Search results

1 – 10 of over 146000
Open Access
Article
Publication date: 9 August 2022

Dieudonné Sawadogo, Seydou Sané and Somnoma Edouard Kaboré

The objectives of this study are twofold: first, to identify the effect of sustainability management on the success of international development projects, and second, to…

1248

Abstract

Purpose

The objectives of this study are twofold: first, to identify the effect of sustainability management on the success of international development projects, and second, to investigate the moderating role of political and social skills on this relationship.

Design/methodology/approach

This study adopted a quantitative research methodology based on questionnaire data collected from 43 international development project managers from various fields in Burkina Faso (West Africa). Descriptive statistics and exploratory and confirmatory analyses using principal component analysis were used to assess the quality of the measurement model. A multiple regression analysis based on the partial least squares approach was used to test the hypotheses.

Findings

The results show that sustainability management positively contributes to the success of international development projects. However, given the specificities of these projects and their perception of success, the project coordinator's political and social skills do not predict a greater impact of sustainability management on the success of international development projects. The study also found that project coordinators prioritize their technical skills over behavioral ones.

Originality/value

This study fills a gap in the literature, given that little is known about the moderating role of political and social skills in the effect of sustainability management on the success of specific projects such as international development projects.

Details

Journal of Business and Socio-economic Development, vol. 4 no. 2
Type: Research Article
ISSN: 2635-1374

Keywords

Article
Publication date: 6 June 2016

Peter McEvoy, Malcolm Brady and Ronaldo Munck

International development practice has had as its dominant paradigm the rational-analytic model of project planning, management and evaluation. This is reflected in the widespread…

1479

Abstract

Purpose

International development practice has had as its dominant paradigm the rational-analytic model of project planning, management and evaluation. This is reflected in the widespread adoption by donor agencies of results-based management (RBM), side by side with conventionally used tools for monitoring and evaluation (including logical framework analysis (“logframe”), logic model and results frameworks). Donor agencies rely upon such tools to generate the evidence base for measuring “success” across the spectrum of their work, even though projects differ enormously in their nature, scope and time-span. Process-led capacity development projects and input-led infrastructural or straightforward service delivery projects require very different yardsticks of performance monitoring and appraisal. Drawing on insights from the complex adaptive systems (CAS) literature, the purpose of this paper is to explore how projects focused on capacity development necessitate a more eclectic approach, including – but not restricted to – RBM methodology.

Design/methodology/approach

Using the insights of CAS theory, and with particular reference to projects which have capacity development as their prime focus, this paper explores a broadening of conventional project management practices.

Findings

The paper posits an integrative approach to managing international development projects focused on capacity development – one which would recognise the values of instrumental utility and goal-setting associated with the application of the tools of RBM, while situating that within a more open, system focused and holistic approach to projects and their outcomes, placing emphasis on context, adaptability and learning.

Research limitations/implications

The research enquiry presented is discursive rather than empirical, and builds on established theory and constructs of three distinct conceptual fields: first, the RBM approach to project and programme implementation; second, the “complexity” strand of organisational management literature; and third, the capacity development strand of international development discourse.

Originality/value

The paper intersects disciplinary boundaries between project management, organisational studies and international development theory and practice.

Article
Publication date: 26 July 2019

Christophe Midler

The last few decades have seen the rapid emergence of two transformative streams in large firms. The first is the development of project management, aimed at improving the…

1214

Abstract

Purpose

The last few decades have seen the rapid emergence of two transformative streams in large firms. The first is the development of project management, aimed at improving the performance of innovation management, while the second, the internationalization of innovation organizations and processes in response to strategies of redeployment toward emerging countries. Both streams have been closely analyzed in the fields of project management and international management, respectively. However, the links between the two have been less studied. The purpose of this paper is to consider the hypothesis that a firm’s projectification might have an important impact on its pattern of internationalization in innovation.

Design/methodology/approach

First, we present the models of internationalization of innovation processes used in the multinational corporation literature. This field essentially focuses on the components of permanent organizations: global internationalization strategy and legacy, R&D footprint, characterization of local subsidiaries and the role of central head offices. Projects figure only as a context in which those elements operate, not as a structuring variable of the global innovation process pattern. The authors challenge this view by exploring whether the specificities of the firm’s projectification pattern can influence how it builds its global innovation process. The paper is based on a longitudinal case where the authors analyze the organizational transition within the Renault group, an emblematic case of a multinational that implemented a spectacular internationalization transition in the 2000s.

