Search results

1 – 10 of 36
Article
Publication date: 4 May 2023

Welington Norberto Carneiro, Jose Carlos Tiomatsu Oyadomari, Paulo Afonso, Ronaldo Gomes Dultra-de-Lima and Octavio Ribeiro de Mendonça Neto

This paper seeks to understand kaizen in practice as it travels through time and space in the organisational setting.

Abstract

Purpose

This paper seeks to understand kaizen in practice as it travels through time and space in the organisational setting.

Design/methodology/approach

A qualitative case study was carried out at a multinational company using mainly interviews for the data collection that were analysed from an actor-network theory (ANT) perspective.

Findings

This paper finds that the company deals with a series of paradoxes while managing the kaizen process. Efficiency and quality paradoxes are the basis for starting kaizen projects. Furthermore, intrinsic, and extrinsic motivation, emerge in these processes, and paradoxes relate to how spontaneous ideas emerge in a deliberated context of cost-saving objectives. The supply chain finance team coordinates kaizen projects with the collaboration of plant managers, promoting the paradox of autonomy and control. In addition, as kaizen mobilises and enrols the actors, some trials of strength emerge, showing actors who oppose the kaizen network and create competing networks that mutually exist in the firm.

Practical implications

This study presents valuable insights for professionals to successfully implement kaizen methodologies that take advantage of developing a network for problem-solving in organizations.

Originality/value

This study highlights the supply chain finance team's role in enrolling the actors within a network built by practitioners engaged in kaizen projects. Usually, engineers, quality, or manufacturing teams lead kaizen projects, and only occasionally, accounting and financial teams participate, including multidisciplinary teams.

Details

Benchmarking: An International Journal, vol. 31 no. 3
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 23 October 2023

Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…

Abstract

Purpose

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.

Design/methodology/approach

This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.

Findings

Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.

Practical implications

Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.

Originality/value

To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 25 March 2024

Shivangi Viral Thakker, Santosh B. Rane and Vaibhav S. Narwane

Digital supply chains require nascent technologies like blockchain and Internet of Things (IoT). There is a need to develop a roadmap for the implementation of these technologies…

Abstract

Purpose

Digital supply chains require nascent technologies like blockchain and Internet of Things (IoT). There is a need to develop a roadmap for the implementation of these technologies, as they require a huge amount of resources and infrastructure. The purpose of this paper is to analyze the challenges of implementing blockchain-IoT integrated architecture in the green supply chain and develop strategies for the same.

Design/methodology/approach

After a thorough literature survey of Scopus-indexed journals and books, 37 barriers were identified, which were then brought down to 15 barriers after confirming with industry and academic experts using the Delphi method. Using the total interpretive structural modeling (TISM) method and cross-impact matrix multiplication applied to classification (MICMAC) analysis, the barriers were modeled, and finally, strategies were formulated using a concept map to handle the barriers in the blockchain-IoT integrated architecture for a green supply chain.

Findings

This paper presents the research on barriers that can be considered for incorporating blockchain and IoT in the green supply chain. It was found from the TISM model that environmental concerns are Level-1 barriers and need to be addressed by developing appropriate technology and allocating funds for the same. An integrated ecosystem with blockchain and IoT is developed.

Research limitations/implications

The focus of this study was on the challenges of blockchain and IoT; hence, it is required to extend the research and find challenges for different industries and also analyze the criteria using other multi-criteria decision-making (MCDM) methods. Further research is required for the integration of blockchain-IoT with supply chain functions.

Practical implications

The transformation of a traditional supply chain into a green supply chain is possible with the integration of technologies. This research work and the strategies developed are useful to managers and practitioners working on technology implementation. Planning resources and addressing key barriers is possible with the concept maps and architecture developed.

Social implications

Green supply chain management (SCM) is gaining importance in industry as well as the academic sector due to government Policies and norms worldwide for reducing emissions and encouraging environment-friendly production systems. Incorporating blockchain and IoT in a green supply chain will further digitize and increase transparency in supply chains.

