Search results

1 – 10 of over 1000
Open Access
Article
Publication date: 29 March 2024

Xingwen Wu, Zhenxian Zhang, Wubin Cai, Ningrui Yang, Xuesong Jin, Ping Wang, Zefeng Wen, Maoru Chi, Shuling Liang and Yunhua Huang

This review aims to give a critical view of the wheel/rail high frequency vibration-induced vibration fatigue in railway bogie.

Abstract

Purpose

This review aims to give a critical view of the wheel/rail high frequency vibration-induced vibration fatigue in railway bogie.

Design/methodology/approach

Vibration fatigue of railway bogie arising from the wheel/rail high frequency vibration has become the main concern of railway operators. Previous reviews usually focused on the formation mechanism of wheel/rail high frequency vibration. This paper thus gives a critical review of the vibration fatigue of railway bogie owing to the short-pitch irregularities-induced high frequency vibration, including a brief introduction of short-pitch irregularities, associated high frequency vibration in railway bogie, typical vibration fatigue failure cases of railway bogie and methodologies used for the assessment of vibration fatigue and research gaps.

Findings

The results showed that the resulting excitation frequencies of short-pitch irregularity vary substantially due to different track types and formation mechanisms. The axle box-mounted components are much more vulnerable to vibration fatigue compared with other components. The wheel polygonal wear and rail corrugation-induced high frequency vibration is the main driving force of fatigue failure, and the fatigue crack usually initiates from the defect of the weld seam. Vibration spectrum for attachments of railway bogie defined in the standard underestimates the vibration level arising from the short-pitch irregularities. The current investigations on vibration fatigue mainly focus on the methods to improve the accuracy of fatigue damage assessment, and a systematical design method for vibration fatigue remains a huge gap to improve the survival probability when the rail vehicle is subjected to vibration fatigue.

Originality/value

The research can facilitate the development of a new methodology to improve the fatigue life of railway vehicles when subjected to wheel/rail high frequency vibration.

Details

Railway Sciences, vol. 3 no. 2
Type: Research Article
ISSN: 2755-0907

Keywords

Article
Publication date: 24 January 2024

Dexin Chen, Hongyuan He, Zhixin Kang and Wei Li

This study aims to review the current one-step electrodeposition of superhydrophobic coatings on metal surfaces.

Abstract

Purpose

This study aims to review the current one-step electrodeposition of superhydrophobic coatings on metal surfaces.

Design/methodology/approach

One-step electrodeposition is a versatile and simple technology to prepare superhydrophobic coatings on metal surfaces.

Findings

Preparing superhydrophobic coatings by one-step electrodeposition is an efficient method to protect metal surfaces.

Originality/value

Even though there are several technologies, one-step electrodeposition still plays a significant role in producing superhydrophobic coatings.

Details

Anti-Corrosion Methods and Materials, vol. 71 no. 2
Type: Research Article
ISSN: 0003-5599

Keywords

Article
Publication date: 27 September 2022

Sooin Kim, Atefe Makhmalbaf and Mohsen Shahandashti

The purpose of this paper is to understand the post-COVID-19 fluctuations in the building construction demand from various angles at the national, regional, and sectoral levels…

Abstract

Purpose

The purpose of this paper is to understand the post-COVID-19 fluctuations in the building construction demand from various angles at the national, regional, and sectoral levels. Despite the significant impact of COVID-19 on the building construction industry, a detailed quantitative analysis of the COVID-19 impact on the building construction demand is still lacking. The current study aims to (1) establish a statistical approach to quantify the COVID-19 impact on the building construction demand; (2) investigate the post-COVID-19 fluctuations in the construction demand of different building services, regional markets, and building sectors using the historical time series of the architecture billings index (ABI); and (3) identify vulnerable market and sector and discuss the post-COVID-19 recovery strategies.