Findings

Our results demonstrate project organizing’s major impact on the internationalization patterns of innovation processes within the firm. They show how the deployment of a polycentric innovation footprint has been the consequence of a specific projectification transition, giving the project and program functions the autonomy to transgress centralized product development norms to adapt their project to the local environment; use the initial breakthrough project as the foundation for a new and specific global product development network through a lineage logic; and sustain this innovation global network as a permanent process of the firm.

Research limitations/implications

The paper demonstrates the importance of the organization’s projectification characteristics as an important vector for successfully implementing the most advanced internationalization strategies (i.e. reverse innovation) and innovation processes models (i.e. integrated networks).

Practical implications

The paper characterizes project management related conditions that can govern the success of innovation strategies in high-growth emerging countries: the autonomy and empowerment of project functions; colocation and integration of teams; existence of a program function; and HR policies capable of supporting lineage management and project-to-project learning processes.

Originality/value

Bridging project management literature with multinational management literature. Demonstrate the key impact of projectification on internationalization pattern of the firm. Longitudinal analysis of a firm internationalization transition on a ten-year period.

Details

International Journal of Managing Projects in Business, vol. 12 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 27 May 2022

Yanik G. Harnois and Stéphane Gagnon

Taking a transdisciplinary viewpoint, the authors synthesize the literature on the theoretical, methodological, and epistemological issues in the study of corruption as a…

Abstract

Purpose

Taking a transdisciplinary viewpoint, the authors synthesize the literature on the theoretical, methodological, and epistemological issues in the study of corruption as a construct in project management (PM) as applied to IDPs. While the study of corruption has focused on “who and why” to help understand corruption's occurrence, there is a lack of analysis on “where and how” to ensure corruption's prevention and improve PM to better support delivery actors. The authors rely on four theoretical frameworks to help interpret evidence and formulate a coherent model for managing project socio-cultural context: organizational interests theory (OIT), principal-agent theory (PAT), culturalist theory (CT) and institutional theory (IT).

Design/methodology/approach

International development projects (IDPs) have become very complex with greater diversity of donor agencies and aid delivery actors. The relative lack of success of development aid has been linked in part to corruption at various levels. PM methods are essential to help prevent this behavior. To assess the complexity of this problem, the authors completed a grounded theory research based on thirty interviews with international development experts, balancing representation from donor and receiving countries, as well as project managers in public and private sectors. Data are analyzed using a qualitative sorting process using the software NVivo.

Findings

Results show that PM, beyond PM's practical nature and technical focus, can offer numerous opportunities to prevent corruption impact on project actors, even in a context where anti-corruption initiatives may be perceived as less effective. The authors present an original theoretical model that illustrates which actors, events and context are related and linked in the dynamic efforts to understand and combat corruption in international development endeavors. Context is linked to dynamics: foreign aid cycle, capture opportunities, context pressures, personal damages done, and control mechanisms exercised.

Originality/value

The outcomes and quality of IDPs remain highly controversial, especially with perception of corruption by various stakeholders. Some experts recognize the inefficacy of applying classical PM tools and processes. By contrasting findings to the literature, the authors conclude that an alternative approach to overcome the taboos and prejudices in studying corruption is to ask a different research question. A research agenda is proposed for solving this phenomenon. To guide PM research on development projects, focusing on the “where and how” of corruption requires addressing how actors build their knowledge management capabilities, and address the social and cultural challenges inherent to IDPs.

Details

Journal of Advances in Management Research, vol. 19 no. 5
Type: Research Article
ISSN: 0972-7981

Keywords

Article
Publication date: 6 June 2016

Mohamed Yamin and Adriel K.S. Sim

The purpose of this paper is to examine the perceptions of local project teams on critical success factors and project success in the context of international development projects

4488

Abstract

Purpose

The purpose of this paper is to examine the perceptions of local project teams on critical success factors and project success in the context of international development projects in Maldives. It identifies the critical success factors of international development projects, examines how the success of international development projects in Maldives is perceived by local project team members, and analyzes the relationship between critical success factors and project success from the project teams’ perspective.

