To view the access options for this content please click here
Article
Publication date: 28 September 2020

Abd-Elrahman Hassanein Abd-Elrahman and Jaber Mohamed Ahmed Kamal

The purpose of this paper is to empirically investigate the mediating effect of service quality (SQ) in the relationship between relational capital (RC) and organizational…

Abstract

Purpose

The purpose of this paper is to empirically investigate the mediating effect of service quality (SQ) in the relationship between relational capital (RC) and organizational performance (OP) within the Egyptian mobile telecommunication setting.

Design/methodology/approach

A valid research instrument was utilized to conduct a survey of 384 top- middle- and supervisory- level managers from three Egyptian mobile telecommunications companies. The hypothesized direct relationships were tested through multiple linear regression, and the mediating effect was tested using a structural equation modeling technique.

Findings

The results revealed that the firm's “customer and supplier relations” and “marketing capability” positively affect both OP and SQ, “customer knowledge” positively affects SQ only, while “strategic alliances, licensing and agreements” do not have an association with SQ or OP. Moreover, SQ was found fully mediating the effect of RC on OP.

Research limitations/implications

This is an empirical research applied in the Egyptian telecommunication setting. Its results need further investigation in other settings and countries. Also, traditional limitations of a cross-sectional study apply with respect to the attribution of causality and the time lag effects.

Practical implications

The optimal procedure for the Egyptian telecommunications companies is to focus their efforts on leveraging all four components of RC in order to improve SQ and consequently enhance their OP. The telecommunications companies must do all they can to connect the unconnected. As the current COVID-19 pandemic crisis has shown, connectivity is a public good.

Originality/value

This is the first research that merges the concepts of RC, SQ and OP in an integrated model, and tests this model empirically in the Egyptian mobile telecommunications setting.

Details

International Journal of Emerging Markets, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-8809

Keywords

To view the access options for this content please click here
Article
Publication date: 30 July 2020

Mukhtar A Kassem, Muhamad Azry Khoiry and Noraini Hamzah

The oil and gas construction projects are affected negatively by the drop in oil price in recent years. Thus, most engineering, procurement and construction (EPC…

Abstract

Purpose

The oil and gas construction projects are affected negatively by the drop in oil price in recent years. Thus, most engineering, procurement and construction (EPC) companies are opting to optimize the project mainly to mitigate the source of risks in construction to achieve the project expectation. Risk factors cause a threat to the project objectives regarding time, cost and quality. It is additionally a vital component in deviating from the client's expectation of productivity, safety and standards. This research aims to investigate the causes of risk in the oil and gas construction projects in Yemen.

Design/methodology/approach

A comprehensive literature review from various sources including books, conference proceedings, the Internet project management journals and oil and gas industry journals was conducted to achieve the objectives of this study. This initial work was predicated strictly on a literature review and the judgments of experts to develop the risk factor framework for the oil and gas construction projects in Yemen.

Findings

The authors found a few studies related to risk factors in oil and gas construction projects and shared a similar view about general construction projects. However, only a fraction of the factors accepted have included the variances of other studies on a regional basis or specific countries, such as the Yemen situation, due to the differences between the general construction industry and oil and gas industry. Moreover, the factors of these attributes were still accepted due to their applicability to the oil and gas industry, and no significant variances existed between countries. Research has indicated that 51 critical factors cause risks in the oil and gas construction projects in Yemen. Such risk factors can be divided into two major groups: (1) internal risk factors, including seven critical sources of risks, namely client, contractor, consultant, feasibility study and design, tendering and contract, resources and material supply and project management; and (2) external risk factors, including six sources of critical risk factors, namely national economic, political risk, local people, environment and safety, security risk and force-majeure-related risk factors. A risk factor framework was developed to identify the critical risk factors in the oil and gas construction projects in Yemen.

Research limitations/implications

This research was limited to the oil and gas construction projects.

Practical implications

Practically, this study highlights the risk factors that cause a negative effect on the success of oil and gas construction projects in Yemen. The identification of these factors is the first step in the risk management process to develop strategic responses for risks and enhance the chances of project success.

Social implications

The identification of risks factors that cause the failure of construction projects helps develop response strategies for these risks, thereby increasing the chances of project success reflected in the oil and gas sector, which is a main tributary of the national economy in developing countries.

Originality/value

This research is the pioneer for future investigations into this vital economic sector. Given the lack of resources and studies in the field of construction projects for the Yemeni oil and gas sector, the Yemeni government, oil companies and researchers in this field are expected to benefit from the results of this study. The critical risk factors specific to the oil and gas construction projects in Yemen should be further investigated with focus only on Yemen and its oil and gas industry players.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords