Article
Publication date: 13 January 2023

Stephen Akunyumu, Frank Fugar and Emmanuel Adinyira

The failure rate of international construction joint venture (ICJV) projects has been noted to be high in developing countries due to the complexity and risky nature of…

Abstract

Purpose

The failure rate of international construction joint venture (ICJV) projects has been noted to be high in developing countries due to the complexity and risky nature of construction projects in the international market. The purpose of this study is to identify and evaluate the risks facing ICJV projects in Ghana.

Design/methodology/approach

A risk register was developed through a comprehensive literature review. The identified risks were then used in a questionnaire survey involving local and foreign partners in ICJV projects in Ghana.

Findings

From a total of 74 risks identified, categorized into country-level risks, market-level risks and project-level risks, the “top ten” risks found to be the most critical risks facing ICJV projects in Ghana include unstable currency exchange rates, inflation, design changes, high-interest rate, budget overrun, cash flow problems of the client, economy fluctuation, difficulty in obtaining approval of projects from host government authorities/bureaucracy, potential financial distress of JV partner and bribery and corruption.

Originality/value

This study provides a comprehensive list of risks ICJV partners are likely to encounter on their projects in developing countries. Furthermore, this study improves on one of the major limitations of previous ICJV studies by collecting data from both partners of the ICJV, appropriate for cross-cultural examination and comparison.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 22 January 2024

Yanhui Du, Jingfeng Yuan, ShouQing Wang, Yan Liu and Ningshuang Zeng

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation…

110

Abstract

Purpose

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation department, which negatively impacts the information quality, leading to information asymmetry and undermining the overall effectiveness of supervision. This study aims to explore how to use blockchain to anchor the information used for supervision in PPP projects to the original information, to strengthen the oversight.

Design/methodology/approach

This paper adopts the principles of design science research (DSR) to design a conceptual framework that systematically organizes information along the information dissemination chain, ensuring the reliable anchoring of original information. Two-stage interviews involving experts from academia and industry are conducted, serving as formative and summative evaluations to guide the design.

Findings

The framework establishes a weak-centralized information organizing mode, including the design of governance community and on-chain and off-chain governance mechanisms. Feedback from experts is collected via interviews and the designed framework is thought to improve information used for supervision. Constructive suggestions are also collected and analyzed for further development.

Originality/value

This paper provides a novel example exploring the inspirations blockchain can bring to project governance, like exercising caution regarding the disorderly expansion of public sector authority in addressing information disadvantages and how to leverage blockchain to achieve this. Technical details conveyed by the framework deepen understanding of how blockchain benefits and the challenges faced in successful implementation for practitioners and policymakers. The targeted evaluation serves as rigorous validation, guiding experts to provide reliable feedback and richer insights by offering them a more cognitively convenient scenario.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 May 2023

Min Cheng, Lin Liu, Xiaotong Cheng and Li Tao

Many waste-to-energy (WTE) plants are constructed and operated using the public-private partnership (PPP) mode in China. However, risk events of PPP WTE incineration projects…

Abstract

Purpose

Many waste-to-energy (WTE) plants are constructed and operated using the public-private partnership (PPP) mode in China. However, risk events of PPP WTE incineration projects sometimes occur. This study aims to clarify the relationship of risks in China's PPP WTE incineration projects and identify the key risks accordingly and risk transmission paths.

Design/methodology/approach

A risk list of PPP WTE incineration projects was obtained based on literature analysis. Moreover, a hybrid approach combining fuzzy sets, decision-making trial and evaluation laboratory (DEMATEL) and interpretive structural modeling (ISM) was developed to analyze the causality of risks, explore critical risks and reveal the risk transmission paths. The quantitative analysis process was implemented in MATLAB.

Findings

The results show that government decision-making risk, government credit risk, government supervision behavior risk, legal and policy risk, revenue and cost risk and management capacity risk are the critical risks of PPP WTE incineration projects in China. These critical risks are at different levels in the risk hierarchy and often trigger other risks.