Design/methodology/approach

A survey questionnaire was used and 41 project team members participated in the study. Correlation analysis and regression analysis were performed to understand the relationship with project success and critical success factors.

Findings

The study found out that the levels of success of projects were perceived high among the project teams. The results indicated that monitoring CSF, coordination CSF, design CSF, training CSF, and institutional environment CSF had a significant relationship with project success. However, results of the regression analysis indicated that only monitoring CSF was significant in influencing project success.

Research limitations/implications

The limited sample size and optimism bias of respondents were a constraint. Furthermore, further analysis of data may be required to advance analysis.

Originality/value

The study looks through the lens of project implementation teams in order to provide insights from their vantage point. The study provides insights based on the Maldivian context which will benefit similar island nation communities implementing similar projects.

Details

International Journal of Managing Projects in Business, vol. 9 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Abstract

Details

Expatriate Leaders of International Development Projects
Type: Book
ISBN: 978-1-83909-631-0

Article
Publication date: 16 May 2019

Ahmadullah Hilali, Chotchai Charoenngam and Ankita Barman

For construction and management, the existing codes of practice of international organizations such as US Army Corps of Engineers, the Asian Development Bank, the World Bank, the…

Abstract

Purpose

For construction and management, the existing codes of practice of international organizations such as US Army Corps of Engineers, the Asian Development Bank, the World Bank, the United Nations Office for Project Services, etc., often prove ineffective when applied in post-war countries like Afghanistan. Domestic contractors faced maximum challenges in contractual scope management, which was implemented by such organizations based on their existing codes of practice. The purpose of this paper is to understand these barriers in scope management as faced by the domestic contractors of Afghanistan.

Design/methodology/approach

The research employs a mixed methodology to cater to its objectives. Face-to-face structured interviews of 14 industry experts and extensive literature review were conducted to identify unique barriers pertaining to Afghanistan construction industry. Further, quantitative assessment of these barriers through the statistical tools of “mean score ranking,” “Kendall’s test” and “independent sample t-test” was carried out to understand the severity of the barriers.

Findings

In total, 39 unique barriers were identified under the groups of “scope formulation,” “scope completeness,” “scope pricing,” “scope implementation” and “scope change control.” The consequential impacts of these barriers and their existence at different stages of the project were illustrated. The most severe barriers were identified as the “inadequacy of site investigation reports” and the “unavailability of resources in local markets.”

Originality/value

The understanding of the challenges faced by local stakeholders, as highlighted by this study, can be utilized by these international organizations in their strategy and planning to ensure successful projects while also propagating the adoption of sustainable construction practices.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 July 2015

James Earnest

Rehabilitation and reconstruction of social and economic infrastructure in a post-conflict environment are complex, long-debated issues in development cooperation. In addition to…

Abstract

Purpose

Rehabilitation and reconstruction of social and economic infrastructure in a post-conflict environment are complex, long-debated issues in development cooperation. In addition to war creating large-scale human suffering, generating refugees, displacing populations, engendering psychological distress, obliterating infrastructure and transforming the economy, in post-conflict situations, deepening chaos and disorder can be found at the highest social, economic and political levels; serious developmental challenges remain insufficiently addressed. Repairing war-damaged infrastructure in order to reactivate the local economy is a challenge for all post-conflict countries. The paper aims to discuss these issues.

Design/methodology/approach

The study was designed to examine planning and execution of post-conflict reconstruction (PCR). The use of a mixed-method research approach combining both quantitative and qualitative data collection was used to explore planning and implementation of PCR infrastructure projects in Kosovo. The data collection in the field was undertaken for a period of eight weeks, from July to September 2008. A total of 420 respondents were involved in the study process, as follows: key informants (four), pilot test (12), semi-structured interviews (36), project manager/engineers survey (231), chief of mission/country director survey (117), and focus group (20). To meet the needs of the society and recognise the required functional components of project management, the overall contexts of managing projects in a post-conflict environment have been discussed in the study.

Findings

Planning and implementing reconstruction projects in areas affected by conflict have proven to be far more challenging than expected and responses by practitioners, aid agencies, and government regarded as inadequate. The changing political, economic, and social factors in Kosovo after the war in 1999 have had a significant influence on the limited adoption of a project management methodology in development and reconstruction projects. The findings from the exploratory study were aimed at improving understanding of the planning, pre-designing, and implementation of infrastructure projects. The findings indicated a need to promote a better understanding of how projects are undertaken at all levels of the organisation, and to describe processes, procedures, and tools used for the actual application of projects. The findings of the study identified a poor quality of planning and implementation of reconstruction projects in an environment of complexity, change, and uncertainty. The study also raised some very significant findings for a broader approach to community involvement in project identification, planning, and implementation. Infrastructure projects implemented in Kosovo were used to develop a conceptual framework for designing projects and programmes more likely to yield positive outcomes for post-conflict society.

Originality/value

The study was done by the researcher in Kosovo.

Details

International Journal of Emergency Services, vol. 4 no. 1
Type: Research Article
ISSN: 2047-0894

Keywords

Article
Publication date: 26 January 2010

Lavagnon A. Ika, Amadou Diallo and Denis Thuillier

The purpose of this paper is to analyze the empirical relationship between project management (PM) efforts (the extent to which national project coordinators (NPCs) – the project

7640

Abstract

Purpose

The purpose of this paper is to analyze the empirical relationship between project management (PM) efforts (the extent to which national project coordinators (NPCs) – the project managers in the aid industry sector – make use of available PM tools), project success, and success criteria.

Design/methodology/approach

Data were collected by way of questionnaires delivered by mail to 600 recipients in 26 different countries in Africa.

Findings

The research results suggest that project success is insensitive to the level of project planning efforts but a significant correlation does exist between the use of monitoring and evaluation tools and project “profile,” a success criterion which is an early pointer of project long‐term impact.

Research limitations/implications

This paper contributes to PM research by exploring the relationship between the use of PM tools and project success in the non‐traditional PM – although project oriented – aid industry sector. The paper highlights self‐perceptions of NPCs and should not be interpreted in other ways.

Practical implications

This paper highlights the importance of PM tools in practice. Further, it suggests that NPCs (who are in fact only involved in project execution) put a lot of effort into monitoring and evaluation. In so doing, they strive to ensure project performance and accountability throughout project lifecycle, and this contributes to project “profile.”

Originality/value

This is the first study that offers insights into the relationship between PM efforts and project success in the aid industry sector. The paper calls for further research on PM practices in the aid industry sector where projects remain important instruments for aid delivery.

Details

International Journal of Managing Projects in Business, vol. 3 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 30 July 2019

Rocío Rodríguez-Rivero, Isabel Ortiz-Marcos, Luis Ballesteros-Sánchez and María Jesús Sánchez

The purpose of this paper is to analyze the quintessential methodology of the international development (ID) projects, the logical framework approach (LFA), to find out which…

Abstract

Purpose

The purpose of this paper is to analyze the quintessential methodology of the international development (ID) projects, the logical framework approach (LFA), to find out which changes are required to increase the level of effectiveness of these projects.

Design/methodology/approach

This research presents a thorough review of literature relating to the evolution of the LFA. This theoretical analysis formed the basis for a closed-ended questionnaire on the methodology and how it could be improved, from which the responses of 56 project managers experienced in the LFA were collected. Data were statistically analyzed through correlation matrix and ANOVA analysis by SPSS software. The questionnaire included a last open-ended question where professionals suggested how they would develop the methodology, opening a new path to effectiveness through participative approaches.

Findings

The research reveals that the LFA needs to be improved, and points to the next steps in the evolution of this mature methodology. An interesting insight is that although some suggestions are broadly accepted, such as the integration of risk management, other proposals could be open to further discussion depending on the organization.

Research limitations/implications

The main weakness is related to the sample, which is reduced to 56 project managers from the same country (Spain).

Originality/value

Since interventions for development are made by practitioners, considering their suggestions to improve the LFA is a major step to enhance the management of ID projects.

Details

International Journal of Managing Projects in Business, vol. 14 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

1 – 10 of over 146000