Search results
1 – 7 of 7Vikki McCall, Kenneth Gibb and Yang Wang
The ageing and disabled population is fast growing, which emphasises the need to effectively modify current homes and environments to support healthy ageing and increasingly…
Abstract
Purpose
The ageing and disabled population is fast growing, which emphasises the need to effectively modify current homes and environments to support healthy ageing and increasingly diverse health needs. This paper aims to bring together findings and analyses from three adaptations-focussed projects, drawing on perspectives from key stakeholders alongside the lived experiences of service users acquiring adaptations.
Design/methodology/approach
Following an Adaptations Framework developed from interviews and focus groups with older people and key stakeholders, the paper discusses barriers experienced by older people and front-line workers in receiving and delivering adaptations through all stages of the process.
Findings
This paper reveals how experiences around adaptations might diverge with unseen, hidden investment and need amongst individuals, and how conceptual and cost-focussed evidence gaps impact wider understandings of adaptations delivery. In so doing, this paper highlights how the adaptations process is perceived as a “fight” that does not work smoothly for either those delivering or receiving adaptations services.
Research limitations/implications
The paper suggests a systematic failure such that the adaptations process needs to be rehauled, reset and prioritised within social and public policy if the housing, health and social care sectors are to support healthy ageing and prepare for the future ageing population.
Originality/value
The paper brings together insights from key stakeholders alongside service users' experiences of adaptations to highlight key policy drivers and barriers to accessing and delivering adaptations.
Details
Keywords
Osamudiamen Kenneth Otasowie and Ayodeji Emmanuel Oke
The paper assessed the required drivers of mentoring practices in construction-related firms: a perspective of the quantity surveying (QS) firms in Nigeria with a view to…
Abstract
Purpose
The paper assessed the required drivers of mentoring practices in construction-related firms: a perspective of the quantity surveying (QS) firms in Nigeria with a view to providing possible drivers for effective mentoring relationships in the respective construction firms.
Design/methodology/approach
Survey design was used to assess the level of knowledge, mentoring concept adoption and the required drivers of mentoring relationships in construction-related firms. QS firms in Abuja, Nigeria were sampled through the use of semi-structured questionnaires. A total of 149 questionnaires were administered to principal partners, partners, senior quantity surveyors and quantity surveyors in QS firms in Abuja through personal delivery. A total of 142 of them were returned and found suitable for analysis, representing 95.30% effective response rate. Percentage, mean, Kruskal–Wallis and factor analyses were utilized for the analysis of the data.
Findings
The study revealed an appreciable knowledge of mentoring concept but not so much with the adoption in the respective firms. This connotes that there is a problem with the adoption of mentoring concept in construction-related firms despite knowledge of the concept. Also revealed by the study, are the required drivers of mentoring practices in construction-related firms.
Practical implications
The findings show the required drivers of mentoring practices in construction-related firms and the recommendations to further the adoption and implementation of these drivers to ensure mentoring practices thrive in construction-related firms in the country.
Originality/value
This paper reveals the required drivers of mentoring practices in Nigerian construction-related firms and provides ways through which the drivers can be implemented in the construction firms.
Details
Keywords
Igor Laine, Sami Saarenketo and Xiaotian Zhang
This chapter investigates the role of authentic leadership in international entrepreneurship. The authors examine how the four pillars of authentic leadership – self-awareness…
Abstract
This chapter investigates the role of authentic leadership in international entrepreneurship. The authors examine how the four pillars of authentic leadership – self-awareness, relational transparency, internalised moral perspective and balanced processing of information – can promote effective collaboration for cross-border social value creation in entrepreneurial ventures. Questions that the authors address are: How do we define ‘international’ entrepreneurship from the perspective of authentic leadership? Are new or different leadership qualities required for the ‘international’ dimension? What are international leadership values or/and qualities and how does the international context change what competencies are needed? The authors call for research to examine how leadership can be depersonalised and become collective rather than an individual trait.
