Search results

1 – 10 of 14
Article
Publication date: 6 September 2022

Zul-Atfi Bin Ismail

The improper evaluation and information management of circular economy (CE) (i.e. design, planning, supply chain, waste pile and material hazard) is critical for public health and…

Abstract

Purpose

The improper evaluation and information management of circular economy (CE) (i.e. design, planning, supply chain, waste pile and material hazard) is critical for public health and is a major problem in the waste management of precast concrete (PC) building manufacture and construction and demolition wastes industry. The CE model is particularly problematic for PC building construction projects where the standard practices for the total number of waste building materials are not appropriate and do not match the safe disposal design specification, such as the recent number increase in the Malaysian illegal construction waste pile during the Movement Control Order (11 March 2021, about 5 out of 29 landfills related to states enforcing Act 672). The study aims to develop a framework application (i.e. Building Information Modelling [BIM]) that supports intelligent waste recycling management and sophisticated CE model system solutions.

Design/methodology/approach

Thus, the development of a new BIM-based programming algorithm approach is proposed for optimising CE in accordance with the needs of the current PC building construction schemes. As a precursor to this study, the concepts of CE practices are reviewed and the main features of BIM tools and techniques currently being employed on such projects are presented.

Findings

Sophisticated CE system solutions are described as an essential component of this optimisation to reduce the amount of waste generated at the end of the life cycle of PC building construction projects and to better manage the resources used throughout it.

Originality/value

Finally, the potential for a research framework for developing such a system in the future is presented.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 July 2023

Bowen Zheng, Mudasir Hussain, Yang Yang, Albert P.C. Chan and Hung-Lin Chi

In the last decades, various building information modeling–life cycle assessment (BIM-LCA) integration approaches have been developed to assess the environmental impact of the…

Abstract

Purpose

In the last decades, various building information modeling–life cycle assessment (BIM-LCA) integration approaches have been developed to assess the environmental impact of the built asset. However, there is a lack of consensus on the optimal BIM-LCA integration approach that provides the most accurate and efficient assessment outcomes. To compare and determine their accuracy and efficiency, this study aimed to investigate four typical BIM-LCA integration solutions, namely, conventional, parametric modeling, plug-in and industry foundation classes (IFC)-based integration.

Design/methodology/approach

The four integration approaches were developed and applied using the same building project. A quantitative technique for evaluating the accuracy and efficiency of BIM-LCA integration solutions was used. Four indicators for assessing the performance of BIM-LCA integration were (1) validity of LCA results, (2) accuracy of bill-of-quantity (BOQ) extraction, (3) time for developing life cycle inventories (i.e. developing time) and (4) time for calculating LCA results (i.e. calculation time).

Findings

The results show that the plug-in-based approach outperforms others in developing and calculation time, while the conventional one could derive the most accuracy in BOQ extraction and result validity. The parametric modeling approach outperforms the IFC-based method regarding BOQ extraction, developing time and calculation time. Despite this, the IFC-based approach produces LCA outcomes with approximately 1% error, proving its validity.

Originality/value

This paper forms one of the first studies that employ a quantitative and objective method to determine the performance of four typical BIM-LCA integration solutions and reveal the trade-offs between the accuracy and efficiency of the integration approaches. The findings provide practical references for LCA practitioners to select appropriate BIM-LCA integration approaches for evaluating the environmental impact of the built asset during the design phase.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 March 2022

Muhammad Usman Shahid, Muhammad Jamaluddin Thaheem and Husnain Arshad

The construction industry struggles in environmental and economic performance due to waste generation. Several studies have measured this waste in the construction industry of…

Abstract

Purpose

The construction industry struggles in environmental and economic performance due to waste generation. Several studies have measured this waste in the construction industry of developing countries like India, Brazil, China, Nigeria and Iran, and proposed strategies to enhance the overall efficiency. But no such work exists in Pakistan's context. The construction industry of Pakistan contributes significantly to the country's gross domestic product (GDP). And with several mega projects in progress to overcome the energy crises and improve the infrastructure of the country, the absence of proper waste management policies and plans calls for empirical research. Therefore, this study quantifies and benchmarks material waste in the local context, its impact on project cost and the effect of multiple subcontracting arrangements on waste generation. It also proposes a conceptual waste management plan (WMP) for local conditions which can be generalized for developing countries.

