Article
Publication date: 31 October 2023

Eziaku Onyeizu Rasheed, Maryam Khoshbakht and George Baird

This paper aims to illustrate the extensive benefits of qualitative data analysis as a rarely undertaken process in post-occupancy evaluation surveys. As a result, there is…

Abstract

Purpose

This paper aims to illustrate the extensive benefits of qualitative data analysis as a rarely undertaken process in post-occupancy evaluation surveys. As a result, there is limited evidence of what occupants say about their buildings, especially for operational parameters, as opposed to how they rate them. While quantitative analyses provide useful information on how workers feel about workplace operational factors, qualitative analyses provide richer information on what aspects of the workplace workers identify as influential to their comfort, well-being and productivity.

Design/methodology/approach

The authors analysed 6,938 comments from office buildings worldwide on workers’ perception of workplace operational factors: design, storage, needs, space at desks and storage in their work environments. These factors were analysed based on the buildings’ design intent and use, and the associated comments were coded into positive, negative and balanced comments. The authors used a combination of coding, descriptive analysis, content analysis and word cloud to dissect the comments.

Findings

The findings showed that whereas workers rated these operational factors favourably, there were significantly more negative comments about each factor. Also, the Chi-square test showed a significant association (p < 0.01) between the satisfaction scale and the type of comments received for all the operational factors. This means that when a factor is rated high in the satisfaction score (5–7), there were fewer negative and more positive comments and vice versa. The word cloud analysis highlighted vital aspects of the office environment the workers mostly commented on, such as open plan design, natural lighting, space and windows, toilets, facilities, kitchens, meeting room booking systems, storage and furniture.

Research limitations/implications

This study highlights the importance of dissecting building occupants’ comments as integral to building performance monitoring and measurement. These emphasise the richness and value of respondents’ comments and the importance of critically analysing them. A limitation is that only 6,938 comments were viable for analysis because most comments were either incomplete with no meaning or were not provided. This underlines the importance of encouraging respondents to comment and express their feelings in questionnaire surveys. Also, the building use studies questionnaire data set presents extensive opportunities for further analyses of interrelationships between demographics, building characteristics and environmental and operational factors.

Practical implications

The findings from this study can be applied to future projects and facility management to maintain and improve office buildings throughout their life cycle. Also, these findings are essential in predicting the requirements of future workplaces for robust workplace designs and management.

Originality/value

The authors identified specific comments on the performance of workplaces across the globe, showing similarities and differences between sustainable, conventional, commercial and institutional buildings. Specifically, the analysis showed that office workers’ comments do not always corroborate the ratings they give their buildings. There was a significantly higher percentage of negative comments than positive comments despite the high satisfaction scores of the operational factors.

Details

Facilities , vol. 42 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 3 November 2023

Kavya Jain and Ganesh Devkar

Set-based design (SBD) is a lean tool widely adopted for improving design processes and providing value maximization to clients. The purpose of this paper is to present the…

Abstract

Purpose

Set-based design (SBD) is a lean tool widely adopted for improving design processes and providing value maximization to clients. The purpose of this paper is to present the development and testing of a lean simulation game that incorporated point-based and SBD principles. The objective of the game was to enhance learning of lean design management among construction students.

Design/methodology/approach

After a thorough and comprehensive literature review consisting of secondary data in journal papers, books, thesis references and primary data in the form of interviews with lean practitioners, the simulation game prototype was developed. The testing of the game was carried out with a study group. Data were collected during the gameplay with the help of a questionnaire survey on a confidence scale and Likert scale and assessed using the Wilcoxon signed-rank test, histogram, one-sample t-test and false discovery rate (Benjamini–Hochberg) correction method.

Findings

The data collected both pre- and post-simulation showed an increase in average confidence in understanding from 3.33 to 3.89, a 16.7% rise. The data was further interpreted by using Wilcoxon signed-rank test, indicating that the post-simulation learning experience was significantly better than the pre-simulation one. Promising positive results were obtained for the questions on game design, engagement and understanding of point-based design and SBD concepts.

Originality/value

The simulation game helps bridge the gap between knowledge building and real-life by effectively imitating the process. The game facilitates a dynamic and critical approach toward developing new educational simulation games and their successful incorporation in propagating lean principles in the construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 September 2022

Adel Alotaibi and Aamir Abbas

The study aims to investigate the effect of Islamic religiosity on green purchase intention. The environmental dimension of spiritual well-being (i.e. environmental well-being…

Abstract

Purpose

The study aims to investigate the effect of Islamic religiosity on green purchase intention. The environmental dimension of spiritual well-being (i.e. environmental well-being) was analyzed as a mediator and green skepticism as a moderator.