Originality/value

We have done a categorization of all barriers based on the expert survey by academicians and industry experts from industries in India. The concept map helps in identifying possible solutions for the challenges and initiatives to be taken for the smooth integration of technologies in the green supply chain.

Details

Modern Supply Chain Research and Applications, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-3871

Keywords

Article
Publication date: 1 April 2024

Mohammad Hani Al-Rifai

The purpose of this paper is twofold: first, a case study on applying lean principles in manufacturing operations to redesign and optimize an electronic device assembly process…

Abstract

Purpose

The purpose of this paper is twofold: first, a case study on applying lean principles in manufacturing operations to redesign and optimize an electronic device assembly process and its impact on performance and second, introducing cardboard prototyping as a Kaizen tool offering a novel approach to testing and simulating improvement scenarios.

Design/methodology/approach

The study employs value stream mapping, root cause analysis, and brainstorming tools to identify root causes of poor performance, followed by deploying a Kaizen event to redesign and optimize an electronic device assembly process. Using physical models, bottlenecks and opportunities for improvement were identified by the Kaizen approach at the workstations and assembly lines, enabling the testing of various scenarios and ideas. Changes in lead times, throughput, work in process inventory and assembly performance were analyzed and documented.

Findings

Pre- and post-improvement measures are provided to demonstrate the impact of the Kaizen event on the performance of the assembly cell. The study reveals that implementing lean tools and techniques reduced costs and increased throughput by reducing assembly cycle times, manufacturing lead time, space utilization, labor overtime and work-in-process inventory requirements.

Originality/value

This paper adds a new dimension to applying the Kaizen methodology in manufacturing processes by introducing cardboard prototyping, which offers a novel way of testing and simulating different scenarios for improvement. The paper describes the process implementation in detail, including the techniques and data utilized to improve the process.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79278

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 17 November 2021

Aqeel Ahmed, Sanjay Mathrani and Nihal Jayamaha

The aim of this paper is to explore the implementation of an integrated lean and ISO 14001 approach in meat industry for environmental performance and examine a proposed…

Abstract

Purpose

The aim of this paper is to explore the implementation of an integrated lean and ISO 14001 approach in meat industry for environmental performance and examine a proposed conceptual framework by capturing insights from lean and ISO 14001 experts in New Zealand (NZ).

Design/methodology/approach

Semi-structured interviews have been conducted with a group of consultants (lean and ISO 14001) to evaluate the suitability of an integrated lean and ISO 14001 approach in the meat industry for environmental performance. A conceptual framework from literature has guided this study leading to its further development based on the empirical evidence collected.

Findings

Findings have illustrated a synergistic positive impact of lean and ISO 14001 implementation as an integrated approach for sustaining environmental performance in the meat industry. A joint implementation program provides more clarity in aligning ISO 14001 operational procedures with lean tools and techniques for an enhanced environmental performance outcome.

Practical implications

The application of an integrated lean and ISO 14001 framework is proposed in this paper, which can help industry practitioners and academia in developing a joint implementation strategy and conducting future research.

Originality/value

To the best of the author’s knowledge, this study is the first to assess the effective implementation of lean and ISO 14001 as an integrated approach in the NZ meat industry.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 22 September 2021

Amna Farrukh, Sanjay Mathrani and Aymen Sajjad

Despite differing strategies towards environmental sustainability in developed and developing nations, the manufacturing sector in these regional domains faces substantial…

Abstract

Purpose

Despite differing strategies towards environmental sustainability in developed and developing nations, the manufacturing sector in these regional domains faces substantial environmental issues. The purpose of this study is to examine the green-lean-six sigma (GLSS) enablers and outcomes for enhancing environmental sustainability of manufacturing firms in both, a developed and developing country context by using an environment-centric natural resource-based view (NRBV).

Design/methodology/approach

First, a framework of GLSS enablers and outcomes aligned with the NRBV strategic capabilities is proposed through a systematic literature review. Second, this framework is used to empirically investigate the GLSS enablers and outcomes of manufacturing firms through in-depth interviews with lean six sigma and environmental consultants from New Zealand (NZ) and Pakistan (PK) (developed and developing nations).

Findings

Analysis from both regional domains highlights the use of GLSS enablers and outcomes under different NRBV capabilities of pollution prevention, product stewardship and sustainable development. A comparison reveals that NZ firms practice GLSS to comply with environmental regulatory requirements, avoid penalties and maintain their clean-green image. Conversely, Pakistani firms execute GLSS to reduce energy use, satisfy international customers and create a green image.

Practical implications

This paper provides new insights on GLSS for environmental sustainability which can assist industrial experts and academia for future strategies and research.

Originality/value

This is one of the early comparative studies that has used the NRBV to investigate GLSS enablers and outcomes in manufacturing firms for enhancing environmental performance comparing developed and developing nations

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 5 April 2024

Julianita Maria Scaranello Simões, José Carlos de Toledo and Fabiane Letícia Lizarelli

Front-line lean leadership is critical for implementing and sustaining lean production systems (LPS). The purpose of this paper is to analyze the relationships between front-line…

Abstract

Purpose

Front-line lean leadership is critical for implementing and sustaining lean production systems (LPS). The purpose of this paper is to analyze the relationships between front-line lean leader (FLL) capacities (cognitive, social, motivational, knowledge and experience), lean leader practices (developing people and supporting daily kaizen) and the degree of implementation of lean tools (pull system, involvement of employees and process control) in manufacturing companies.

Design/methodology/approach

A survey was conducted with FLLs from large Brazilian manufacturing companies. The survey collected 103 responses, 99 of which were validated. Data were analyzed using partial least squares structural equation modeling.

Findings

There was a positive, significant and direct relationship between FLL capacities, leadership practices and a degree of implementation of LPS tools on the shop floor. The validated model is a reference base for planning FLL capacities and practices that result in more effectively implementing LPS on the shop floor.

Practical implications

The findings provide managers with a new perspective on the importance of the development and training of FLLs focusing on leadership capacities. As decisions about developing lean capabilities impact the application of Lean leadership practices and the use of lean tools, they are also related to day-to-day lean activities and improved operational results. Additionally, the proposed model can be used by managers as a basis to diagnose, develop and select lean leaders.

Originality/value

This study seeks to fill a theoretical gap of knowledge on front-line lean leadership as it jointly addresses and empirically analyzes the existing relationships between lean leadership capacities, encompassing the perspective of psychology, lean practices and tools on the shop floor.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 7 February 2022

Bankole Osita Awuzie, Zwelinzima P. Mcwari, Progress Shingai Chigangacha, Clinton Ohis Aigbavboa, Theo C. Haupt and Lovelin Obi

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project…

Abstract

Purpose

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project failure has continued unabated despite this shift by public-sector entities. Also, there appears to be limited literature focussed on seeking to provide the rationale governing the decision to outsource or insource consultancy services by public-sector organisations. The purpose of this study was to appraise the performance of public-sector projects in which consultancy services have been outsourced or insourced. These are the gaps which this study was undertaken to fill.

Design/methodology/approach

A grounded theory methodology (GTM) research design was adopted based on the nature of evidence sought and gathered from a Provincial Department of Public Works and Infrastructure (PDPWI) in South Africa. Data was obtained from a mixture of semi-structured interviews and project-specific documents spanning a five-year period and was analysed according to the procedures associated with GTM. Accordingly, open coding, axial coding and pattern matching were carried out at several intervals to develop categories and themes.

Findings

The findings of the study showed the absence of a structured approach within the PDPWI for facilitating decisions pertaining to outsourcing or insourcing consultancy services within construction projects. Furthermore, the study established that both approaches yielded similar results across all performance facets of cost, time and quality. In addition, a detailed insight into the steps required for the successful application of GTM in built environment research has been provided in the study.

Originality/value

Limited studies have been undertaken to compare the impact of either outsourced or insourced services on the organisational and project performance. This was the gap to which the study reported in this paper was undertaken to contribute.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of 36