Search results

1 – 10 of over 1000
Open Access
Book part
Publication date: 1 May 2019

Yafan Fu and Roine Leiringer

The paper aims to investigate the prevailing institutional logics that underpin the organisational behaviours of Chinese contractors and the institutional complexity they face

Abstract

Purpose

The paper aims to investigate the prevailing institutional logics that underpin the organisational behaviours of Chinese contractors and the institutional complexity they face across several strategic areas when they undertake projects abroad.

Design/Methodology/Approach

The paper draws mainly on industry literature, reports and government websites to develop a typology of two ideal types of institutional logics that prevail among Chinese international contractors. The configurations of institutional complexity in different strategic areas are analysed through pattern-matching.

Findings

Two main logics are identified, namely, construction and investment logics. These logics in turn lead to patterns of volatile complexity in the strategic areas of business, technology, human resources and marketing; patterns of aligned complexity in operational and information technology strategic areas; and patterns of segregated complexity in financial strategic area.

Research Limitations/Implications

The paper presents an ongoing doctoral research. It provides a preliminary understanding of the institutional logics affecting Chinese international contractors and sets out the first step to understand the relationship between complex institutional environments and organisational responses.

Practical Implications

Chinese international contractors commonly face resistance, and at times resentment, from the local industries in the countries they operate. The findings of this paper are a first step towards a better understanding of why this is the case and what can be done to rectify the situation and improve long and short-term project performance.

Originality/Value

This paper provides practical implications for Chinese contractors to understand their internal context of institutional complexity and provides the basis for further understanding of Chinese contractors’ strategic responses.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 7 August 2017

Per Erik Eriksson

The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.

12317

Abstract

Purpose

The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.

Design/methodology/approach

This paper is based on a literature review of organizational research and construction management literature together with a brief interview study of Swedish clients and contractors.

Findings

The theoretical and empirical findings propose that small and simple projects with low uncertainty and scarce resources may focus on exploitation to enhance short-term efficiency through traditional procurement strategies including delivery systems that separate the actors and their activities (i.e. pure design-build- or design-bid-build-contracts), fixed price payment and price focus in bid evaluation. Large complex projects with high uncertainty and customization benefit from combining exploration and exploitation to enhance sustainable performance. This requires collaborative procurement strategies including joint specification through early contractor involvement, cost reimbursement coupled with incentive-based payment, bid evaluation based on multiple criteria and collaborative tools and activities in partnering arrangements.

Research limitations/implications

This paper contributes to organizational learning literature by pinpointing the need for integrating procurement strategies that enhance combination of exploration and exploitation. The main contribution to the construction management literature involves the investigation of how procurement strategies may affect exploration and exploitation, as identified and articulated in the propositions developed in this paper.

Practical implications

From a practical perspective, the findings highlight the importance of tailoring procurement strategies to project characteristics to enhance a suitable balance between exploration and exploitation in construction projects.

Originality/value

The explicit focus on the operational project-level is uncommon but relevant in organizational learning literature.

Details

Journal of Financial Management of Property and Construction, vol. 22 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Content available
Book part
Publication date: 13 April 2021

Patricia Jean McLaughlin

Abstract

Details

Expatriate Leaders of International Development Projects
Type: Book
ISBN: 978-1-83909-631-0

Content available
Article
Publication date: 1 June 1999

82

Abstract

Details

Anti-Corrosion Methods and Materials, vol. 46 no. 3
Type: Research Article
ISSN: 0003-5599

Keywords

Open Access
Book part
Publication date: 1 May 2019

Sondre Evjen, Gustav Gunnerud, Ola Lædre, Rune Søfting and Jardar Lohne

Reports from the Norwegian police indicate that actors in the architecture, engineering and construction industry face severe competition from criminal actors. Sub-contractors

Abstract

Purpose

Reports from the Norwegian police indicate that actors in the architecture, engineering and construction industry face severe competition from criminal actors. Sub-contractors working within the law struggle to be competitive compared to dubious sub-contractors. This study aims to examine (1) what the sub-contractors’ perceptions of current contracting practices are, (2) what problems they face and (3) what countermeasures can be used to improve the situation.

Design/Methodology/Approach

The research was carried out on the basis of a qualitative approach. A literature review and a document study of reports from the sub-contractors, public agencies and other relevant organisations were conducted. In addition, in-depth interviews were conducted with the management of eight sub-contractors in the Norwegian architecture, engineering and construction industry.

Findings

There is a significant difference in the perception of the reality between contractors’ management and the blue-collar workers. Management among the contractors maintain that their control systems work; however, the result from this study shows that it is easy for the sub-contractors to take advantage of loopholes or avoid the countermeasures.

Research Limitations/Implications

This paper is limited to Norway and use only the paint industry as a case study.

Practical Implications

This study shows that sub-contractors constitute an important source of information in the effort to prevent dubious sub-contractors as they are the actors who experience the greatest pressure and competition from them. Therefore, contractors should include the sub-contractors in the process of developing measures to prevent this misconduct.

Originality/Value

A very little research has been carried out within this field of study in Norway.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 2 October 2023

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Godspower C. Amadi and Okechukwu Dominic Saviour Duru

In most developing countries, indigenous emerging construction contractors (ECCs) face severe problems of not adopting a project management framework (PMF) in their business…

Abstract

Purpose

In most developing countries, indigenous emerging construction contractors (ECCs) face severe problems of not adopting a project management framework (PMF) in their business activities. It has increased their business risk and threatened their sustainability. Studies showed that government policy support (GPS) helps mitigate business risks. Thus, there is a paucity of literature concerning GPS on emerging Nigerian construction contractors' business sustainability. Therefore, the paper aims to investigate the moderating effect of GPS on the relationship between PMF and ECCs in Nigeria.