Design/methodology/approach

The research methodology follows four steps: (1) collecting national, regional, and sectoral ABIs; (2) creating seasonal autoregressive integrated moving average models; (3) illustrating cumulative sum control charts to identify significant ABI deviations; and (4) quantifying the post-COVID-19 ABI fluctuations.

Findings

The results show that all the ABIs experienced a statistically significant decrease after COVID-19. The project inquiries index reduced more but recovered faster than billings and design contracts indices. The midwest billings index decreased the most among the regional ABIs and the commercial/industrial billing index dropped the most among the sectoral ABIs.

Originality/value

This study is unique in the way that it utilized the ABI data and the approach using SARIMA models and CUSUM control charts to assess the post-COVID-19 building construction demand represented by ABI fluctuations.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 February 2024

Yu Yang, Shiting Shao and Dongping Cao

Despite the critical role of the policy environment in facilitating the advancement of building information modeling (BIM) as a systemic innovation to reshape traditional facility…

Abstract

Purpose

Despite the critical role of the policy environment in facilitating the advancement of building information modeling (BIM) as a systemic innovation to reshape traditional facility design, construction and operation processes, scant scholarly attention has been paid to systematically investigating how and why complex BIM policies are concretely and gradually implemented in different regional contexts from a dynamic policy diffusion perspective. This study aims to empirically investigate how different types of BIM policy instruments are dynamically implemented in heterogeneous regions over time and how the diffusion of BIM policies across different regions is comprehensively impacted by both internal efficiency needs and external legitimacy pressures.

Design/methodology/approach

This study employed a positivist research paradigm in which BIM policy data from 182 prefecture-level and above cities in China during 2011–2022 were analyzed with quantitative approaches for theory verification. Based on the content analysis of the evolutionary characteristics of the adopted BIM policy instruments in heterogeneous regions over time, the event history analysis (EHA) method was then used to further examine the mechanisms underlying the diffusion of BIM policies across different regions.

Findings

The content analysis results show that while environmental instruments (such as technological integration and goal planning) are the primary policy instruments currently adopted in China, recent years have also witnessed increasing adoptions of supply-side instruments (such as fiscal support and information support) and demand-side instruments (such as demonstration projects and tax incentives). After controlling for the impacts of regional fiscal and technical resources, the EHA results illustrate that BIM policy adoption positively relates to regional construction industry scale but negatively relates to regional industry productivity and that compared with public pressures from industry participants, vertical pressures from the central government and horizontal pressures from neighboring regions are more substantial drivers for policy adoption.

Originality/value

As an exploratory effort of using a dynamic policy diffusion perspective to systematically investigate how BIM policies are adopted in heterogeneous regional contexts to facilitate BIM advancement, this study not only characterizes the complexity and dynamics of BIM policies but also provides deepened understandings of the mechanisms underlying policy adoption in the conservative construction industry. The findings hold implications for how multifarious policy instruments can be more effectively and dynamically adopted to facilitate the advancement of BIM and related technologies as innovative solutions in the construction domain.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 October 2023

Jyh-Bin Yang and Ying-Fu Chen

An S-curve is an essential project-management tool. However, it is difficult to adjust S-curve to deal with a force majeure event. The present study develops four valuable…

Abstract

Purpose

An S-curve is an essential project-management tool. However, it is difficult to adjust S-curve to deal with a force majeure event. The present study develops four valuable adjustment approaches, designed to achieve a compromise between the views of the client and contractor. These can be used to control projects after a force majeure event.

Design/methodology/approach

The present study develops four adjustment approaches, which can be used to achieve a compromise between the views of the client and those of the contractor when controlling projects after a force majeure. To determine the S-curves during a force majeure event, two approaches can be selected: BCWS (budgeted cost of scheduled work)-base approach, or BCWP (budgeted cost of work performed)-base approach. To determine the rest of S-curves after a force majeure event, two approaches can be considered: maintaining the original curve of the remaining BCWS, or allocating the original curve of the remaining BCWS. Based on the validation of three empirical cases, drawn from a professional project-management website, this study confirms the feasibility of four proposed empirical approaches and a selection procedure for S-curve adjustment.

Findings

The S-curve-adjustment approaches presented here can be used to deal with cases that are ahead of, on and behind schedule. Using the proposed approaches and selection procedure, contractors can easily revise S-curves and control projects more effectively. To deal with a force majeure event, such as COVID-19, they are strongly advised to adopt the approaches labeled SA-A1 (to adjust the S-curve based on the extension ratio multiplied by the difference in progress during the force majeure) and SA-B1 (to maintain the original curve of the remaining BCWS) for the A/E and E/F curves, respectively.

Research limitations/implications

The proposed approaches can be used in cases of continuous construction during force majeure events. If construction work is totally suspended during such an event, it will be necessary to fine-tune the proposed approaches.

Originality/value

Previous studies have used case-oriented or mathematical-simulation approaches to forecast S-curves. The present study proposes simple approaches that allow the client and contractor to adjust the S-curve easily after a force majeure event. These approaches can be used to adjust work and project-completion targets within an extended duration. Selecting the right S-curve adjustment approach can help to control the remainder of the project, reducing the possibility of delay claims.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 December 2023

Huiling Li, Wenya Yuan and Jianzhong Xu

This study aimed to identify a specific taxonomy of entry modes for international construction contractors and to develop a decision-making mechanism based on case-based reasoning…

Abstract

Purpose

This study aimed to identify a specific taxonomy of entry modes for international construction contractors and to develop a decision-making mechanism based on case-based reasoning (CBR) to facilitate the selection of the most suitable entry modes.

Design/methodology/approach

According to the experience orientation of the construction industry, a CBR entry mode decision model was established, and based on successful historical cases, a two-step refinement process was carried out to identify similar situations. Then the validity of the model is proved by case analysis.

Findings

This study identified an entry mode taxonomy for international construction contractors (ICCs) and explored their decision-making mechanisms. First, a two-dimension model of entry mode for ICCs was constructed from ownership and value chain dimensions; seven common ICC entry modes were identified and ranked according to market commitment. Secondly, this study reveals the impact mechanism of the ICC entry mode from two aspects: the external environment and enterprise characteristics. Accordingly, an entry mode decision model is established.

Practical implications

Firstly, sorting out the categories of entry mode in the construction field, which provide an entry mode list for ICCs to select. Secondly, revealing the impact mechanism of ICC entry mode, which proposes a systematic decision-making system for the selection of ICC entry mode. Thirdly, constructing a CBR entry mode decision-making model from an empirical perspective, which offers tool support and reduces transaction costs in the decision-making process.

Originality/value

The study on entry modes for ICCs is still in the preliminary exploratory stage. The authors investigate the entry mode categories and decision-making mechanisms for ICCs based on Uppsala internationalization process theory. It widens the applied scope of Uppsala and promotes cross-disciplinary integration. In addition, the authors creatively propose a two-stage retrieval mechanism in the CBR model, which considers the order of decision variables. It refines the influence path of the decision variables on ICCs' entry mode.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 March 2024

Florence Yean Yng Ling and Kelly Kai Li Teh

This study investigated what are the effective leadership styles and practices that boost employees’ work outcomes during the COVID-19 pandemic from the perspective of facilities…

Abstract

Purpose

This study investigated what are the effective leadership styles and practices that boost employees’ work outcomes during the COVID-19 pandemic from the perspective of facilities management professionals (FMPs).

Design/methodology/approach

Three predominant leadership styles (transformational, transactional contingent reward and disaster management) were operationalized into 38 leadership practices (X variables) and 8 work outcomes (Y variables). The explanatory sequential research design was adopted. Online questionnaire survey was first conducted on FMPs who managed facilities during the critical periods of COVID-19 pandemic in Singapore. In-depth interviews were then carried out with subject matter experts to elaborate on the quantitative findings.

Findings

During the pandemic, FMPs were significantly stressed at work, but also experienced significant job satisfaction and satisfaction with their leaders/supervisors. Statistical results revealed a range of leadership practices that are significantly correlated with FMPs’ work outcomes. One leadership practice is critical as it affects 4 of the 8 FMPs’ work outcomes - frequently acknowledging employees’ good performance during the pandemic.

Research limitations/implications

The study explored 3 leadership styles. There are other styles like laissez faire and servant leadership that might also affect work outcomes.

Practical implications

Based on the findings, suggestions were provided to organizations that employ FMPs on how to improve their work outcomes during a crisis such as a pandemic.

Originality/value

The novelty is the discovery that in the context of a global disaster such as the COVID-19 pandemic, the most relevant leadership styles to boost employees’ work outcomes are transactional contingent reward and disaster management leadership. The study adds to knowledge by showing that not one leadership style is superior – all 3 styles are complementary, but distinct, forms of leadership that need to work in tandem to boost FMPs’ work outcomes during a crisis such as a pandemic.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 January 2024

Frank Ato Ghansah and Weisheng Lu

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the…

Abstract

Purpose

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.

Design/methodology/approach

This is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.

Findings

The study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.

Practical implications

The findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.

Originality/value

The study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 December 2023

Huifeng Xi, Xiangbo Shu, Manjie Chen, Huanliang Zhang, Shi-qing Huang and Heng Xiao

The primary objective of this study is characterizing the anisotropic mechanical properties of corrugated cardboard and simultaneously simulating its drop cushioning dynamic…

Abstract

Purpose

The primary objective of this study is characterizing the anisotropic mechanical properties of corrugated cardboard and simultaneously simulating its drop cushioning dynamic effects under various drop conditions.

Design/methodology/approach

Static and dynamic tests were conducted on corrugated cardboard to obtain adequate experimental data in different directions. An effective anisotropic constitutive model is introduced by developing the honeycomb materials model in ANSYS LS-Dyna, and an effective approach is established toward effectively determining the material parameters from the test data obtained. The model is validated by comparing simulation results with experimental data from five drop conditions, including bottom drop, front drop, side drop, 30° side drop and edge drop. Additionally, simulations are conducted to study the cushioning performance of the packaging by dropping the corrugated cardboard at different heights.

Findings

The study establishes a fast and effective approach to simulating the drop cushioning performance of corrugated cardboard under various drop conditions, which demonstrates good agreement with experimental data.

Originality/value

This approach is of value for packaging protection and provides guidance for stacking of packaging during transportation.

Details

Multidiscipline Modeling in Materials and Structures, vol. 20 no. 1
Type: Research Article
ISSN: 1573-6105

Keywords

Article
Publication date: 24 November 2022

Linlin Xie, Ziyuan Luo and Bo Xia

From a psychosocial perspective, this study aims to understand the impact of psychosocial safety climate (PSC) on the intent to stay of construction workers and provides practical…

Abstract

Purpose

From a psychosocial perspective, this study aims to understand the impact of psychosocial safety climate (PSC) on the intent to stay of construction workers and provides practical recommendations for construction enterprises to retain construction workers.

Design/methodology/approach

This study proposes the conceptual framework explained by the conservation of resources (COR) theory and develops a mediation model of “PSC – job satisfaction – intent to stay” within the framework supported by the stimulus–organism–response (SOR) model. Then, a questionnaire survey of 489 construction workers in Guangzhou was conducted and structural equation modeling (SEM) analysis was performed on the data collected.

Findings

Results show that PSC has a significant and positive effect on job satisfaction and intent to stay. In addition, job satisfaction partially mediates the effect of PSC on intent to stay. Hence, the theoretical model of “PSC – job satisfaction – intent to stay” has been empirically tested and supported.

Originality/value

This study is the first to investigate the effect of PSC on intent to stay and enriches the research on the retention of construction workers. The COR theory explains well the mechanism of PSC influence on intent to stay, thus expanding its application to the construction field. Moreover, this study provides practical recommendations for construction enterprises to retain workers so as to build a stable and productive workforce.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988