Details
Keywords
Kenneth Lawani, Billy Hare, Michael Tong and Iain Cameron
Over 2.7 million workers are employed in the UK construction industry and with the fragmented nature of the construction sector; cases of poor mental health of workers are on the…
Abstract
Purpose
Over 2.7 million workers are employed in the UK construction industry and with the fragmented nature of the construction sector; cases of poor mental health of workers are on the increase. This upsurge in the number of workers experiencing poor mental health could directly impact construction safety with significant financial adverse consequences on employers and the UK economy. Studies have identified lapses within the construction sector emphasising the lack of transparency regarding reporting of mental health and well-being of construction workers due to the inadequate engagement from employers and the lack of genuine leadership commitment to tackle mental health.
Design/methodology/approach
This study adopted a non-probability purposive sampling strategy, using a self-selected sample. A self-administered questionnaire benchmarked against the mental health core and enhanced standards tools by the “Stevenson/Farmer review of mental health and employers” served as the basis for the methodology. A total of 106 industry managers from highways, construction, maritime, utilities, home building, rail and haulage/fleet were involved in this study.
Findings
The findings indicate that the industry is making good strides towards addressing mental health issues; poor mental health have significant financial burdens on businesses and the economy; some contractors have mental health initiatives and programmes in place; there is inconsistency of support available to employees; some contractors now integrate leadership training; the level of engagement vary based on the strategy and action plan adopted by organisations; different mechanisms are adopted for monitoring mental health issues, and there are cross-industry initiatives.
Research limitations/implications
A limitation of this study is the number of participants which is not representative of the entire UK construction workforce. Therefore, the findings from this study as much as it presents some understanding of employee mental health and well-being cannot be overtly generalised across multiple industries, different geographic regions or contexts.
Originality/value
Employers should have a clear representation of the mental health of their employees to help them understand what affects worker’s mental well-being and how they can support them. Disregarding the multifaceted causes of mental ill-health due to the perceived financial implications could be more devastating for the industry.
Details
Keywords
Yi Wang, Xiaopeng Deng and Hongtao Mao
This paper aims to explore the key risk factors affecting the Personnel Localization Management of international construction projects under the major public emergencies…
Abstract
Purpose
This paper aims to explore the key risk factors affecting the Personnel Localization Management of international construction projects under the major public emergencies represented by the novel coronavirus pneumonia pandemic (hereinafter COVID-19) and how the public emergency affected the Personnel Localization Management from three levels: staff turnover rate, the number of different personnel, the salary and performance of workers. The paper also helps to enhance the construction enterprises' response capacity of major public emergencies and provides a comprehensive framework of optimization strategies for the Personnel Localization Management of international construction projects (hereinafter projects).
Design/methodology/approach
The main research method of this paper is the case study, and ten representative international construction projects are selected for case study in China construction enterprises (hereinafter CCE). And this study used the failure mode and effects analysis (FMEA) and comparative analysis to find out all potential risk factors under the COVID-19 and analyze how the epidemic affects the Personnel Localization Management of projects which based on the primary data from 10 projects obtained through in-depth interviews and the secondary data from China First Metallurgical Group and Central South Construction Group's Overseas Enterprise.
Findings
The findings show that the outbreak of the major public emergencies not only greatly increased eight risk factors but also directly led to an increase in staff turnover rate. Meanwhile, the numbers of Chinese and local managers and workers are all affected, and an increase in the number and the salary performance of local workers can be reduced, to a certain extent, to the cost-to-output ratio of the projects. The findings would help construction enterprises better cope with Personnel Localization Management and enhance the response capacity of major public emergencies.
Research limitations/implications
This study will broaden researchers' horizons regarding “Personnel Localization Management under major public emergencies” and “risk factors of Personnel Localization Management in an international context.” Furthermore, construction enterprises looking for a better mechanism of Personnel Localization Management can benefit from research findings and lessons learned from the authors' case study during or before an outbreak of major public emergency. Lastly, the framework of optimization strategies for Personnel Localization Management can be used both for research purposes and practice issues in international construction projects.
Practical implications
The findings from the authors' case study offer the direction for international construction enterprises in China and other countries to formulate effective measures, strengthen overseas business and establish a crisis management mechanism for Personnel Localization Management under major public emergencies, and the findings provide emergency plans for projects to improve the public crisis handling capacity and respond to major public emergencies such as the COVID-19.
