provided in order to illustrate the capabilities of these techniques for solving a variety of construction problems and (3) potential improvements in each category of fuzzy hybrid technique in construction are provided, as areas for future research.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

To view the access options for this content please click here
Article
Publication date: 9 May 2016

Maedeh Rezaeisaray, Sadoullah Ebrahimnejad and Kaveh Khalili-Damghani

The purpose of this paper is to determine the criteria weights of outsourcing and their key role in ranking outsourcing suppliers.

Abstract

Purpose

The purpose of this paper is to determine the criteria weights of outsourcing and their key role in ranking outsourcing suppliers.

Design/methodology/approach

A new hybrid multi-criteria decision-making approach merges three tools, namely, decision making trial and evaluation (DEMATLE), fuzzy analytic network process (FANP) and ordinal/cardinal data envelopment analysis (DEA) model. Afterwards, experts’ opinions were gathered from a Pipe and Fittings company. Finally, their opinions were incorporated in three-stage approach for outsourcing suppliers’ selection.

Findings

The findings of this study show that among the selective criteria for outsourcing, business development, focus on basic activities and order delays are the three most important criteria. Also, the proposed approach ranks suppliers to facilitate decision making for selection.

Research limitations/implications

The number of suppliers, selection criteria and the number of members of the respondents’ team have been identified as some of the limitations of the present study.

Practical implications

The study has significant and practical implications for the managers and for the organizations which have to choose top suppliers, particularly in the case of dealing with numerous and qualitative/quantitative criteria.

Originality/value

This paper proposed a new three-stage approach that incorporates outputs of previous as inputs of next stage to increasing results accuracy. Also, it showed that by incorporating results of FANP method into DEA model, key role of experts’ opinions as a qualitative and quantitative criteria can be caused by increasing flexibility of decision process.

Details

Journal of Modelling in Management, vol. 11 no. 2
Type: Research Article
ISSN: 1746-5664

Keywords

To view the access options for this content please click here
Article
Publication date: 19 February 2021

Masoumeh Nabizadeh, Mohammad Khalilzadeh, Sadoullah Ebrahimnejad and Mohammad Javad Ershadi

The activities of the oil industry from discovery to distribution of oil products have adverse effects on human and environment. Thus, the companies that are active in…

Abstract

Purpose

The activities of the oil industry from discovery to distribution of oil products have adverse effects on human and environment. Thus, the companies that are active in this industry should identify and manage their risks. The purpose of this paper is to prioritize the identified risks based on different measures such as cost, occurrence, etc. Then, selecting the most important corrective actions using goal-programming approach is another objective of this study.

Design/methodology/approach

To identify the health, safety and environment (HSE) risks, the Fuzzy Delphi method was used. The failure mode and effects analysis (FMEA) and fuzzy Vlse Kriterijumsk Optimizacija Kompromisno Resenje (VIKOR) methods covering the deficits of FMEA were used to rank the HSE risks. Unlike similar researches, in the proposed FMEA–VIKOR method, the risk priority number was not calculated. In addition to severity, occurrence and detection, the parameters such as time, cost and quality, being considered for ranking the risks, were weighted by the Eigenvector method. Then, a fuzzy goal-programming model was developed for determining the best solutions of risk response.

Findings

The research findings indicated that the most important risks include fire and blast because of tank and pipeline, leakage of connections and pipelines and industrial waste. Also, the most important risk responses include using and strengthening the alarm and fire extinguishing systems, using fiberglass tanks to prevent pipeline corrosion, using modern technology to have more efficient oil refining.

Originality/value

The main contribution of this paper is using hybrid approach of FMEA–VIKOR for risk ranking by considering different measures such as time, cost and quality besides severity, occurrence and detection. Providing a fuzzy goal-programming framework for determining the main risk responses is another value for this research.

Details

Journal of Engineering, Design and Technology , vol. 19 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

To view the access options for this content please click here
Article
Publication date: 2 June 2020

Mohammad Khalilzadeh, Rose Balafshan and Ashkan Hafezalkotob

The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects.

Abstract

Purpose

The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects.

Design/methodology/approach

This paper consists of several sections. In the first section, 19 common potential risks in the projects of Pars Oil and Gas Company were finalized in six groups using the Lawshe validation method. These factors were identified through previous literature review and interviews with experts. Then, using the “best-worst multi-criteria decision-making” method, the study measured the weights associated with the performance evaluation indicators of each risk. Consequently, failure mode and effects analysis (FMEA) and the grey relational analysis (GRA)-VIKOR mixed method were used to rank and determine the critical risks. Finally, to assign response strategies to each critical risk, a zero-one multi-objective mathematical programming model was proposed and developed Epsilon-constraint method was used to solve it.

Findings

Given the typical constraints of projects which are time, cost and quality, of the projects that companies are often faced with, this study presents the identified risks of oil and gas projects to the managers of the oil and gas company in accordance with the priority given in the present research and the response to each risk is also suggested to be used by managers based on their organizational circumstances.

Originality/value

This study aims at qualitative management of cost risks of oil and gas projects (case study of Pars Oil and Gas Company) by combining FMEA, best worst and GRA-VIKOR methods under fuzzy environment and Epsilon constraints. According to studies carried out in previous studies, the simultaneous management of quantitative and qualitative cost of risk of oil and gas projects in Iran has not been carried out and the combination of these methods has also been innovated.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

To view the access options for this content please click here
Book part
Publication date: 5 October 2018

Olubukola Tokede, Adam Ayinla and Sam Wamuziri

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the…

Abstract

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different concept selection methods that were considered for drilling operations at the Trym field in Norway. The construction of drilling rigs is a capital-intensive process, and it involves high levels of economic risk. These risks can be broadly categorised as aleatoric (i.e. those related to chance) and epistemic (i.e. those related to knowledge). Evaluating risks in the investment appraisal process tends to be a complicated process. Project risks are evaluated using Monte Carlo simulation (MCS) and are based on the fuzzy analytic hierarchy process (AHP). MCS provides a useful means of evaluating variabilities (i.e. aleatoric risks) in oil drilling operations. However, many of the economic risks in oil drilling processes are unanticipated, and, in some cases, are not readily expressible in quantitative values. The fuzzy AHP is therefore used to appraise the qualitatively defined indirect revenues comprising risks that affect future flexibilities, schedule certainty and health and safety performance. Both the Monte Carlo technique and the fuzzy AHP technique found that a cumulative revenue variation of up to 30% is possible in any of the considered drilling options. The fuzzy AHP technique estimates that the chances of profitability being less than NOK 1 billion over a five-year period is 0.5%, while the Monte Carlo technique estimates suggest a more conservative proportion of 10%. Overall, the fuzzy AHP technique is easy to use and flexible, and it demonstrates increased robustness and improved predictability.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

To view the access options for this content please click here
Article
Publication date: 8 October 2018

Sasan T. Khorasani, Maryam Keshtzari, Md Saiful Islam and Ramyar Feizi

The cost of pharmaceutical supply chain due to drug waste is one of the current major issues in health care. Drug waste associated with intravenous (IV) fluid form of…

Abstract

Purpose

The cost of pharmaceutical supply chain due to drug waste is one of the current major issues in health care. Drug waste associated with intravenous (IV) fluid form of medication is one of the crucial issues for many pharmacies. The purpose of this paper is to apply a cross-docking model to minimize the IV delivery lead time to reduce drug waste by scheduling staff in a local hospital’s inpatient pharmacy.

Design/methodology/approach

A mixed integer linear programming model is applied to the IV delivery system of a hospital. The parameters are selected based on the observations made in the inpatient pharmacy.

Findings

The result implies that cross-docking approach can be effectively applied to IV delivery system. In fact, the cross-docking optimization model employed in this case study reduces the IV delivery completion time of the inpatient pharmacy by 41 percent.

Research limitations/implications

The scope of this research is limited to the activities performed after IV preparation.

Practical implications

The application of cross-docking system in staff scheduling will be beneficial for health care organizations that aim to minimize medication waste.

Originality/value

The prime value of this study lies in the introduction of a cross-docking concept in an internal hospital ordering process. Cross-docking models are widely used in general supply chain systems; however, their application for specific activities inside hospitals is the novelty of this study, which can fill the research gap in terms of drug waste management within the inpatient pharmacy.

Details

International Journal of Health Care Quality Assurance, vol. 31 no. 8
Type: Research Article
ISSN: 0952-6862

Keywords

To view the access options for this content please click here
Article
Publication date: 2 November 2015

Xuelei Meng, Limin Jia, Wanli Xiang and Jie Xu

Train re-scheduling remains a longstanding challenge in railway operation. To design high-quality timetable in fuzzy environment, the purpose of this paper is to study…

Abstract

Purpose

Train re-scheduling remains a longstanding challenge in railway operation. To design high-quality timetable in fuzzy environment, the purpose of this paper is to study train re-scheduling problem under the fuzzy environment, in which the fuzzy coefficients of the constraint resources have the fuzzy boundaries.

Design/methodology/approach

Based on the improved fuzzy linear programming, the train re-scheduling model is constructed. Aiming at dealing with the fuzzy characteristics of the constraint coefficients value range boundaries, the description method of this kind of objective function is proposed and the solving approach is presented. The model has more adaptability to model a common train re-scheduling problem, in which some resources of the constraints are uncertain and have the characteristics of fuzziness and the boundaries of the resources are fuzzy.

Findings

Two numerical examples are carried out and it shows that the model proposed in this paper can describe the train re-scheduling problem precisely, dealing with the fuzzy boundaries of the fuzzy coefficients of the constraint resources. And the algorithm present is suitable to solve the problem. The approach proposed in this paper can be a reference for developers of railway dispatching system.

Originality/value

It is the first time to study train re-scheduling problem under the fuzzy environment, in which the fuzzy coefficients of the constraint resources have the fuzzy boundaries.

Details

Kybernetes, vol. 44 no. 10
Type: Research Article
ISSN: 0368-492X

Keywords

To view the access options for this content please click here
Article
Publication date: 16 November 2020

Phuong Thi Le, Nicholas Chileshe, Konstantinos Kirytopoulos and Raufdeen Rameezdeen

Despite the fact that extensive studies on public-private partnerships have focused on risk identification and classification, research still lacks concentration on…

Abstract

Purpose

Despite the fact that extensive studies on public-private partnerships have focused on risk identification and classification, research still lacks concentration on studying the latent structure of risks in build operate transfer (BOT) transportation projects, especially in developing countries. The research was carried out in Vietnam and this paper aims to explore the underlying relationships among risks in the context of BOT transportation projects.

Design/methodology/approach

A questionnaire survey was conducted to investigate the perception of stakeholders regarding the probability of occurrence and the severity of the impact of risks related to BOT transportation projects. Factor analysis was performed based on a total of 40 risks.

Findings

Seven risk groups were formed as a result of factor analysis, namely, “projects’ viability and political-regulatory risks”, “macroeconomic risks”, “projects’ feasibility study and market risks”, “financial risks”, “organization/coordination and force majeure risks”, “tolling, contractual, approvals risks” and “media and land expropriation risks”.

Originality/value

The research contributes to the current body of knowledge by providing deep insight into the structure of risks in BOT transportation projects in Vietnam through exploring the underlying relationships among risks, to form a latent risk structure from practical viewpoints. The findings are beneficial for involved stakeholders and policymakers to set up and propose suitable management strategies and related policies.

Details

Journal of Financial Management of Property and Construction , vol. 26 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

1 – 10 of 51