Design/methodology/approach

The millennial generation was considered for data collection, and their preference toward green food was investigated by using a questionnaire. The responses were analyzed by using AMOS.

Findings

The results highlighted that Islamic religiosity significantly effects the green food purchase intention of the millennial generation. This relation is positively mediated by the environmental dimension of spiritual well-being (i.e. environmental well-being). Moreover, the green skepticism weakens the relationship between Islamic religiosity and green purchase intention.

Research limitations/implications

The main emphasis of this research was on the millennial generation, and only their selection criteria for green food were considered. Moreover, the study has only considered the environmental dimension of spiritual well-being (i.e. environmental well-being) and ignored the other dimensions, including transcendental and personal/communal well-being. Therefore, future studies can focus on these dimensions while highlighting the purchase behavior toward other green or eco-friendly products.

Practical implications

The research has discussed the broader areas, and it can help marketers, religious scholars, farmers and managers to make efficient strategies for the millennial generation. The researchers focusing on green consumer behavior and sustainable issues can consider this study as a guideline for investigating the Muslim millennial generation’s behavior.

Originality/value

The study is to investigate the effect Islamic religiosity on green purchase intention. It has focused on all sustainable aspects, including green well-being, green skepticism to analyze the green purchase intention of millennial generation.

Details

Journal of Islamic Marketing, vol. 14 no. 9
Type: Research Article
ISSN: 1759-0833

Keywords

Article
Publication date: 29 November 2022

Ronaldo Gomes Dultra-de-Lima and Luiz Artur Ledur Brito

The absorptive capacity (AC) leads to firm performance and influences the development and evolution of capabilities and routines, but the influence of AC in projects remains…

Abstract

Purpose

The absorptive capacity (AC) leads to firm performance and influences the development and evolution of capabilities and routines, but the influence of AC in projects remains unclear. Therefore, this study aims to investigate the effect of AC on project performance (PP) in the construction industry of Sao Paulo State, Brazil.

Design/methodology/approach

The authors conducted a survey questionnaire with project managers and collected 157 responses in the construction sector. They also used confirmatory factor analysis (CFA) and multiple linear regression techniques to assess the data.

Findings

The study provides empirical evidence that realized absorptive capacity (RAC) has a direct and indirect positive effect on PP. Conversely, the potential absorptive capacity (PAC) only indirectly impacts PP through project management practices (PMPs). PAC and RAC positively influence PMPs that in turn positively influence PP. The findings reinforce the relevance of AC to the development of internal knowledge for processes and routines, thereby enhancing PP.

Practical implications

The findings provide practical implications: the AC influences PP by refining and adapting routines. Moreover, the consistent application of accepted practices is not enough for PP, but the ability to adapt, adjust and transform the relevant knowledge into routines.

Originality/value

This paper provides empirical evidence that the knowledge application of PMPs improves organizational performance through PP. However, despite what the literature has discussed, this paper proved that AC has no effect as a moderating factor between PMPs and performance; however, AC's role significantly impacts PP through PMPs.

Details

International Journal of Managing Projects in Business, vol. 16 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 4 August 2023

Hezekiah Farayola Olaniran and Bolatito Folasade Akinbile

Despite the contributions of both the oil and gas and construction industries to the gross domestic product (GDP) of the country, both industries are still marred by incessant…

1197

Abstract

Purpose

Despite the contributions of both the oil and gas and construction industries to the gross domestic product (GDP) of the country, both industries are still marred by incessant accidents. Therefore, the aim of this study is to compare the health and safety practises of the construction and oil and gas industries in Nigeria in order to suggest the best approach to health and safety practices.

Design/methodology/approach

A survey questionnaire was developed and administered to professionals working in the construction and oil and gas industries. Data were analysed using the relative importance index (RII). An independent sample t-test was also conducted to determine whether there was a significant difference in the construction and oil and gas industries.

Findings

The study revealed that the rate at which health and safety are practised in the oil and gas industry is comparatively high compared to how they are practised in the construction industry. Proper site layout and planning, provision of a safe working environment, proper health and safety risk assessment were more predominantly practised in the oil and gas industry, while proper site layout and planning, disallowing unauthorised entry into site and the provision of a safe working environment were predominantly practised in the construction industry.

Originality/value

This study is the first to compare the health and safety practises of the construction and oil and gas industries in Nigeria. This study was significant because it would provide insight into construction and oil and gas managers, as well as other decision-makers in both industries, on how to improve health and safety practices.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 4
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 7 September 2021

Christian Nnaemeka Egwim, Hafiz Alaka, Luqman Olalekan Toriola-Coker, Habeeb Balogun, Saheed Ajayi and Raphael Oseghale

This paper aims to establish the most underlying factors causing construction projects delay from the most applicable.

Abstract

Purpose

This paper aims to establish the most underlying factors causing construction projects delay from the most applicable.

Design/methodology/approach

The paper conducted survey of experts using systematic review of vast body of literature which revealed 23 common factors affecting construction delay. Consequently, this study carried out reliability analysis, ranking using the significance index measurement of delay parameters (SIDP), correlation analysis and factor analysis. From the result of factor analysis, this study grouped a specific underlying factor into three of the six applicable factors that correlated strongly with construction project delay.

Findings

The paper finds all factors from the reliability test to be consistent. It suggests project quality control, project schedule/program of work, contractors’ financial difficulties, political influence, site conditions and price fluctuation to be the six most applicable factors for construction project delay, which are in the top 25% according to the SIDP score and at the same time are strongly associated with construction project delay.

Research limitations/implications

This paper is recommending that prospective research should use a qualitative and inductive approach to investigate whether any new, not previously identified, underlying factors that impact construction projects delay can be discovered as it followed an inductive research approach.

Practical implications

The paper includes implications for the policymakers in the construction industry in Nigeria to focus on measuring the key suppliers’ delivery performance as late delivery of materials by supplier can result in rescheduling of work activities and extra time or waiting time for construction workers as well as for the management team at site. Also, construction stakeholders in Nigeria are encouraged to leverage the amount of data produced from backlog of project schedules, as-built drawings and models, computer-aided designs (CAD), costs, invoices and employee details, among many others through the aid of state-of-the-art data driven technologies such as artificial intelligence or machine learning to make key business decisions that will help drive further profitability. Furthermore, this study suggests that these stakeholders use climatological data that can be obtained from weather observations to minimize impact of bad weather during construction.

Originality/value

This paper establishes the three underlying factors (late delivery of materials by supplier, poor decision-making and Inclement or bad weather) causing construction projects delay from the most applicable.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 February 2022

Hany Omar and Lamine Mahdjoubi

Poor performance remains a challenge for the construction industry worldwide. One of the key performance indicators of the construction industry is the timely delivery of…

Abstract

Purpose

Poor performance remains a challenge for the construction industry worldwide. One of the key performance indicators of the construction industry is the timely delivery of projects. Despite the recent methodological and technological advances in the field, project-overrun remains a significant challenge for the industry. This paper seeks to propose practical solutions that allow overcoming the challenges and promote the opportunities for improving the performance of the construction projects in Dubai.

Design/methodology/approach

This study focussed on the construction projects in Dubai; therefore, this research adopted a sequential mixed approach in two stages. The first stage involved face-to-face interviews with seven carefully selected construction professionals. Their answers were analysed to provide with the literature study “the informed-basis for the development of the online questionnaire”. The second stage involved an online survey administrated to 425 carefully selected construction organisations working in Dubai. Accordingly, a meticulous analysis for the prime causes of project overruns has also been undertaken. This analysis assisted proposing the most suitable solutions-based technologies that enabled alleviating overruns in the construction projects.

Findings

The findings revealed that, there was a consensus agreement on the formidable opportunities for improving the performance of the construction industry in general and in particular in Dubai. These opportunities are intrinsically linked with the adoption of the latest technologies such as building information modelling, augmented reality, virtual reality and the artificial intelligence (AI). Whereas, adopting AI has already assisted two public authorities to release No Objection Certificates and work permits effectively within one day instead of 14 working days, which has saved 90% of the time and cost. Likewise, adoption of the AI has assisted delivering the construction project with a 9% of time saving and a 6% of cost saving due to embracing an automated system that enabled them to instantly detect and report the delays, once occurred.

Research limitations/implications

The main limitation of this study is that the study was limited to the construction industry in the Emirate of Dubai. Therefore, future research could target the whole United Arab Emirates construction industry to propose the practical solution on the country level.

Practical implications

The literature study is replete with solutions, which tend to be theoretical more than practical. Therefore, the proposed practical recommendations will significantly assist the construction industry to improve its suboptimal performance to rescind the sovereignty of the irrelevant involvements. The research recommended establishing independent entity to lead the change in the construction industry; this entity will have the power of enacting rules and legislations. Furthermore, this independent entity will have the power and authority of dictations and impose sanctions on the non-committed organisations that are reluctant to adopt the recommended technologies and approaches.

Originality/value

Based on the findings of the study, this paper draws a road map for the construction industry by determining practical solutions for improvements starting with an establishment of an independent authority that selects and tests the most appropriate technologies and approaches to contribute to performance improvements.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article