Search results

1 – 1 of 1
Article
Publication date: 18 March 2024

Syed Mithun Ali, Muhammad Najmul Haque, Md. Rayhan Sarker, Jayakrishna Kandasamy and Ilias Vlachos

Bangladesh's ready-made garment (RMG) industry plays a vital role in the economic growth of this country. As the global trend in the fashion market has introduced a high-mix…

Abstract

Purpose

Bangladesh's ready-made garment (RMG) industry plays a vital role in the economic growth of this country. As the global trend in the fashion market has introduced a high-mix, low-volume ordering style, manufacturers are facing an increased number of changeovers in their production systems. However, most of the Bangladeshi RMG manufacturers are not yet ready to respond to such small orders and to improve the flexibility of their production systems. Consequently, the industry is falling behind in global market competition. Thus, this study aims to advance the current performance of RMG manufacturing operations to respond to the fast-fashion industry's challenges effectively using quick changeover.

Design/methodology/approach

In this study, a Single-Minute Exchange of Dies (SMED) is applied to attain quick changeover following the best practices of lean manufacturing.

Findings

This study examined the performance of the SMED technique to reduce changeover time in two case organisations. The changeover time was reduced by 70.76% from 434.56 min to 127.08 min and 42.12% from 2,664 min to 1,542 min for the case organisations, respectively. The results of this study show that companies require improved changeover times to address the demand for high-mix, low-volume orders.

Originality/value

This study will certainly guide practitioners of the RMG industry to adopt SMED to reduce changeover time to meet small batch production.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Access

Year

Last 3 months (1)

Content type

1 – 1 of 1