Design/methodology/approach

SmartPLS was used to analyse the collected data from the useable 310 questionnaires retrieved from respondents in Abuja and Lagos, Nigeria. Systems Theory was used to support the developed framework.

Findings

Findings show that government policy support significantly moderates the relationships between PMF and ECCs in the Nigerian construction sector. It implies that the study's results offer more understanding regarding issues affecting construction entrepreneurs' sustainable business cycle via applying PMF to mitigate business sustainable associated risks.

Practical implications

The study will stir Nigeria's ECCs and policymakers to promote construction business sustainability for a new entrepreneur, emphasising business risk management via PMF and GPS to enhance the sustainable business cycle.

Originality/value

The research (PMF and GPS) is strategies to enhance ECCs business sustainability in the Nigerian construction sector and other developing countries with similar political and economic attributes. Besides the study guiding old and intending ECCs and policymakers in the developing countries industries, it would contribute to bridge the theoretical gap regarding PMF and ECC, especially ECCs in developing countries with similar business sustainability issues.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Content available
Article
Publication date: 12 April 2023

Arpit Singh, Vimal Kumar, Ankesh Mittal and Pratima Verma

This study aims to set out to identify and evaluate potential obstacles to successfully implementing lean construction (LC) as a result.

Abstract

Purpose

This study aims to set out to identify and evaluate potential obstacles to successfully implementing lean construction (LC) as a result.

Design/methodology/approach

Several indicators were recognized as major obstacles following an exhaustive assessment of the literature and a multicriteria decision analysis based on the analytic hierarchy process (AHP) of information obtained from a questionnaire survey that was directed to practitioners in the Indian construction industry.

Findings

The results of this AHP model suggest that “Managerial” and “Inadequate resources” categories with a priority weight of “0.361” and “0.309” have the highest levels of influence, respectively, while “Inadequate knowledge” and “just in time (JIT)” categories with a priority weight of “0.053” and “0.034” have the lowest levels of influence, respectively.

Research limitations/implications

Construction companies can use the study’s findings as a guide to determine whether they are ready to embrace LC, learn more about the components needed for implementation or investigate any challenges that may arise. These businesses can then create plans to promote the adoption and application of the lean philosophy.

Originality/value

The Indian construction industry may see great success with LC management initiatives. LC concepts have been adopted by many nations, but during the past 20 years, there has only appeared to be a limited amount of lean implementation in the Indian construction industry. It seems that several structural and cultural barriers are preventing its effective implementation. Organizations will not be able to determine what improvement efforts are required, where these efforts should be directed or which initiatives could provide the best outcomes if they are unaware of the elements that influence the effective implementation of LC.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 4 October 2022

Donatella Depperu, Ilaria Galavotti and Federico Baraldi

This study aims to examine the multidimensional nature of institutional distance as a driver of acquisition decisions in emerging markets. Then, this study aims to offer a nuanced…

1337

Abstract

Purpose

This study aims to examine the multidimensional nature of institutional distance as a driver of acquisition decisions in emerging markets. Then, this study aims to offer a nuanced perspective on the role of its various formal and informal dimensions by taking into account the potential contingency role played by a firm’s context experience.

Design/methodology/approach

Building on institutional economics and organizational institutionalism, this study explores the heterogeneity of institutional distance and its effects on the decision to enter emerging versus advanced markets through cross-border acquisitions. Thus, institutional distance is disentangled into its formal and informal dimensions, the former being captured by regulatory efficiency, country governance and financial development. Furthermore, our framework examines the moderating effect of an acquiring firm’s experience in institutionally similar environments, defined as context experience. The hypotheses are analyzed on a sample of 496 cross-border acquisitions by Italian companies in 41 countries from 2008 to 2018.

Findings

Findings indicate that at an increasing distance in terms of regulatory efficiency and financial development, acquiring firms are less likely to enter emerging markets, while informal institutional distance is positively associated with such acquisitions. Context experience mitigates the negative effect of formal distance and enhances the positive effect of informal distance.

Originality/value

This study contributes to institutional distance literature in multiple ways. First, by bridging institutional economics and organizational institutionalism and second, by examining the heterogeneity of formal and informal dimensions of distance, this study offers a finer-grained perspective on how institutional distance affects acquisition decisions. Finally, it offers a contingency perspective on the role of context experience.

Details

International Journal of Emerging Markets, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-8809

Keywords

Open Access
Article
Publication date: 18 February 2022

Kimmo Keskiniva, Arto Saari and Juha-Matti Junnonen

This study aims to provide a foundation for the development of subcontracts that suit takt production in construction.

Abstract

Purpose

This study aims to provide a foundation for the development of subcontracts that suit takt production in construction.

Design/methodology/approach

This is a non-empiric conceptual study, which integrates takt production and general construction literature into new proposals for subcontract clauses suitable for takt production in construction. This study uses literature reviews, from which proposals regarding takt production viable subcontract clauses are conducted via logical reasoning.

Findings

A total of 13 proposals for takt production applicable subcontracts are provided in this study. The proposals emphasize detailed and collaborative planning, suitable payment methods and flexibility for takt plan modification.

Originality/value

Previous takt literature has not properly addressed the development of subcontracts for takt production, despite regular attempts to use subcontracting in takt production. This study aims to aid main contractors to create fair and suitable subcontracts, so that adhering to takt schedules could be more viable in practice. This study also acts as a foundation for further empirical studies regarding the subject.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of over 1000