Originality/value

Currently, there is a lack of exploration on the interaction between the risks of PPP WTE incineration projects. This study fills this gap by examining the key risks and risk transfer pathways of PPP WTE incineration projects from the perspective of risk interactions. The findings can help the public and private sectors to systematically understand the risks in PPP WTE incineration projects, thus enabling them to identify the risks that need to be focused on when making decisions and to optimize risk prevention strategies. The proposed hybrid approach can offer methodological ideas for risk analysis of other types of PPP projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 December 2023

Isaac Akomea-Frimpong, Jacinta Rejoice Ama Delali Dzagli, Kenneth Eluerkeh, Franklina Boakyewaa Bonsu, Sabastina Opoku-Brafi, Samuel Gyimah, Nana Ama Sika Asuming, David Wireko Atibila and Augustine Senanu Kukah

Recent United Nations Climate Change Conferences recognise extreme climate change of heatwaves, floods and droughts as threatening risks to the resilience and success of…

Abstract

Purpose

Recent United Nations Climate Change Conferences recognise extreme climate change of heatwaves, floods and droughts as threatening risks to the resilience and success of public–private partnership (PPP) infrastructure projects. Such conferences together with available project reports and empirical studies recommend project managers and practitioners to adopt smart technologies and develop robust measures to tackle climate risk exposure. Comparatively, artificial intelligence (AI) risk management tools are better to mitigate climate risk, but it has been inadequately explored in the PPP sector. Thus, this study aims to explore the tools and roles of AI in climate risk management of PPP infrastructure projects.

Design/methodology/approach

Systematically, this study compiles and analyses 36 peer-reviewed journal articles sourced from Scopus, Web of Science, Google Scholar and PubMed.

Findings

The results demonstrate deep learning, building information modelling, robotic automations, remote sensors and fuzzy logic as major key AI-based risk models (tools) for PPP infrastructures. The roles of AI in climate risk management of PPPs include risk detection, analysis, controls and prediction.

Research limitations/implications

For researchers, the findings provide relevant guide for further investigations into AI and climate risks within the PPP research domain.

Practical implications

This article highlights the AI tools in mitigating climate crisis in PPP infrastructure management.

Originality/value

This article provides strong arguments for the utilisation of AI in understanding and managing numerous challenges related to climate change in PPP infrastructure projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 March 2024

Zhikun Ding, Wanqi Nie, Vivian W.Y. Tam and Chethana Illankoon

The preferences and adoption of recycled materials by consumers are subject to a variety of factors, such as enablers and barriers. Despite this, there exists a paucity of…

Abstract

Purpose

The preferences and adoption of recycled materials by consumers are subject to a variety of factors, such as enablers and barriers. Despite this, there exists a paucity of research concerning stakeholders' perceived value and real purchase decision towards recycled products. Consequently, this research study aims to fill this gap by investigating stakeholders' perceived value of recycled products derived from construction and demolition (C&D) waste and its effect on purchase decisions.

Design/methodology/approach

Research data were collected from 219 valid questionnaires completed by Chinese stakeholders. Structural equation modeling (SEM) was then employed to test eight hypotheses.

Findings

The results show intrinsic cue (materials) and extrinsic cue (brand) influence the stakeholders’ judgment on C&D waste recycled products’ value and then their purchase intention. However, cues such as quality, word-of-mouth, price, policy and advertised have not play a significant role in practice.

Originality/value

This research study verified the significance of brand and material cues on decision making for purchasing C&D waste recycled products, providing new insights to policy making to enhance the uptake of C&D waste recycled products in construction industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 May 2023

Xuewei Li, Jingfeng Yuan, Xuan Liu, Guangqi Wang and Qian-Cheng Wang

With the continuous improvement of public–private partnership (PPP) projects, the participants' value creation goals are not only limited to achieving the basic performance…

Abstract

Purpose

With the continuous improvement of public–private partnership (PPP) projects, the participants' value creation goals are not only limited to achieving the basic performance objectives but also to realising value added. However, the effect of traditional contract management on realising the value creation objectives of PPP projects is limited. According to the view of multifunctional contract, joint-contract functions that integrate contract control and flexibility are likely to be effective in enhancing the value creation of PPP projects. This study aims to explore the effects of joint-contract functions on PPP project value creation and relevant influencing mechanism by investigating the mediating effect of in-role behaviour and extra-role behaviour.

