Search results

1 – 10 of 16
Article
Publication date: 15 March 2024

James Prater and Konstantinos Kirytopoulos

This research aspires to contribute in the area of exploration of the psychological traits evolving by practitioners within the project management profession. Specifically, it…

Abstract

Purpose

This research aspires to contribute in the area of exploration of the psychological traits evolving by practitioners within the project management profession. Specifically, it investigates whether there is any difference in optimism levels among experienced project management practitioners and newcomers in the profession.

Design/methodology/approach

The research used the life orientation test-revised (LOTR) (Scheier et al., 1994) to calculate respondents’ optimism scores. With these scores at hand, the researchers could then apply inferential statistics in order to deduce any differences observed among optimism score and the respondents’ characteristics (age, years of experience etc.).

Findings

Based on the results of this research, several demographic variables were shown to be statistically significant with optimism. These were (1) the number of years of experience the respondent had in managing projects, (2) working in a government organisation and (3) possessing specific project management certifications, all of which were found to adversely affect the respondent’s optimism score.

Originality/value

This research was unique in applying a well-known psychological test instrument (LOTR) to provide insight into the psychological impacts of a career as an information technology (IT) project manager. It is also highly likely that this correlation between the length of time working as a project manager and the adverse impact on their optimism would also apply to not just IT project managers but all experienced project managers.

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Content available
Book part
Publication date: 30 April 2024

Natalie Wall

Abstract

Details

Black Expression and White Generosity
Type: Book
ISBN: 978-1-80382-758-2

Article
Publication date: 9 April 2024

Bassel Kassem, Matteo Rossini, Stefano Frecassetti, Federica Costa and Alberto Portioli Staudacher

While Digitalisation is gaining momentum among practitioners and the scientific world, there is still a struggle to embark on the digitalisation journey successfully. The…

Abstract

Purpose

While Digitalisation is gaining momentum among practitioners and the scientific world, there is still a struggle to embark on the digitalisation journey successfully. The struggles are more significant for SMEs compared to large companies. Such transformation could face internal resistance, which evokes the need to put it into a socio-technical perspective such as lean. This paper investigates how SMEs could implement digital tools and technologies in their operations.

Design/methodology/approach

We relied on a multiple case study design in three SME manufacturing companies in Italy. Based on the experience of those companies, the struggles in the implementation and the lessons learned, we formulate an implementation model of digital tools driven by lean thinking.

Findings

Companies tend to implement first digital tools that help with real-time data collection and stress that introducing digital tools becomes challenging without reducing waste in production. The model stresses top management commitment, middle-line involvement and operator training to resist change. All these factors coincide with socio-technical lean bundles developed by seminal works. In addition, the study highlights that financial incentives are not necessarily the common barrier to digital tools implementation in SMEs but rather the cultural aspect.

Originality/value

Our paper enriches the extant body of knowledge by deriving knowledge around digitalisation implementation through lessons learned and corrective actions. It allows managers to benchmark and compare the current state of the implementation process with that of other companies and the one proposed to make corrective actions when necessary.

Details

Journal of Manufacturing Technology Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 12 January 2024

Patrik Jonsson, Johan Öhlin, Hafez Shurrab, Johan Bystedt, Azam Sheikh Muhammad and Vilhelm Verendel

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Abstract

Purpose

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Design/methodology/approach

A mixed-method case approach is applied. Explanatory variables are identified from the literature and explored in a qualitative analysis at an automotive original equipment manufacturer. Using logistic regression and random forest classification models, quantitative data (historical schedule transactions and internal data) enables the testing of the predictive difference of variables under various planning horizons and inaccuracy levels.

Findings

The effects on delivery schedule inaccuracies are contingent on a decoupling point, and a variable may have a combined amplifying (complexity generating) and stabilizing (complexity absorbing) moderating effect. Product complexity variables are significant regardless of the time horizon, and the item’s order life cycle is a significant variable with predictive differences that vary. Decoupling management is identified as a mechanism for generating complexity absorption capabilities contributing to delivery schedule accuracy.

Practical implications

The findings provide guidelines for exploring and finding patterns in specific variables to improve material delivery schedule inaccuracies and input into predictive forecasting models.

Originality/value

The findings contribute to explaining material delivery schedule variations, identifying potential root causes and moderators, empirically testing and validating effects and conceptualizing features that cause and moderate inaccuracies in relation to decoupling management and complexity theory literature?

Details

International Journal of Operations & Production Management, vol. 44 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 28 March 2022

Muhammad Ayat, Azmat Ullah and Changwook Kang

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects…

Abstract

Purpose

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects in developing countries.

Design/methodology/approach

The main data set for this study was collected from the World Bank database consisting of 8,951 PPI projects that occurred in developing countries from 1996 to 2020. Hierarchical logistic regression was applied for investigating the effects of USPs on project success. Three moderators, namely, control of corruption, presence of local sponsor and project size were also included in the model to test the impact of their interactions with the USP on the performance of PPI projects. Further, to assess the impact of the effect of USPs, the average marginal effect was calculated. The framework used in this study consists of 18 control variables, three moderators and one noncontrolled independent variable (the USP).

Findings

The results of hierarchical logistic regression indicate that USPs have a significant and negative effect on the success of PPI projects occurring in developing countries. The negative effect of a USP weakens with the presence of local sponsors and stronger control of corruption in the host country. However, contrary to the authors’ expectations, the results show that project size does not significantly affect the association between USPs and the success of PPI projects. Moreover, the results of average marginal effects show that the negative impact of USP on the success of PPI projects ranges between 2.4% and 3.8%.

Originality/value

This study quantifies the negative impact of USP on the success of PPI projects in developing countries, which will be helpful for the practitioners to understand the associated risk with USP projects. Furthermore, it also identifies the moderating roles of control of corruption and the presence of local sponsors on the relationship between USP and the success of PPI projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 February 2024

Quntao Wu, Qiushi Bo, Lan Luo, Chenxi Yang and Jianwang Wang

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the…

Abstract

Purpose

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the fuzzy-set qualitative comparative analysis (fsQCA) method and to provide references for project managers.

Design/methodology/approach

With the continuous development of the economy, society and construction industry, the number and scale of megaprojects are increasing, and the complexity is becoming serious. Based on the relevant literature, the factors affecting the complexity of megaprojects are determined through case analysis, and the paths of factors affecting the complexity are constructed for megaprojects. Then, the fsQCA method is used to analyze the factors affecting the complexity of megaprojects through 245 valid questionnaires from project engineers in this study.

Findings

The results support the correlation between the complexity factors of megaprojects, with six histological paths leading to high complexity and seven histological paths leading to low complexity.

Originality/value

It breaks the limitations of the traditional project complexity field through a “configuration perspective” and concludes that megaproject complexity is a synergistic effect of multiple factors. The study is important for enriching the theory of megaproject complexity and providing complexity governance strategies for managers in megaproject decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 December 2023

Mateusz Trzeciak

The purpose of the article is to identify the factors of the success of the change management process in IT programs.

Abstract

Purpose

The purpose of the article is to identify the factors of the success of the change management process in IT programs.

Design/methodology/approach

The article presents the results of quantitative research conducted among 221 managers involved in the process of IT program management. In addition, to achieve the assumed goal, a factor analysis and cluster analysis were carried out on the basis of which a model of the relationship between success determinants and the change management process in the IT program was built.

Findings

Nine factors significant for the change management of IT programs have been identified. What is more, they illustrate 78.23% of all significant variables that may occur and significantly affect the success of the IT change program. In addition, it was indicated which factors have a significant impact on achieving the success of the program in individual sub-processes of the course of change.

Research limitations/implications

The article identified 38 variables determining the success of an IT program as a result of a literature review. Secondly, the article responds to the call of Teubner (2018) for IT programs and Vuorinen and Martinsuo (2018) for programs of change.

Originality/value

The article complements the current theory with identified factors of success in the change management process in IT programs. In addition, the article presents recommendations for managers regarding the importance of the identified factors and their impact on the success of the program.

Details

Journal of Organizational Change Management, vol. 37 no. 1
Type: Research Article
ISSN: 0953-4814

Keywords

Article
Publication date: 13 July 2023

Qiang Lu, Yihang Zhou, Zhenzeng Luan and Hua Song

This study empirically investigates how ambidextrous innovations and their balancing affect the supply chain financing performance (SCFP) of small and medium-sized enterprises…

Abstract

Purpose

This study empirically investigates how ambidextrous innovations and their balancing affect the supply chain financing performance (SCFP) of small and medium-sized enterprises (SMEs), based on signaling theory. Moreover, this study explores the moderating effect of the breadth and depth of digital technology deployment on the relationship between ambidextrous innovations and the SCFP of SMEs.

Design/methodology/approach

A mixed-methods design is used, including a qualitative study and a quantitative study. Qualitative data have been collected from six multi-cases in different industries. Questionnaire data have been collected from 259 SMEs in China, and a multiple regression model is used to verify the research hypotheses.

Findings

The findings indicate that, in supply chain financing, both exploitative innovation and exploratory innovation are helpful in improving the SCFP of SMEs. For resource-constrained SMEs, a relative balance between exploitative innovation and exploratory innovation can help improve SCFP. The breadth of digital technology deployment can strengthen the relationship between exploitative innovation and SCFP, while the depth of digital technology deployment can weaken the relationship between exploratory innovation and SCFP. In addition, increasing the depth of digital technology deployment strengthens the positive correlation between the relative balance of ambidextrous innovations and SCFP.

Practical implications

To effectively obtain supply chain financing, SMEs can either concentrate their limited resources on a single type of innovation or use relative balance strategies to simultaneously pursue two innovations. In addition, in the process of obtaining supply chain financing by ambidextrous innovations, SMEs should appropriately deploy digital technologies.

Originality/value

This study first deconstructs the impact mechanism of ambidextrous innovation capabilities on SCFP based on signaling theory, and then discusses the balancing effect of ambidextrous innovations on SCFP in the cases of resource-constrained SMEs. This study also goes further and finds the negative moderating effect of digital technology deployment in the process of supply chain financing.

Details

International Journal of Operations & Production Management, vol. 44 no. 2
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 25 January 2024

Mohammad Mehrabioun Mohammadi

This research aims to examine the challenges of recruiting participatory action research (PAR) in managing innovation projects. An enhanced methodology based on PAR was developed…

Abstract

Purpose

This research aims to examine the challenges of recruiting participatory action research (PAR) in managing innovation projects. An enhanced methodology based on PAR was developed to mitigate the challenges related to recruiting PAR in managing innovation projects. The proposed methodology was evaluated by comparing it to established methodologies/frameworks such as Scrum, Design Thinking (DT) and The Lean Startup (TLS). The evaluation aimed to determine the advantages and limitations of the proposed methodology in managing innovation projects.

Design/methodology/approach

The proposed enhanced methodology consists of eight steps, ranging from developing an understanding of the industry and business structure to learning and knowledge management. In addition, the enhanced methodology uses other techniques, such as Force field analysis and 12 boundary questions.

Findings

The research findings indicate that using the proposed methodology can improve the formalization of collaboration in PAR, enabling the organization to respond better to market changes. It helps define the project scope more clearly, encouraging innovation, addressing communication barriers and considering different worldviews and practical issues. Based on the findings, the proposed enhanced methodology could complement other methodologies/frameworks such as Scrum, DT and TLS.

Research limitations/implications

The current research adds to the existing literature by identifying the challenges of recruiting PAR in managing innovation projects. A deductive reasoning process was utilized because there is no comprehensive research concerning the challenges of recruiting PAR in managing innovation projects. On the other hand, the PAR 4-phase cycle has been reviewed and enhanced to manage innovation projects.

Practical implications

The proposed methodology was used in a new product development project. The case study was done on one of the payment service provider companies that design, develop and deploy a digital product for marketing, installation, repair and maintenance of electronic funds transfer at point of sale devices.

Originality/value

No research has yet sought to identify the challenges of using PAR in innovation project management (IPM). Identifying the challenges associated with applying PAR in the IPM and providing an enhanced methodology to mitigate the challenges could fill a gap in IPM studies.

Details

International Journal of Managing Projects in Business, vol. 17 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 27 February 2024

Zhen Zhang and Min Min

New product development (NPD) projects are strategically important for firms’ operations but suffer from high failure rates. Leadership is a key factor for project success…

Abstract

Purpose

New product development (NPD) projects are strategically important for firms’ operations but suffer from high failure rates. Leadership is a key factor for project success. However, in contrast to positive project leadership, project managers’ knowledge hiding has received little attention. Drawing on the input-mediator-output (IMO) framework and model of work team resilience, we explored the effect of project managers’ destructive knowledge hiding (i.e. evasive hiding and playing dumb) on project team performance (i.e. efficiency and effectiveness) and the serial indirect effect through team psychological safety and transactive memory systems.

Design/methodology/approach

We conducted a time-lagged multiple-sourcing investigation of Chinese high-tech firms and tested the hypotheses using data collected from 105 NPD project teams.

Findings

Our findings demonstrated that project managers’ knowledge hiding negatively affects NPD project team performance and indirectly negatively affects transactive memory systems through team psychological safety. Moreover, project managers’ knowledge hiding exerts a negative indirect effect on team performance through team psychological safety and transactive memory systems in serial.

Originality/value

This study contributes to the literature on operations management (OM) by broadening our understanding of the connection between project managers' destructive knowledge hiding and the failure of NPD projects. In providing such insight, it also offers practical guidance for overcoming team-level obstacles arising from project managers' knowledge hiding.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

1 – 10 of 16