Design/methodology/approach

This paper uses a mixed research approach by leveraging Saunders's research onion model. To benchmark the current wastage practices, quantitative data of material waste in the Pakistani construction industry are gathered through document review of accounting systems, inventory and payment records of 40 completed building projects. Using the data, the waste rate of different materials is measured along with their impact on cost. Additionally, the role of subcontracting arrangements in waste generation is also investigated. Also, semi-structured interviews are conducted with project managers of high- and low-performing construction organizations to propose a conceptual WMP for the local industry and developing countries.

Findings

The highest wasteful materials by quantity are wood, sand and concrete blocks, and those by cost are wood, bricks and steel. By quantity, 123% more material was used on average than the actual productive work. Also, the labor only (L-O) subcontracting arrangement causes maximum waste. Moreover, the difference between the highest (155%) and lowest wasting company (104%) is 51%, highlighting the proactive and resistive waste management culture and approach by the worst- and best-performing companies. Further, the impact of waste quantities is more than 2% of the project cost. Finally, a conceptual model consisting of measures at the project, industry and national levels is also proposed as a guide for developing countries.

Practical implications

The findings of this benchmarking study can help improve the project planning, execution and monitoring, and control practices by providing a better understanding of the material waste potential. This will help economize the construction industry and improve its sustainability.

Originality/value

This is the first benchmarking study that quantitatively measures material waste in the construction industry of Pakistan. It highlights that costly as well as sustainability-implicating materials are frequently wasted in the local construction projects. Also, this study correlates the wastage with subcontracting arrangements. Additionally, an original conceptual WMP is proposed that could help the industry improve its performance. The findings could help the construction professionals identify the loopholes in their material management practices and not only save money but also ensure better sustainability.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 October 2023

Christian Novak, Lukas Pfahlsberger, Saimir Bala, Kate Revoredo and Jan Mendling

Digitalization, innovation and changing customer requirements drive the continuous improvement of an organization's business processes. IT demand management (ITDM) as a…

Abstract

Purpose

Digitalization, innovation and changing customer requirements drive the continuous improvement of an organization's business processes. IT demand management (ITDM) as a methodology supports the holistic governance of IT and the corresponding business process change (BPC), by allocating resources to meet a company's requirements and strategic objectives. As ITDM decision-makers are not fully aware of how the as-is business processes operate and interact, making informed decisions that positively impact the to-be process is a key challenge.

Design/methodology/approach

In this paper, the authors address this challenge by developing a novel approach that integrates process mining and ITDM. To this end, the authors conduct an action research study where the researchers participated in the design, creation and evaluation of the approach. The proposed approach is illustrated using two sample demands of an insurance claims process. These demands are used to construct the artefact in multiple research circles and to validate the approach in practice. The authors applied learning and reflection methods for incrementally adjusting this study’s approach.

Findings

The study shows that the utilization of process mining activities during process changes on an operational level contributes to (1) increasing accuracy and efficiency of ITDM; (2) timely identification of potential risks and dependencies and (3) support of testing and acceptance of IT demands.

Originality/value

The implementation of this study’s approach improved ITDM practice. It appropriately addressed the information needs of decision-makers and unveiled the effects and consequences of process changes. Furthermore, providing a clearer picture of the process dependencies clarified the responsibilities and the interfaces at the intra- and inter-process level.

Details

Business Process Management Journal, vol. 29 no. 8
Type: Research Article
ISSN: 1463-7154

Keywords

Article
Publication date: 29 June 2023

Mayara Regina Munaro and Sergio Fernando Tavares

Design for adaptability and disassembly (DfAD) is an effective method to reduce construction and demolition waste generation, landfill loads and greenhouse gas generation;…

Abstract

Purpose

Design for adaptability and disassembly (DfAD) is an effective method to reduce construction and demolition waste generation, landfill loads and greenhouse gas generation; preserve natural resources; and increase environmental awareness in the construction industry. However, it is an underexplored strategy due to a lack of information about projects and a set of agreed guidelines to guide buildings deconstruction. This study aims to understand how DfAD can support the sector’s transition toward circularity.

Design/methodology/approach

Through an integrative literature review, this study analyzed the current publications and terminologies used, identified the main themes discussed and described the key criteria for integrating deconstruction in the building design stage.

Findings

The results showed that the term DfAD encompasses different ecodesign strategies and is concentrated in six major thematic categories (design and construction principles, tools for DfAD, components and connections for DfAD, barriers, drivers and guidelines for DfAD, existing building stock potential and selective deconstruction process). In total, 60 criteria were presented to guide the deconstruction of buildings, emphasizing standardization, modularization and prefabrication of materials and components as fundamental requirements.

Originality/value

The study highlighted the need to expand the knowledge and training of the design team, establish public policies and tax incentives and develop tools, methods, and circular indicators to enable the implementation of deconstruction strategies for buildings.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 4 March 2024

Hemanth Kumar N. and S.P. Sreenivas Padala

The construction industry is tasked with creating sustainable, efficient and cost-effective buildings. This study aims to develop a building information modeling (BIM)-based…

Abstract

Purpose

The construction industry is tasked with creating sustainable, efficient and cost-effective buildings. This study aims to develop a building information modeling (BIM)-based multiobjective optimization (MOO) model integrating the nondominated sorting genetic algorithm III (NSGA-III) to enhance sustainability. The goal is to reduce embodied energy and cost in the design process.

Design/methodology/approach

Through a case study research method, this study uses BIM, NSGA-III and real-world data in five phases: literature review, identification of factors, BIM model development, MOO model creation and validation in the architecture, engineering and construction sectors.

Findings

The innovative BIM-based MOO model optimizes embodied energy and cost to achieve sustainable construction. A commercial building case study validation showed a reduction of 30% in embodied energy and 21% in cost. This study validates the model’s effectiveness in integrating sustainability goals, enhancing decision-making, collaboration, efficiency and providing superior assessment.

Practical implications

This model delivers a unified approach to sustainable design, cutting carbon footprint and strengthening the industry’s ability to attain sustainable solutions. It holds potential for broader application and future integration of social and economic factors.

Originality/value

The research presents a novel BIM-based MOO model, uniquely focusing on sustainable construction with embodied energy and cost considerations. This holistic and innovative framework extends existing methodologies applicable to various buildings and paves the way for additional research in this area.

Article
Publication date: 19 June 2023

Abdelrahman M. Farouk and Rahimi A. Rahman

Implementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study…

Abstract

Purpose

Implementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study aims to review the current trends in the application of BIM in project cost management.

Design/methodology/approach

This study systematically reviews the literature on the application of BIM in project cost management. A total of 46 related articles were identified and analyzed using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses method.

Findings

Eighteen approaches to applying BIM in project cost management were identified. The approaches can be grouped into cost control and cost estimation. Also, BIM can be applied independently or integrated with other techniques. The integrated approaches for cost control include integration with genetic algorithms, Monte Carlo simulation, lean construction, integrated project delivery, neural network and value engineering. On the contrary, integrated approaches for cost estimation include integration with cost-plus pricing, discrepancy analysis, construction progress curves, estimation standards, algorithms, declarative mappings, life cycle sustainability assessment, ontology, Web-based frameworks and structured query language.

Originality/value

To the best of the authors’ knowledge, this study is the first to systematically review prior literature on the application of BIM in project cost management. As a result, the study provides a comprehensive understanding of the current state of the art and fills the literature gap. Researchers and industry professionals can use the study findings to increase the benefits of implementing BIM in construction projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 4 August 2022

Jianjin Yue, Wenrui Li, Jian Cheng, Hongxing Xiong, Yu Xue, Xiang Deng and Tinghui Zheng

The calculation of buildings’ carbon footprint (CFP) is an important basis for formulating energy-saving and emission-reduction plans for building. As an important building type…

Abstract

Purpose

The calculation of buildings’ carbon footprint (CFP) is an important basis for formulating energy-saving and emission-reduction plans for building. As an important building type, there is currently no model that considers the time factor to accurately calculate the CFP of hospital building throughout their life cycle. This paper aims to establish a CFP calculation model that covers the life cycle of hospital building and considers time factor.

