1 – 7 of 7Teemu Mikael Lappi, Kirsi Aaltonen and Jaakko Kujala
This paper aims to increase the current understanding of the connection between operational level information and communication technology (ICT) projects and national level…
Abstract
Purpose
This paper aims to increase the current understanding of the connection between operational level information and communication technology (ICT) projects and national level digital transformation by researching how project governance structures and practices are applied in an e-government context.
Design/methodology/approach
An elaborative qualitative study through public documentary analysis and empirical multi-case research on Finnish central government is used.
Findings
The study constructs a multi-level governance structure with three main functions and applies this in an empirical setting. The results also describe how different governance practices and processes, focusing on project portfolio management, are applied vertically across different organizational levels to connect the ICT projects with the national digitalization strategy.
Originality/value
This study integrates project governance and portfolio management knowledge into public sector digitalization, thus contributing to project management, e-government and ICT research streams by improving the current understanding on the governance of ICT projects as part of a larger-scale digitalization. This study also highlights perceived gaps between current governance practices and provides implications to managers and practitioners working in the field to address these gaps.
Details
Keywords
Laura Saukko, Kirsi Aaltonen and Harri Haapasalo
The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.
Abstract
Purpose
The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.
Design/methodology/approach
A theoretical construct of, referred in this study as integration capability framework is elaborated following a systematic literature review. Thereafter, an integration capability self-assessment model, based on maturity thinking, is derived from the theoretical framework. The self-assessment model is further developed and tested for validity within five inter-organizational project networks in cooperation with industry practitioners, representing construction, industrial engineering, and mining sectors.
Findings
The results show that inter-organizational projects can use the developed model in self-assessing the maturity levels of various integration mechanisms, thus the state of integration capability at any point in time during inter-organizational projects.
Originality/value
This study is an attempt to identify how the integration capability dimensions can be self-assessed in inter-organizational projects, through the maturity levels of various integration mechanisms. The results offer insights for both academics and project management practitioners.
Details
Keywords
Tommi Pauna, Jere Lehtinen, Jaakko Kujala and Kirsi Aaltonen
The aim of this research was to understand how governmental stakeholder engagement facilitates the sustainability of industrial engineering (IE) projects. A model for governmental…
Abstract
Purpose
The aim of this research was to understand how governmental stakeholder engagement facilitates the sustainability of industrial engineering (IE) projects. A model for governmental stakeholder engagement activities is presented.
Design/methodology/approach
The authors relied on a single-case study of a mining project in Northern Europe, where a novel collaboration and engagement approach with governmental stakeholders was piloted in the project's front-end phase. The analysis focused on the collaborative practices through which the IE project investor engaged governmental stakeholders during the project's front-end phase and how the engagement contributed to solving challenges in the early planning and permitting process and achieving project plans that balanced economic, social and environmental aspects.
Findings
The findings show how four collaborative engagement practices reduced uncertainty and equivocality related to the legal sustainability requirements, enabled the development of sustainable design solutions and overall accelerated the permitting process without compromising the quality of final project plans.
Practical implications
The findings can be used to plan governmental stakeholder engagement and understand related challenges that need to be overcome. The study highlights the need to develop established practices and guidelines for governmental stakeholder engagement.
Originality/value
This study complements prior research on stakeholder engagement and project sustainability by developing an understanding of how governmental stakeholder engagement can be a key mechanism enabling the sustainability of IE project's end product. This research contributes to stakeholder theory by elaborating on a new stakeholder role, intermediary stakeholder.
Details
Keywords
Kirsi Aaltonen and Virpi Turkulainen
In this study, we develop further understanding of how institutional change is created within a mature and local industry. In this pursuit, we examine how a collaborative large…
Abstract
Purpose
In this study, we develop further understanding of how institutional change is created within a mature and local industry. In this pursuit, we examine how a collaborative large project governance model was institutionalized at an industrial sector-level through both industry-level activities and “institutional projects”.