Design/methodology/approach

After collecting 258 valid questionnaires from PPP professionals in China, this study used structural equation modelling to validate the hypotheses.

Findings

Contract control and flexibility can improve PPP project value creation. Specifically, contract control improves the achievement of the basic contract objectives of PPP projects, whereas contract flexibility enhances the achievement of the value-added of PPP projects. Moreover, only in-role behaviour mediates the effect of contract control on value creation. In addition, the mediating effect of extra-role behaviour on the impact of contract flexibility on value creation is stronger than that of in-role behaviour. The mediating effect of in- and extra-role behaviour is mainly reflected in the realisation of basic and value-added performance, respectively.

Research implications

The findings of this study can help realise value creation in three ways. Firstly, new perspectives for PPP project value creation should be proposed by combining the improvement of contract objectives and the realisation of the participants' implicit demands. Secondly, the effects of different contract functions on value creation should be analysed instead of a single dimension of contractual governance. Thirdly, the mediating effects of different types of cooperation behaviour that may influence the relationship between contractual governance and value creation should be evaluated.

Originality/value

This study verifies the impacts of different contract functions on PPP project value creation. In addition, cooperative behaviour is embedded as a mediating variable, and the mediated transmission path from contract function to cooperative behaviour and further to PPP project value creation is systematically analysed.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 April 2024

Yun Li, Zhe Cheng, Jiangbin Yin, Zhenshan Yang and Ming Xu

Infrastructure financialization plays a critical role in infrastructure development and urban growth around the world. However, on the one hand, the existing research on the…

Abstract

Purpose

Infrastructure financialization plays a critical role in infrastructure development and urban growth around the world. However, on the one hand, the existing research on the infrastructure financialization focuses on qualitative and lacks quantitative country-specific studies. On the other hand, the spatial heterogeneity and influencing factors of infrastructure financialization are ignored. This study takes China as a typical case to identify and analyze the spatial characteristics, development process and impact factors of infrastructure financialization.

Design/methodology/approach

To assess the development and characteristics of infrastructure financialization in China, this study constructs an evaluation index of infrastructure financialization based on the infrastructure financialization ratio (IFR). This study then analyzes the evolution process and spatial pattern of China's infrastructure financialization through the spatial analysis method. Furthermore, this study identifies and quantitatively analyzes the influencing factors of infrastructure financialization based on the spatial Dubin model. Finally, this study offers a policy suggestion as a governance response.

Findings

The results demonstrate that infrastructure financialization effectively promotes the development of infrastructure in China. Second, there are significant spatial differences in China’s infrastructure financialization. Third, many factors affect infrastructure financialization, with government participation having the greatest impact. In addition, over-financialization of infrastructure has the potential to lead to government debt risks, which is a critical challenge the Chinese Government must address. Finally, this study suggests that infrastructure financialization requires more detailed, tailored,and place-specific policy interventions by the government.

Originality/value

This study not only contributes to enriching the knowledge body of global financialization theory but also helps optimize infrastructure investment and financing policies in China and provides peer reference for other developing countries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 April 2024

Yubo Guo, Jinchan Liu, Chuan Chen, Xiaowei Luo and Igor Martek

Public–Private Partnerships (PPPs) are crucial to the procurement of global infrastructure projects. Moreover, a price mode based on a cluster of core concessionary items is key…

Abstract

Purpose

Public–Private Partnerships (PPPs) are crucial to the procurement of global infrastructure projects. Moreover, a price mode based on a cluster of core concessionary items is key to the delivery of value-for-money and successful project outcomes. However, existing research has yet to fully identify PPP concessionary items, nor yet described the range of practical price modes. This study provides taxonomy of core concessionary items impacting PPP projects, systematically classifies price modes, and assesses the applicability and risk impacts of those price modes on PPP projects.

