Search results

1 – 10 of 339
Article
Publication date: 2 January 2024

Wenlong Cheng and Wenjun Meng

This study aims to solve the problem of job scheduling and multi automated guided vehicle (AGV) cooperation in intelligent manufacturing workshops.

Abstract

Purpose

This study aims to solve the problem of job scheduling and multi automated guided vehicle (AGV) cooperation in intelligent manufacturing workshops.

Design/methodology/approach

In this study, an algorithm for job scheduling and cooperative work of multiple AGVs is designed. In the first part, with the goal of minimizing the total processing time and the total power consumption, the niche multi-objective evolutionary algorithm is used to determine the processing task arrangement on different machines. In the second part, AGV is called to transport workpieces, and an improved ant colony algorithm is used to generate the initial path of AGV. In the third part, to avoid path conflicts between running AGVs, the authors propose a simple priority-based waiting strategy to avoid collisions.

Findings

The experiment shows that the solution can effectively deal with job scheduling and multiple AGV operation problems in the workshop.

Originality/value

In this paper, a collaborative work algorithm is proposed, which combines the job scheduling and AGV running problem to make the research results adapt to the real job environment in the workshop.

Details

Robotic Intelligence and Automation, vol. 44 no. 1
Type: Research Article
ISSN: 2754-6969

Keywords

Open Access
Article
Publication date: 5 March 2024

Thanduxolo Elford Fana and Jane Goudge

In this paper, the authors examine the strategies used to reduce labour costs in three public hospitals in South Africa, which were effective and why. In the democratic era, after…

Abstract

Purpose

In this paper, the authors examine the strategies used to reduce labour costs in three public hospitals in South Africa, which were effective and why. In the democratic era, after the revelations of large-scale corruption, the authors ask whether their case studies provide lessons for how public service institutions might re-make themselves, under circumstances of austerity.

Design/methodology/approach

A comparative qualitative case study approach, collecting data using a combination of interviews with managers, focus group discussions and interviews with shop stewards and staff was used.

Findings

Management in two hospitals relied on their financial power, divisions between unions and employees' loyalty. They lacked the insight to manage different actors, and their efforts to outsource services and draw on the Extended Public Works Program failed. They failed to support staff when working beyond their scope of practice, reducing employees' willingness to take on extra responsibilities. In the remaining hospital, while previous management had been removed due to protests by the unions, the new CEO provided stability and union–management relations were collaborative. Her legitimate power enabled unions and management to agree on appropriate cost cutting strategies.

Originality/value

Finding an appropriate balance between the new reality of reduced financial resources and the needs of staff and patients, requires competent unions and management, transparency and trust to develop legitimate power; managing in an authoritarian manner, without legitimate power, reduces organisational capacity. Ensuring a fair and orderly process to replace ineffective management is key, while South Africa grows cohorts of competent managers and builds managerial experience.

Details

Journal of Health Organization and Management, vol. 38 no. 9
Type: Research Article
ISSN: 1477-7266

Keywords

Article
Publication date: 18 April 2024

Zhanghuang Xie, Xiaomei Li, Dian Huang, Andrea Appolloni and Kan Fang

We consider a joint optimization problem of product platform design and scheduling on unrelated additive/subtractive hybrid machines, and seek to find efficient solution…

Abstract

Purpose

We consider a joint optimization problem of product platform design and scheduling on unrelated additive/subtractive hybrid machines, and seek to find efficient solution approaches to solve such problem.

Design/methodology/approach

We propose a mathematical formulation for the problem of simultaneous product platform design and scheduling on unrelated additive/subtractive hybrid machines, and develop a simulated annealing-based hyper-heuristic algorithm with adjustable operator sequence length to solve the problem.

Findings

The simulated annealing-based hyper-heuristic algorithm with adjustable operator sequence length (SAHH-osla) that we proposed can be quite efficient in solving the problem of simultaneous product platform design and scheduling on unrelated additive/subtractive hybrid machines.

Originality/value

To the best of our knowledge, we are one of the first to consider both cost-related and time-related criteria for the problem of simultaneous product platform design and scheduling on unrelated additive/subtractive hybrid machines.

Details

Industrial Management & Data Systems, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 25 December 2023

Zihan Dang and Naiming Xie

Assembly line is a common production form and has been effectively used in many industries, but the imprecise processing time of each process makes production line balancing and…

Abstract

Purpose

Assembly line is a common production form and has been effectively used in many industries, but the imprecise processing time of each process makes production line balancing and capacity forecasting the most troublesome problems for production managers. In this paper, uncertain man-hours are represented as interval grey numbers, and the optimization problem of production line balance in the case of interval grey man-hours is studied to better evaluate the production line capacity.

Design/methodology/approach

First, this paper constructs the basic model of assembly line balance optimization for the single-product scenario, and on this basis constructs an assembly line balance optimization model under the multi-product scenario with the objective function of maximizing the weighted greyscale production line balance rate, second, this paper designs a simulated annealing algorithm to solve problem. A neighborhood search strategy is proposed, based on assembly line balance optimization, an assembly line capacity evaluation method with interval grey man-hour characteristics is designed.

Findings

This paper provides a production line balance optimization scheme with uncertain processing time for multi-product scenarios and designs a capacity evaluation method to provide managers with scientific management strategies so that decision-makers can scientifically solve the problems that the company's design production line is quite different from the actual production situation.

Originality/value

There are few literary studies on combining interval grey number with assembly line balance optimization. Therefore, this paper makes an important contribution in this regard.

Details

Grey Systems: Theory and Application, vol. 14 no. 2
Type: Research Article
ISSN: 2043-9377

Keywords

Article
Publication date: 18 April 2024

Vaishali Rajput, Preeti Mulay and Chandrashekhar Madhavrao Mahajan

Nature’s evolution has shaped intelligent behaviors in creatures like insects and birds, inspiring the field of Swarm Intelligence. Researchers have developed bio-inspired…

Abstract

Purpose

Nature’s evolution has shaped intelligent behaviors in creatures like insects and birds, inspiring the field of Swarm Intelligence. Researchers have developed bio-inspired algorithms to address complex optimization problems efficiently. These algorithms strike a balance between computational efficiency and solution optimality, attracting significant attention across domains.

Design/methodology/approach

Bio-inspired optimization techniques for feature engineering and its applications are systematically reviewed with chief objective of assessing statistical influence and significance of “Bio-inspired optimization”-based computational models by referring to vast research literature published between year 2015 and 2022.

Findings

The Scopus and Web of Science databases were explored for review with focus on parameters such as country-wise publications, keyword occurrences and citations per year. Springer and IEEE emerge as the most creative publishers, with indicative prominent and superior journals, namely, PLoS ONE, Neural Computing and Applications, Lecture Notes in Computer Science and IEEE Transactions. The “National Natural Science Foundation” of China and the “Ministry of Electronics and Information Technology” of India lead in funding projects in this area. China, India and Germany stand out as leaders in publications related to bio-inspired algorithms for feature engineering research.

Originality/value

The review findings integrate various bio-inspired algorithm selection techniques over a diverse spectrum of optimization techniques. Anti colony optimization contributes to decentralized and cooperative search strategies, bee colony optimization (BCO) improves collaborative decision-making, particle swarm optimization leads to exploration-exploitation balance and bio-inspired algorithms offer a range of nature-inspired heuristics.

Open Access
Article
Publication date: 11 July 2023

Oscar Y. Moreno Rocha, Paula Pinto, Maria C. Consuegra, Sebastian Cifuentes and Jorge H. Ulloa

This study aims to facilitate access to vascular disease screening for low-income individuals living in remote and conflict areas based on the results of a pilot trial in…

Abstract

Purpose

This study aims to facilitate access to vascular disease screening for low-income individuals living in remote and conflict areas based on the results of a pilot trial in Colombia. Also, to increase the amount of diagnosis training of vascular surgery (VS) in civilians.

Design/methodology/approach

The operation method includes five stages: strategy development and adjustment; translation of the strategy into a real-world setting; operation logistics planning; strategy analysis and adoption. The operation plan worked efficiently in this study’s sample. It demonstrated high sensibility, efficiency and safety in a real-world setting.

Findings

The authors developed and implemented a flow model operating plan for screening vascular pathologies in low-income patients pro bono without proper access to vascular health care. A total of 140 patients from rural areas in Colombia were recruited to a controlled screening session where they underwent serial noninvasive ultrasound assessments conducted by health professionals of different training stages in VS.

Research limitations/implications

The plan was designed to be implemented in remote, conflict areas with limited access to VS care. Vascular injuries are critically important and common among civilians and military forces in regions with active armed conflicts. As this strategy can be modified and adapted to different medical specialties and geographic areas, the authors recommend checking the related legislation and legal aspects of the intended areas where we will implement this tool.

Practical implications

Different sub-specialties can implement the described method to be translated into significant areas of medicine, as the authors can adjust the deployment and execution for the assessment in peripheral areas, conflict zones and other public health crises that require a faster response. This is necessary, as the amount of training to which VS trainees are exposed is low. A simulated exercise offers a novel opportunity to enhance their current diagnostic skills using ultrasound in a controlled environment.

Social implications

Evaluating and assessing patients with limited access to vascular medicine and other specialties can decrease the burden of vascular disease and related complications and increase the number of treatments available for remote communities.

Originality/value

It is essential to assess the most significant number of patients and treat them according to their triage designation. This management is similar to assessment in remote areas without access to a proper VS consult. The authors were able to determine, classify and redirect to therapeutic interventions the patients with positive findings in remote areas with a fast deployment methodology in VS.

Plain language summary

Access to health care is limited due to multiple barriers and the assessment and response, especially in peripheral areas that require a highly skilled team of medical professionals and related equipment. The authors tested a novel mobile assessment tool for remote and conflict areas in a rural zone of Colombia.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 14 no. 2
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 16 May 2023

Pinosh Kumar Hajoary, Amrita MA and Jose Arturo Garza-Reyes

Industry 4.0 has offered significant potential for manufacturing firms to alter and rethink their business models, production processes, strategies and objectives. Manufacturing…

Abstract

Purpose

Industry 4.0 has offered significant potential for manufacturing firms to alter and rethink their business models, production processes, strategies and objectives. Manufacturing organizations have recently undergone substantial transformation due to Industry 4.0 technologies. Hence, to successfully deploy and embed Industry 4.0 technologies in their organizational operations and practices, businesses must assess their adoption readiness. For this purpose, a multi-dimensional analytical indicator methodology has been developed to measure Industry 4.0 maturity and preparedness.

Design/methodology/approach

A weighted average method was adopted to assess the Industry 4.0 readiness using a case study from a steel manufacturing organization.

Findings

The result revealed that the firm ranks between Industry 2.0 and Industry 3.0, with an overall score of 2.32. This means that the organization is yet to achieve Industry 4.0 mature and ready organization.

Practical implications

The multi-dimensional indicator framework proposed can be used by managers, policymakers, practitioners and researchers to assess the current status of organizations in terms of Industry 4.0 maturity and readiness as well as undertake a practical diagnosis and prognosis of systems and processes for its future adoption.

Originality/value

Although research on Industry 4.0 maturity models has grown exponentially in recent years, this study is the first to develop a multi-dimensional analytical indicator to measure Industry 4.0 maturity and readiness.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 28 November 2022

Elena Stefana, Paola Cocca, Federico Fantori, Filippo Marciano and Alessandro Marini

This paper aims to overcome the inability of both comparing loss costs and accounting for production resource losses of Overall Equipment Effectiveness (OEE)-related approaches.

1538

Abstract

Purpose

This paper aims to overcome the inability of both comparing loss costs and accounting for production resource losses of Overall Equipment Effectiveness (OEE)-related approaches.

Design/methodology/approach

The authors conducted a literature review about the studies focusing on approaches combining OEE with monetary units and/or resource issues. The authors developed an approach based on Overall Equipment Cost Loss (OECL), introducing a component for the production resource consumption of a machine. A real case study about a smart multicenter three-spindle machine is used to test the applicability of the approach.

Findings

The paper proposes Resource Overall Equipment Cost Loss (ROECL), i.e. a new KPI expressed in monetary units that represents the total cost of losses (including production resource ones) caused by inefficiencies and deviations of the machine or equipment from its optimal operating status occurring over a specific time period. ROECL enables to quantify the variation of the product cost occurring when a machine or equipment changes its health status and to determine the actual product cost for a given production order. In the analysed case study, the most critical production orders showed an actual production cost about 60% higher than the minimal cost possible under the most efficient operating conditions.

Originality/value

The proposed approach may support both production and cost accounting managers during the identification of areas requiring attention and representing opportunities for improvement in terms of availability, performance, quality, and resource losses.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 30 November 2023

Elif Kiran, Yesim Deniz Ozkan-Ozen and Yucel Ozturkoglu

This study aims to analyze lean wastes for the poultry sector in Turkey and link lean tools to this study, focusing on identifying each lean waste that affects poultry production…

Abstract

Purpose

This study aims to analyze lean wastes for the poultry sector in Turkey and link lean tools to this study, focusing on identifying each lean waste that affects poultry production and proposing solutions for preventing these lean wastes in the sector. The proposed solutions aim to improve processes by suggesting different lean tools and their applications for the poultry sector.

Design/methodology/approach

The study consists of two different applications. First, the waste relationship matrix (WRM) was created to reveal the relationship between seven lean wastes and their importance order. Then, after determining lean tools for eliminating lean wastes, the optimum weight ranking and consistency ratio of the most suitable lean tools were calculated for these wastes and ranked with the best-worst method (BWM).

Findings

Results showed that overproduction is the most critical waste that impacts other wastes, followed by defect waste. Due to the nature of the sector, these wastes not only result in economic loss for the company but also in food waste and loss and issues related to animal welfare. Furthermore, the Kaizen approach and 5S implementation are the methods to eliminate these wastes. Detailed discussion on the link between lean tools and lean wastes is provided for the poultry sector.

Originality/value

This is the first study that theoretically and empirically identifies the potential lean waste affecting the poultry sector and provides lean tools for eliminating these wastes. Sector-specific explanations and discussions are presented in the study to show the applicability of lean approaches in the poultry sector to eliminate waste. In addition, this study is the first to integrate the WRM and BWM.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 5
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 22 November 2023

Kalpana Pitchaimani, Tarik Zouadi, K.S. Lokesh and V. Raja Sreedharan

As the world is becoming more volatile and uncertain, organizations face much complexity in their daily operations. Further, there is a much ambiguity in business operations to…

Abstract

Purpose

As the world is becoming more volatile and uncertain, organizations face much complexity in their daily operations. Further, there is a much ambiguity in business operations to achieve the effective utilization of resources. The work optimizes a novel constraint programming model approach of the utilization of shuttle services vehicle while considering cost savings, employee wellbeing and other real an Information Technology enabled service (ITES) industry constraints.

Design/methodology/approach

The present work considers a novel extension of the vehicle routing problem related to the shuttle service operation in an ITES industry in VUCA context. Additionally, the model considers the women safety aspects, which engages the company to provide a security guard for women employees in the night shift.

Findings

Numerical experiments were conducted on real instances data of ITES industrial partner. The results show that the vehicle utilization increased from 75% up to 96% while ensuring in parallel the wellbeing of employees and women safety during the night shift. Finally, the proposed model is converted to a decision support application allowing ITES partner to plan employees shuttle service operations efficiently.

Originality/value

Study has evaluated the shuttle services optimization for ITES industry using data from industrial which makes it a unique contribution to literature in shuttle operations. Further, the study used constraint programming to evaluate the vehicle utilization and security allocation, thereby introducing new parameter on security allocation in open VRP problem.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 4
Type: Research Article
ISSN: 0265-671X

Keywords

1 – 10 of 339