Search results

1 – 10 of 179
Article
Publication date: 30 June 2022

Nathaniel Ayinde Olatunde, Idienumah Monday Fidelis, Imoleayo Abraham Awodele and Bosede Olajumoke Adebayo

The study assessed the stakeholders prioritization of key performance indicators (KPIs) on public and private tertiary educational projects in Osun State, Nigeria intending to…

Abstract

Purpose

The study assessed the stakeholders prioritization of key performance indicators (KPIs) on public and private tertiary educational projects in Osun State, Nigeria intending to enhance their performance.

Design/methodology/approach

The study used a total enumeration survey to purposively select built environment professionals working in the Physical Planning and Development Unit (PPDU) and procurement units of 17 tertiary educational institutions (7public and 10 private) in Osun State Nigeria for data collection. A quantitative research approach was adopted for the study using a questionnaire. A total of 102 questionnaires were retrieved from the respondents and used for analysis. Analysis of data was done using frequency, percentile, mean score (MS), Cronbach's Alpha coefficient, t-test, and Analysis of variance (ANOVA).

Findings

The study found that in the overall opinion of the respondents the most prioritized KPIs for tertiary educational projects are for the project to meet specifications (MS = 4.17), the project must be on time (MS = 4.01), and efficient use of resources (MS = 3.96). The important KPIs for the public tertiary educational projects is that the project should meet specifications (MS = 4.08), deliver the projects on time (MS = 3.96), and be under cost (MS = 3.84). While, the most prioritized KPIs for private tertiary educational projects are for the project to meet specifications (MS = 4.25), efficient use of resources (MS = 4.14), on time, and doing the right thing (effectiveness) (MS = 4.06) each. More findings indicated that there is no significant difference in the manner built environment professionals prioritized KPIs. However, there is only a 7% significant difference in the manner professionals working in the public and private tertiary educational institutions in Nigeria ranked KPIs.

Practical implications

There is a significant difference in the ways and manner built environment professionals working with the public and private tertiary educational institutions in Nigeria view resource utilization on their projects. As such, working environment either as public or private has a significant impact on resource utilization for tertiary educational construction projects.

Originality/value

The study compared opinions of professionals working with public and private tertiary educational institutions on KPIs to enhance project performance.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 29 February 2024

Wenque Liu, Albert P.C. Chan, Man Wai Chan, Amos Darko and Goodenough D. Oppong

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and…

Abstract

Purpose

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and particularity. Employing key performance indicators (KPIs) facilitates the monitoring of HPs to advance their successful delivery. This study aims to comprehensively investigate the KPIs for hospital planning and construction (HPC).

Design/methodology/approach

The KPIs for HPC were identified through a systematic review. Then a comprehensive assessment of these KPIs was performed utilizing a meta-analysis method. In this process, basic statistical analysis, subgroup analysis, sensitive analysis and publication bias analysis were performed.

Findings

Results indicate that all 27 KPIs identified from the literature are significant for executing HPs in P&C phases. Also, some unconventional performance indicators are crucial for implementing HPs, such as “Project monitoring effectiveness” and “Industry innovation and synergy,” as their high significance is reflected in this study. Despite the fact that the findings of meta-analysis are more trustworthy than those of individual studies, a high heterogeneity still exists in the findings. It highlights the inherent uncertainty in the construction industry. Hence, this study applied subgroup analysis to explore the underlying factors causing the high level of heterogeneity and used sensitive analysis to assess the robustness of the findings.

Originality/value

There is no consensus among the prior studies on KPIs for HPC specifically and their degree of significance. Additionally, few reviews in this field have focused on the reliability of the results. This study comprehensively assesses the KPIs for HPC and explores the variability and robustness of the results, which provides a multi-dimensional perspective for practitioners and the research community to investigate the performance of HPs during the P&C stages.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 July 2023

Neeraj Kumar, Mohit Tyagi and Anish Sachdeva

This study aims to discover the key performance indicators (KPIs) of the agricultural cold supply chain (ACSC) and analyze their consequences on the performance of ACSC within the…

Abstract

Purpose

This study aims to discover the key performance indicators (KPIs) of the agricultural cold supply chain (ACSC) and analyze their consequences on the performance of ACSC within the bounds of Indian topography.

Design/methodology/approach

The KPIs have been explored based on the literature review both in global and Indian context and domain expert's opinions. The interdependency characteristics and cause–effect relationship among the KPIs have been analyzed using a fuzzy decision-making trial and evaluation laboratory (f-DEMATEL) approach.

Findings

The findings extracted from the empirical assessment of the problem find strong compliance with the notions of theoretical model assessment. The results highlight that the cost of product waste and operating and performance costs are the two most important performance indicators of an Indian ACSC. Furthermore, governmental policies and regulations and the effectiveness of cold chain (CC) equipment also have a high degree of influencing characteristics on ACSC performance.

Research limitations/implications

To connect the study with practicalities, the assessment of the KPIs is allied with real-time practices by clustering the beliefs of Indian professionals. Therefore, the decision-making behavior of the experts might be influenced by geographical constraints. However, the key findings provide advantages to the ACSC players, a bright hope for future food security and a significant profit for farmers.

Originality/value

The presented paper encompasses various aspects of the ACSC, including theoretical and empirical perspectives exercised to contemplate the system dynamics, which inculcates the essence of the associated practicalities. Thus, this study has various practical contributions relevant to managerial and societal perspectives.

Details

Journal of Agribusiness in Developing and Emerging Economies, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-0839

Keywords

Article
Publication date: 12 March 2024

Pornwasin Sirisawat, Tipavinee Suwanwong Rodbundith and Narat Hasachoo

This study aims to investigate and classify the hospital logistics key performance indicators (KPIs) using the context of public hospitals in remote areas.

Abstract

Purpose

This study aims to investigate and classify the hospital logistics key performance indicators (KPIs) using the context of public hospitals in remote areas.

Design/methodology/approach

The public hospitals in northern Thailand were selected for the case study. The questionnaire was developed and used to collect data from hospital logistics experts. Then, the analytic hierarchy process (AHP) method was used to evaluate the hospital logistics KPIs in each dimension.

Findings

This research found that the procurement management dimension is ranked highest. Information and technology management is the last rank in the hospital logistics KPIs used for public hospitals in remote areas.

Research limitations/implications

The public hospitals located in northern Thailand were selected for the case study. Fuzzy multi-criteria decision-making methods can be used to reduce the vagueness of the values.

Practical implications

The results from this study can be a guideline for hospitals to improve the efficiency of their logistics operations.

Social implications

The decision-makers in the hospital can use these results to improve the hospital’s logistics performance in the future, which could help increase the service level and the safety of the patients.

Originality/value

The hospital logistics KPIs were revised, and the crucial KPIs were prioritized for improving the hospital logistics using the AHP method.

Details

International Journal of Pharmaceutical and Healthcare Marketing, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1750-6123

Keywords

Article
Publication date: 27 March 2024

Erfan Anjomshoa

Key performance indicators (KPIs) play a pivotal role in evaluating the level of success of an organization in achieving its business objectives. The objective of the current…

30

Abstract

Purpose

Key performance indicators (KPIs) play a pivotal role in evaluating the level of success of an organization in achieving its business objectives. The objective of the current research is to identify and prioritize effective KPIs in branding products and construction projects, which contribute to the success of construction companies in a competitive environment.

Design/methodology/approach

The present research is of an inferential, descriptive and survey nature. In this study, we identified the influential key performance indicators of construction companies in branding products and construction projects for success in a competitive environment through a literature review and expert opinions. The data were collected using a questionnaire, and a combination of the one-sample t-test method with a 95% confidence level and the fuzzy multiple attribute decision-making (FMADM) method was employed for analysis.

Findings

The results indicate that the most influential key performance indicators for construction companies in branding products and construction projects for success in a competitive environment are, in order of significance, the following indices: “Marketing and Advertising,” “Financial,” “Creativity,” “Technical and Operational” and “Social and Political.”

Originality/value

The present research examines the importance of branding construction products and projects for the success of construction companies by improving their business objectives and utilizing key performance indicators throughout the product lifecycle (production and construction). This study provides solutions on how construction companies can increase their competitive advantage through branding and achieve long-term success in the global construction industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 22 May 2023

P.K. Nandram, A.J. Brouwer and H.P.A.J. Langendijk

This paper aims to investigate whether managers use impression management through the presentation of non-financial information in an integrated reporting setting.

3092

Abstract

Purpose

This paper aims to investigate whether managers use impression management through the presentation of non-financial information in an integrated reporting setting.

Design/methodology/approach

The authors performed an experiment with experienced professional controllers and part-time students enrolled in the executive master’s degree in finance and control at universities in the Netherlands. In this experiment, we manipulated the financial performance to test if managers present non-financial information differently based on the firm’s financial performance.

Findings

This study found that impression management is not applied by including or excluding non-financial key performance indicators (KPIs) in the integrated report, but by using more prominent presentation forms for positive non-financial performance and non-prominent ones for negative non-financial performance. However, the use of impression management through the presentation form decreased when the firms’ financial performance was positive. In that instance, this study noted that managers statistically significantly more often decided to present poor non-financial performance in a prominent presentation format in comparison to managers who were not aware of the financial performance.

Research limitations/implications

A limitation of this paper is that the authors focused on only two impression management strategies: opportunistic/under-reporting and the presentation form. This analysis shows that the use of impression management mainly seems to occur through the presentation format. Future research could investigate other impression management strategies in an integrated reporting setting.

Practical implications

The results of this study are of importance for users of integrated reports, because it will provide more insight into whether firms are truly transparent in their integrated reports. Furthermore, the theoretical implication of this study is relevant to regulatory authorities, because it sheds light on the different forms of impression management used in integrated reporting and the influence of positively or negatively performing KPIs on the decisions of preparers of integrated reports.

Originality/value

Therefore, in this study, the authors add to prior literature by investigating the concept of impression management in an integrated reporting setting. More specifically, the authors perform an experiment and focus on different forms of impression management (the presentation format and under-reporting) through non-financial KPIs in an integrated reporting setting and link it to firm financial performance.

Details

Journal of Financial Reporting and Accounting, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1985-2517

Keywords

Article
Publication date: 13 June 2023

Justyna Bekier and Cristiana Parisi

This study examines how circular economy (CE) performance indicators are constructed in an urban context characterised by a multitude of conflicting interests and visions of urban…

Abstract

Purpose

This study examines how circular economy (CE) performance indicators are constructed in an urban context characterised by a multitude of conflicting interests and visions of urban development. It explores the process of constructing a shared consensus about the performance indicators in conditions of low contractibility, where intervention objectives and outcomes are not easily quantifiable because the object is ambiguous and cannot be fully specified in advance.

Design/methodology/approach

The construction of performance indicators at the urban level is examined through the lens of an action net. Using group interviews, observations and documentary analysis, this study investigates the case of a CE initiative in the city of Milan.

Findings

The study demonstrates that in cases of low contractibility, the development of CE solutions requires actions that span across organisational boundaries, organised in an action net. As the action net unfolds, it is closely knotted with the construction of performance indicators, indicating a co-constitutive relationship between the two processes.

Originality/value

This interdisciplinary study contributes to the public sector accounting literature by exploring the complexity of performance indicator construction at the urban level. It further recognises performance measurement in cities as a dynamic and flexible process, in which the interconnected actions and involvement of multiple actants shape the composition of the indicators.

Details

Accounting, Auditing & Accountability Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0951-3574

Keywords

Article
Publication date: 25 December 2023

Justyna Bekier and Cristiana Parisi

Existing performance assessment frameworks, such as the Sustainable Development Goals (SDGs), struggle to incorporate diverse voices and representations of heterogeneous contexts…

Abstract

Purpose

Existing performance assessment frameworks, such as the Sustainable Development Goals (SDGs), struggle to incorporate diverse voices and representations of heterogeneous contexts. Cities, in particular, present a challenging context for sustainability performance assessment as they pursue new forms of governance based on the multiplicity of actors and inter-organisational collaboration. This study explores how sustainability performance accounts are created at the urban level within collaborative forms of governance and amidst the plethora of available devices for performance assessment.

Design/methodology/approach

This study adopts a case study approach. Qualitative methods are mobilised to study a large European project focused on the urban transition to a circular economy in six participating cities. The construction of sustainability performance accounts is studied via the Actor-Network Theory lens.

Findings

The study highlights that when it comes to sustainability assessment in city initiatives, existing performance assessment devices are adapted and modified to fit local needs and other sources of performance information are spontaneously mobilised to address the different dimensions of sustainability.

Originality/value

This study contributes to the public sector accounting literature by explaining the process of modifying existing devices for performance assessment to allow for the co-creation of accounts and by illuminating the spontaneous way in which performance information is generated and combined.

Details

Journal of Public Budgeting, Accounting & Financial Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1096-3367

Keywords

Article
Publication date: 21 November 2023

Tianyao Ping, Wei Pan and Zhiqian Zhang

Modular construction is an innovative method that enhances the performance of building construction projects. However, the performance of steel modular construction has not been…

Abstract

Purpose

Modular construction is an innovative method that enhances the performance of building construction projects. However, the performance of steel modular construction has not been systematically understood, and the existing measurement methods exhibit limitations in effectively addressing the features of steel modular building construction. Therefore, this study aims to develop a new performance measurement framework for systematically examining the performance of steel modular construction in building projects.

Design/methodology/approach

This study was conducted through a mixed-method research design that combines a comprehensive review of the state-of-the-art practices of construction performance measurement and a case study with a 17-story steel modular apartment building project in Hong Kong. The case project was measured with data collected from the project teams and other reliable channels, and the measurement practices and findings were referenced to establish a systematic performance measurement framework for steel modular construction.

Findings

Considering steel modular construction as a complex socio-technical system, a systematic performance measurement framework was developed, which considers the features of steel modular construction, focuses on the construction stage, incorporates the views of various stakeholders, integrates generic and specific key performance indicators and provides a benchmarking process. Multifaceted benefits of adopting steel modular construction were demonstrated with case study, including improved economic efficiency (e.g. nearly 10% cost savings), improved environmental friendliness (e.g. approximately 90% waste reduction) and enhanced social welfare (e.g. over 60% delivery trips reduction).

Originality/value

This paper extends the existing performance measurement methods with a new framework proposed and offers experience for future steel modular construction. The measured performance of the case project also contributes in-depth understanding on steel modular construction with benefits demonstrated. The study is expected to accelerate an effective uptake of steel modular construction in building projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 10 of 179