Design/methodology/approach

On the basis of field and literature research, the basic framework is built using dynamic life cycle assessment (DLCA), and the gray prediction model is used to predict the future value. Finally, a CFP model covering the whole life cycle has been constructed and applied to a hospital building in China.

Findings

The results applied to the case show that the CO2 emission in the operation stage of the hospital building is much higher than that in other stages, and the total CO2 emission in the dynamic and static analysis operation stage accounts for 83.66% and 79.03%, respectively; the difference of annual average emission of CO2 reached 28.33%. The research results show that DLCA is more accurate than traditional static life cycle assessment (LCA) when measuring long-term objects such as carbon emissions in the whole life cycle of hospital building.

Originality/value

This research established a carbon emission calculation model that covers the life cycle of hospital building and considered time factor, which enriches the research on carbon emission of hospital building, a special and extensive public building, and dynamically quantifies the resource consumption of hospital building in the life cycle. This paper provided a certain reference for the green design, energy saving, emission reduction and efficient use of hospital building, obviously, the limitation is that this model is only applicable to hospital building.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 March 2024

Sihao Li, Jiali Wang and Zhao Xu

The compliance checking of Building Information Modeling (BIM) models is crucial throughout the lifecycle of construction. The increasing amount and complexity of information…

Abstract

Purpose

The compliance checking of Building Information Modeling (BIM) models is crucial throughout the lifecycle of construction. The increasing amount and complexity of information carried by BIM models have made compliance checking more challenging, and manual methods are prone to errors. Therefore, this study aims to propose an integrative conceptual framework for automated compliance checking of BIM models, allowing for the identification of errors within BIM models.

Design/methodology/approach

This study first analyzed the typical building standards in the field of architecture and fire protection, and then the ontology of these elements is developed. Based on this, a building standard corpus is built, and deep learning models are trained to automatically label the building standard texts. The Neo4j is utilized for knowledge graph construction and storage, and a data extraction method based on the Dynamo is designed to obtain checking data files. After that, a matching algorithm is devised to express the logical rules of knowledge graph triples, resulting in automated compliance checking for BIM models.

Findings

Case validation results showed that this theoretical framework can achieve the automatic construction of domain knowledge graphs and automatic checking of BIM model compliance. Compared with traditional methods, this method has a higher degree of automation and portability.

Originality/value

This study introduces knowledge graphs and natural language processing technology into the field of BIM model checking and completes the automated process of constructing domain knowledge graphs and checking BIM model data. The validation of its functionality and usability through two case studies on a self-developed BIM checking platform.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 November 2022

Luna Đurić, James Kennell, Miroslav D. Vujičić, Igor Stamenković and Jelena Farkić

This research explores how protest events can change and develop over time, through an analysis of stakeholder perceptions of the EXIT festival in Serbia. In doing this, it builds…

Abstract

Purpose

This research explores how protest events can change and develop over time, through an analysis of stakeholder perceptions of the EXIT festival in Serbia. In doing this, it builds on previous research into protest events from a critical events studies perspective and has implications for the management and understanding of events linked to social movements.

Design/methodology/approach

This research took a neo-institutionalist perspective and is based on 18 stakeholder interviews, which were analysed using reflexive thematic analysis. Purposive sampling in the highly-networked city of Novi Sad, Serbia, allowed for the inclusion of diverse participants from politics, NGOs, media and the festival itself.

Findings

The findings reveal that the EXIT festival has departed significantly from its original protest roots. Although it is now perceived as part of the dominant political culture in Serbia, it still has the potential to campaign on issues of relevance to the region, which is unrealised. This research demonstrates that the neo-institutionalist perspective can offer fresh insights for research into protest events. Taking this perspective suggests practical implications for the managers of events with protest roots and for social movements seeking to use protestival-style methods to achieve social change.

Originality/value

This paper provides a new theoretical perspective on protest events and proposes a new model that can be used in future research into protest events that persist over time. It also suggests implications for the management and development of protest events within social movements.

Details

International Journal of Event and Festival Management, vol. 14 no. 2
Type: Research Article
ISSN: 1758-2954

Keywords

1 – 10 of 14