Airlines and Developing Countries
Type: Book
ISBN: 978-1-80455-861-4

Book part
Publication date: 6 June 2023

Nivea Thomas and K. N. Jha

The provision of air transport services in small and regional airports is a major concern worldwide as regional aviation is challenged with inadequate revenues. This chapter aims…

Abstract

The provision of air transport services in small and regional airports is a major concern worldwide as regional aviation is challenged with inadequate revenues. This chapter aims to identify the driving factors for sustaining regional airlines and airports. Nine factors are identified through literature review and expert opinion. Fuzzy-total interpretive structural modeling is used to develop a hierarchical relationship among the factors. Truncated population of the region, national subsidies, and airport infrastructure development have been found to be the strongest drivers for promoting regional airports. This hierarchical model provides a logical structure to the factors.

Details

Airlines and Developing Countries
Type: Book
ISBN: 978-1-80455-861-4

Article
Publication date: 18 April 2023

Avirag Bajpai, Subhas Chandra Misra and Dong-Young Kim

The purpose of this research article is to investigate the critical risk factors associated with the digitalization impact on the Indian construction industry, as these firm plans…

Abstract

Purpose

The purpose of this research article is to investigate the critical risk factors associated with the digitalization impact on the Indian construction industry, as these firm plans to implement digitalization in order to improve their construction management processes.

Design/methodology/approach

In this research article, risk factors and dimensions are taken from diverse industries and validated in the construction domain by industry and academic experts. Further, multi-criteria decision-making techniques are employed to assess the Indian construction sector scenario quantitatively. The interrelationship and weightage of risk factors and dimensions are determined by the Fuzzy Decision-making Trial and Evaluation Laboratory Analytic Network Process (DANP) method. However, the method Grey Technique for the Order of Prioritization by Similarity to Ideal Solution (TOPSIS) is used to determine the ranking of each risk factor.

Findings

This study finds 14 critical risk factors along with four risk dimensions. Operational and financial dimensions are significant risk dimensions. Whereas the threat of high outlay and low yield is a significant risk factor in construction. Besides that, the interrelationship among risk factors, the weightage of each factor and the ranking of critical risk factors are also identified.

Research limitations/implications

This research article uses Fuzzy DANP and Grey TOPSIS techniques as exploratory research methods with a limited group of construction professionals from a leading Indian construction firm. Furthermore, comprehensive confirmatory research can also be performed with a large group of construction experts using advanced analytical techniques to validate the ranking of critical risk factors.

Practical implications

The findings of this study provide insight into the knowledge of construction firms by emphasizing significant risk factors related to digitalization in construction operations. Another finding of this study shows that the risks associated with digitalization in construction are similar to those in manufacturing, where high outlay and low yield hold a significant role in the transformation process.

Originality/value

The research is unique since there have only been limited studies in the Indian construction scenario to analyze the significant risks associated with digitalization. Furthermore, this study demonstrates that the combination of Fuzzy DANP and Grey TOPSIS techniques may be used successfully to prioritize risks in construction digitalization, which is still in its early phases.

Details

Business Process Management Journal, vol. 29 no. 4
Type: Research Article
ISSN: 1463-7154

Keywords

Article
Publication date: 1 May 2023

Min Cheng, Lin Liu, Xiaotong Cheng and Li Tao

Many waste-to-energy (WTE) plants are constructed and operated using the public-private partnership (PPP) mode in China. However, risk events of PPP WTE incineration projects…

Abstract

Purpose

Many waste-to-energy (WTE) plants are constructed and operated using the public-private partnership (PPP) mode in China. However, risk events of PPP WTE incineration projects sometimes occur. This study aims to clarify the relationship of risks in China's PPP WTE incineration projects and identify the key risks accordingly and risk transmission paths.

Design/methodology/approach

A risk list of PPP WTE incineration projects was obtained based on literature analysis. Moreover, a hybrid approach combining fuzzy sets, decision-making trial and evaluation laboratory (DEMATEL) and interpretive structural modeling (ISM) was developed to analyze the causality of risks, explore critical risks and reveal the risk transmission paths. The quantitative analysis process was implemented in MATLAB.

Findings

The results show that government decision-making risk, government credit risk, government supervision behavior risk, legal and policy risk, revenue and cost risk and management capacity risk are the critical risks of PPP WTE incineration projects in China. These critical risks are at different levels in the risk hierarchy and often trigger other risks.

Originality/value

Currently, there is a lack of exploration on the interaction between the risks of PPP WTE incineration projects. This study fills this gap by examining the key risks and risk transfer pathways of PPP WTE incineration projects from the perspective of risk interactions. The findings can help the public and private sectors to systematically understand the risks in PPP WTE incineration projects, thus enabling them to identify the risks that need to be focused on when making decisions and to optimize risk prevention strategies. The proposed hybrid approach can offer methodological ideas for risk analysis of other types of PPP projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 July 2023

Prachi Vinod Ingle, Mahesh Gangadhar and M.D. Deepak

In recent times, there has been a lot of research focused on performance measurement (PM) in project-based sectors. However, there are very few studies that were reported on the…

Abstract

Purpose

In recent times, there has been a lot of research focused on performance measurement (PM) in project-based sectors. However, there are very few studies that were reported on the significance of PM in the construction sector. Keeping track of an organization in achieving organizations goals and objectives seems an important way. One of the major challenges faced by the industry is unavailable of an appropriate PM system for assessing organizational performance. Most of the PM approaches consider the traditional project triangle assessment of project success. Based on the limitations identified in existing PM models, the purpose of this paper is to develop a comprehensive PM model, i.e. Modified Project Quarter Back Rating (MPQR) applicable for construction projects.

Design/methodology/approach

A detailed list of performance areas as a method for PM is analyzed in the construction industry context. Also, industry-specific professionals conducted semi-structured interviews to assess whether these performance areas are sufficient to measure and understand the PM systems.

Findings

The research finding focuses on developing the MPQR model that considers both financial and non-financial areas for performance assessment to provide a holistic assessment of project performance.

Practical implications

MPQR model provides an opportunity to set the benchmark for overall performance for construction organizations.

Originality/value

The findings of the study are expected to provide guidelines to construction professionals for implementing the performance model that will improve performance in the construction industry.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 28 June 2022

Sy Tien Do, Viet Thanh Nguyen and Nghia Hoai Nguyen

This study aims to examine the mutual influence of causes of variation orders (VOs), claims/disputes (CDs) on project performance (PP) and stakeholder performance (SP).

Abstract

Purpose

This study aims to examine the mutual influence of causes of variation orders (VOs), claims/disputes (CDs) on project performance (PP) and stakeholder performance (SP).

Design/methodology/approach

Firstly, this study identifies the VOs, the CDs, criteria for measuring the PP and criteria for measuring the SP. Then, a survey questionnaire is created to collect data from stakeholders in construction projects. Using the factor analysis method, this study discovers the constructs of the VOs, CDs, PP and SP. The relationships among the constructs are then uncovered using a structural equation model.

Findings

The research findings confirm that the VOs and CDs have a direct effect on the PP, as well as the PP’s effect on SP, whereas the VOs and CDs have no effect on the SP. It is strongly recommended that critical factors such as poor management, construction method change, design/scope problems, uncontrollable objective problems, impediment problems, lack of commitment among parties and lack of experience and competence of parties should be given special attention to improve the SP.

Originality/value

The results of the study fill the gap in knowledge by examining the mutual influence of the VOs, the CDs, the PP and the SP. Discovering the mutual influence will assist managers in improving the PP and the SP.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 September 2021

Afiqah R. Radzi, Rahimi A. Rahman and Shu Ing Doh

Various approaches have emerged to assist practitioners in making more informed decisions in highway construction projects. However, industry practitioners are still using…

Abstract

Purpose

Various approaches have emerged to assist practitioners in making more informed decisions in highway construction projects. However, industry practitioners are still using subjective ways to make decisions. Also, researchers have developed tools and techniques with similar objectives. Lack of information on what has been developed might lead to those issues. Therefore, this paper aims to review trends of evolution, pinpoint strengths and gaps in the literature and identifies potential future directions for decision-making research in highway construction projects.

Design/methodology/approach

A systematic review was conducted on published articles on decision-making in highway construction projects using the Preferred Reporting Items for Systematic Reviews and Meta-Analysis (PRISMA) technique.

Findings

The analysis of 101 articles revealed that existing decision-making research in highway construction projects targets improvements in four areas: feasibility, conceptual, detailed scope and detailed design. The four areas consist of sixteen subthemes that are detailed in this study. In addition, most research involved developing decision support tools and systems as well as decision-making models, techniques and frameworks. Lastly, several research areas have emerged, such as adding more decision criteria including those with uncertainties, expanding existing decision-making models into decision support systems, benchmarking decision criteria between different sample populations and exploring inter-and intra-relationships between decision criteria.

Originality/value

This paper provides an overview of existing research on decision-making in highway construction projects. Also, it reveals research gaps in the body of knowledge to point out directions for future research. Finally, industry practitioners can use the findings to develop strategies for effective decision-making processes.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 18 March 2022

Sanjay Bhattacharya and Ankur Mathur

The construction industry worldwide is looking for overall efficiency in the entire project life cycle. Lean construction and Building Information Modeling (BIM) are together, key…

Abstract

Purpose

The construction industry worldwide is looking for overall efficiency in the entire project life cycle. Lean construction and Building Information Modeling (BIM) are together, key constituents in this quest. This study looks to reinforce the contribution of BIM to deliver applied lean principles to enhance productivity and performance.

Design/methodology/approach

The study adopts mixed methodologies of Ethnographic Action Research (EAR) and crisp set Qualitative Comparative Analysis (csQCA). The mosaic of case studies provides a descriptive and instrumental approach. While a descriptive approach investigates the interventions and phenomenon relating BIM to Lean, an instrumental approach constitutes exemplars of the interrelated phenomenon of BIM and Lean.

Findings

The themes of Elimination of Waste, Kaizen, Respecting the Human Elements, Poke-a-Yoke and Jidoka are contributed to the maximum by BIM. All the case studies discussed evidence of the contribution to Lean, as they enhance end-customer value.

Research limitations/implications

The contribution of BIM towards Lean could encourage collaborations amongst stakeholders for mutual benefits. BIM could enhance decision making, predictive simulation, risk analysis, etc. with many other exciting possibilities of delivering productivity and performance. The study is limited by the insights offered by the individual cases.

Originality/value

The study provides insights into potential developments and research. It is expected to encourage reflective professional practice triggered by innovative thinking for the gainful utilization of BIM to deliver Lean.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 7
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 5 December 2023

Atul Kumar Singh and V.R. Prasath Kumar

Blockchain is a developing technology that affects numerous industries, including facility management (FM). Many barriers are associated with adopting blockchain-enabled building…

Abstract

Purpose

Blockchain is a developing technology that affects numerous industries, including facility management (FM). Many barriers are associated with adopting blockchain-enabled building information modeling (BEBIM) in FM. This research aims to identify and prioritize the barriers to adopting BEBIM in FM.

Design/methodology/approach

To address the knowledge gap, this study employs a two-phase methodology for evaluating the barriers to adopting BEBIM in FM. The first phase involves a comprehensive literature review identifying 14 barriers to BEBIM adoption. Using a Delphi approach, the identified barriers were categorized into 6 groups and finalized by 11 experts, adding 3 more barriers to the list. The best-worst method (BWM) determines the priority weights of identified barriers and sub-barriers in the second phase.

Findings

This study reveals that adopting BEBIM for FM in India faces significant hurdles. The most critical barriers are “limited collaboration” and “communication among stakeholders,” “legal constraints in certain jurisdictions” and “challenges in establishing trust and governance models.” To mitigate these barriers, stakeholders should foster collaboration and communication, develop efficient blockchain technology (BT) and establish a trust and governance model.

Practical implications

This work underscores the importance of formulating effective strategies to overcome the identified barriers and emphasizes implications that can assist policymakers and industry stakeholders in achieving successful BEBIM adoption for improved FM practice.

Originality/value

The study provides valuable insights for policymakers, construction industry stakeholders and facility managers interested in leveraging this technology to improve the efficiency and effectiveness of FM practice in India.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 12 September 2023

Pramod Malaka Silva, Niluka Domingo and Noushad Ali Naseem Ameer Ali

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous…

Abstract

Purpose

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous dispute that costs the project success and good relationships and affects stakeholders' expectations. There has been a focus on causes of construction-related disputes, and studies over the past three decades have attempted to identify a more comprehensive list of reasons for disputes. Some of these studies' limitations were geographical, project delivery methods and project types. The purpose of this study is to identify the most recent and conclusive list of causes of disputes based on current literature by undertaking a systematic literature review (SLR).

Design/methodology/approach

Considering the large number of studies that focused on causes of disputes, this study aims to develop a comprehensive list of causes, using a SLR, as it ensures that all previous articles in multiple databases are reviewed to produce a comprehensive outcome. A six-stage SLR was followed from background study to analysis and reporting.

Findings

Not surprisingly, the number of publications has increased over time, most from the Middle East region. The interconnected nature of the causes was widely emphasised. The SLR has produced eight common core causes of disputes. They are: poor contractual arrangements, employer-initiated scope changes, unforeseen site changes, poor contract understanding and administration, contractor’s quality of works, the inability of the contractor to achieve time targets, non- or delayed payments and poor quality of design. The majority of previous authors realised that disputes could be avoided by parties’ involvement during the early stages, avoiding being opportunistic and acting collaboratively.

Originality/value

Even though numerous studies have been carried out to identify the causes of disputes in the construction industry, none did a SLR. This study aggregates all the previous studies that focused on construction-related disputes systematically. Categorising causes based on the party primarily responsible help various stakeholders by providing a distinct list of factors to avoid that contribute to disputes.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387