Design/methodology/approach
This study builds on the foundations of institutional fields and institutional change, suggesting that projects are not only shaped by their contexts but also produce institutional change themselves. We conducted extensive fieldwork on the institutionalization of a collaborative project governance model in Finland.
Findings
The findings illustrate how institutional change in governance of large and complex inter-organizational projects is created at the institutional field level. The institutionalized collaborative project governance model includes aspects of both relational and contractual governance. The change was facilitated by temporal links between the institutional projects as well as vertical links between the institutional projects and the field-level development programs.
Originality/value
This is one of the first studies to address how a collaborative large project governance model becomes the norm at the institutional field level beyond the boundaries of an individual project or organization.
Details
Keywords
Siraj Ahmed, Jukka Majava and Kirsi Aaltonen
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…
Abstract
Purpose
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.
Design/methodology/approach
A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).
Findings
The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.
Originality/value
Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.
Details
Keywords
Kirsi Aaltonen and Virpi Turkulainen
The purpose of this paper is to elaborate the understanding of socialization in the context of temporary operations and organizational settings, using project alliance – the most…
Abstract
Purpose
The purpose of this paper is to elaborate the understanding of socialization in the context of temporary operations and organizational settings, using project alliance – the most contemporary approach to the management of large and complex projects – as an example. In particular, the paper also assesses how informal and formal socialization mechanisms are used to facilitate relational capital in such a setting.
Design/methodology/approach
Data were collected by two case studies of complex infrastructure projects in a Northern European city. The analysis focuses on how socialization is managed across organizational interfaces within the alliance organization during the project tendering and development phase to create relational capital.
Findings
The findings indicate that significant emphasis is put on socialization in project alliances. However, while in the tendering phase both informal and formal socialization mechanisms are used to create relational capital; in the development phase informal socialization mechanisms are associated with higher levels of relational capital and formal socialization mechanisms are used to maintain the level of relational capital.
Originality/value
While operations and supply chain management research argues that socialization is critical to manage organizational interfaces and to create relational capital in buyer-supplier relationships, research has mainly focused on ongoing operations. This study complements the prior research by developing further insight into socialization in the context of temporary operations and organizational settings; such settings create a unique empirical context, posing different managerial challenges as the results also indicate.
Details
Keywords
Taha Karasu, Kirsi Aaltonen and Harri Haapasalo
Integrated project delivery (IPD) and building information modeling (BIM) have been discussed as prominent collaborative concepts in recent architecture, engineering and…
Abstract
Purpose
Integrated project delivery (IPD) and building information modeling (BIM) have been discussed as prominent collaborative concepts in recent architecture, engineering and construction (AEC) literature, thus recommended for more advanced value creation. However, they have been studied predominantly as discrete even though they are typically highly interrelated. This study aims to enhance collaboration in AEC projects by tracing recent trends in IPD and BIM literature by making sense of trends and by exploring how their interplay has been discussed and conceptualized.
Design/methodology/approach
This systematic literature review draws on Scopus and Web of Science as the primary databases. In total, 120 academic papers and review articles were sourced. Yet, the final sample includes 71 sources from the past decade (2011–2020), focusing on both IPD and BIM.
Findings
This study identifies 11 interrelated and overlapping themes that are indicative of trends in the recent IPD and BIM literature. This research found that among the identified themes, the clusters of sustainability, transformation and increasing the competence level of staff in the AEC industry, in addition to the concept of quality, require more extensive research in the context of IPD and BIM. Additionally, this study identifies four different approaches to the interplay of IPD and BIM, indicating an absence of scholarly consistency.
Originality/value
Based on the systematic analysis of the recent literature, this study indicates that IPD and BIM have several joint fundamental cornerstones. It is evident that both concepts support the implementation of each other. The success of implementing either one is strongly related to the other. Additionally, we have not found earlier systematic literature reviews that examine the interplay between IPD and BIM in the recent AEC literature.
Details