Social implications
This study analyzes the impact of the COVID-19 on the Personnel Localization Management of international construction projects from the perspective of personnel. This study provides a theoretical reference for the international construction industry to actively respond to major public emergencies. Besides, the research is conducive to improving the emergency response mechanism in the construction industry, and further promoting the high-quality and globalized development of international construction.
Originality/value
This study provides other researchers with a comprehensive understanding of the risk factors affecting the Personnel Localization Management of projects under the COVID-19 and insight for further research on localization management, risk management, and project management.
Details
Keywords
An in-depth literature review was undertaken to uncover (1) what are described as the desired outcomes for 20 minute neighbourhoods (20MNs) – the normatively based ends which…
Abstract
Purpose
An in-depth literature review was undertaken to uncover (1) what are described as the desired outcomes for 20 minute neighbourhoods (20MNs) – the normatively based ends which planners, architects and decision-makers want 20MNs to achieve; (2) the means (the mechanisms, levers, triggers and causal factors) that have to be correctly assembled and lined up for 20MNs to operate as intended and (3), in order to avoid naive environmental determinism, the behavioural changes required to support the operation of 20MNs even where the required configuration of means can be achieved. The content analysis was conducted following guidelines offered by the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) criteria.
Design/methodology/approach
Growing interest in the urban design concept of the “20MNs” has been greatly accelerated by the COVID-19 pandemic. It has been presented as a way of increasing the quality of local environments by enabling people to meet their daily needs through access to safe walking and cycling routes or by public transport. Internationally, it has captured the imagination of political decision-makers, built-environment practitioners and communities alike, as a life-affirming post-pandemic vision, held up as achieving environmental, health and economic improvements as well as reducing inequalities experienced by many. This paper's overall purpose is to separate the ends pursued in 20MNs from means available for achieving them.
Findings
The paper concludes that the ambition to see the 20MNs widely woven into existing urban, suburban and rural neighbourhoods will require significant effort to ensure all that all the component parts of, and key players in, planning's place-delivery systems are aligned and mutually supportive. Even where this can be achieved, further guidance will be needed on (1) how to operationalise the practical implementation of 20MNs and (2) how their success can be measured.
Originality/value
The originality of the paper lies in its efforts to discriminate between ends and means – between desired outcomes of 20MNs and the means available for achieving them. The significance of the paper lies here in this attempt to initiate a discussion on possible causal relationships between what is wanted and what would need to be done to achieve it. Without clarity about these relationships, misunderstanding, confusion and barriers to communication may arise across the many different organizations, stakeholder groups and actors involved. This lack of clarity could undermine trust and confidence, potentially undermining both the process and to its outcomes.
Chike F. Oduoza, Reem Alamri and David Oloke
Deployment of health and safety standards in extremely hazardous work environments such as oil and gas sector, is essential to minimise accidents leaving employees permanently or…
Abstract
Purpose
Deployment of health and safety standards in extremely hazardous work environments such as oil and gas sector, is essential to minimise accidents leaving employees permanently or temporarily incapacitated. The purpose of this research, is to understand why there are frequent accidents in case country's oil and gas sector, with a view to recommend solutions to mitigate problems.
Design/methodology/approach
Research methodology involved extensive review of the literature to appreciate background, and current research on typical accidents and safety measures taken at oil and gas construction sites to minimise accidents in a middle east country. Interviews, questionnaires and case stidies were deployed to acquire data which highlighted major reasons for accidents occurrence at oil and gas construction sites, and safety tools and techniques that could reduce accident rate if adopted by companies.
Findings
Findings, showed that oil and gas construction projects in case country were prone to health and safety related risks, challenges and accidents due to failure to comply with standards and legislation. Construction site teams and shop floor staff were rarely involved in development of safety policies, and some had no understanding of requirements and procedures underpinning safety during operations. Research recommended rapid application/adoption of international standards underpinned by ISO 45000 series and staff training at all levels. Deployment of robots and use of machine learning technology were suggested to implement risky tasks in the sector.
Originality/value
Research was based on rampant accidents occurring in hazardous oil and gas sector in country studied. Enforcement of health and safety standards, and use of modern tools and techniques were recommended to minimise accident rate.
Details