Design/methodology/approach

This study adopts a comparative case study method in analyzing core concessionary items and alternative price modes. China is taken as the context, as it is one of the world’s largest PPP markets. In ensuring research validity and reliability, diverse data sources are utilized, with a graphic content analysis tool developed to capture the structure of price modes.

Findings

Eight PPP price modes are identified. These are: (1) UP (Unit Price) mode, (2) ALS (Annual Lump Sum) mode, (3) IRR (Internal Rate of Return) mode, (4) RP (Return for Investing Capital (RIC) - Profit Rate of O&M (PROM)) mode, (5) RFP (RIC - Financing Interest Rate (FR) - PROM) mode, (6) RFPL (RIC - FR - PROM - Lower Limit of User Charge (LLoUC)) mode, (7) RFL (RIC - FR - Lump Sum/Fixed Unit Price O&M Contract (LSOM/FUP)) mode, and (8) RFLL (RIC - FR - LSOM/FUP - LLoUC) mode. Other main findings are as follows: (1) Five risk allocation configurations can be achieved via these price modes. Yet while different price modes enable the allocation of specific risks, these do not always align with contracting parties’ original intentions. (2) IRR and RP modes may be less applicable in general because of their vulnerability in allocating critical risks and capacity for spurring opportunistic behavior.

Originality/value

By depicting the paths by which concessionary items in price modes affect cash flow, a systematic analysis of price modes was conducted exposing structural characteristics, along with risk allocation choice implications. The study is unique in: (1) Providing a systematic classification of PPP price modes used in PPP projects, (2) Presenting a comprehensive identification and streamlining of concessionary items in PPP practice, and (3) Analyzing the risk effects of different price modes. Together, these outcomes offer a hitherto unavailable perspective on PPP project risk management. The value of the study lies in the following: (1) Existing studies employ diverse concessionary items, but their applicability varies. This study offers an overarching framework facilitating decision-making in selecting appropriate PPP price modes and in determining concessionary items. (2) This study adds to the understanding of PPP price modes in significant ways that will aid local governments and potential sponsors in crafting and administrating more workable contract designs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 April 2024

Hazwani Shafei, Rahimi A. Rahman, Yong Siang Lee and Che Khairil Izam Che Ibrahim

Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of…

Abstract

Purpose

Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of Construction 4.0 technologies to enhancing well-being are still poorly understood. Particularly, the challenge lies in selecting technologies that critically contribute to well-being enhancement. Therefore, this study aims to evaluate the implications of Construction 4.0 technologies to enhancing well-being.

Design/methodology/approach

A list of Construction 4.0 technologies was identified from a national strategic plan on Construction 4.0, using Malaysia as a case study. Fourteen construction industry experts were selected to evaluate the implications of Construction 4.0 technologies on well-being using fuzzy Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). The expert judgment was measured using linguistic variables that were transformed into fuzzy values. Then, the collected data was analyzed using the following analyses: fuzzy TOPSIS, Pareto, normalization, sensitivity, ranking performance and correlation.

Findings

Six Construction 4.0 technologies are critical to enhancing well-being: cloud & real-time collaboration, big data & predictive analytics, Internet of Things, building information modeling, autonomous construction and augmented reality & virtualization. In addition, artificial intelligence and advanced building materials are recommended to be implemented simultaneously as a very strong correlation exists between them.

Originality/value

The novelty of this study lies in a comprehensive understanding of the implications of Construction 4.0 technologies to enhancing well-being. The findings can assist researchers, industry practitioners and policymakers in making well-informed decisions to select Construction 4.0 technologies when targeting the enhancement of the overall well-being of the local construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords