Search results

1 – 10 of over 2000
Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects…

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 April 2024

Jochen Fähndrich and Burkhard Pedell

This study aims to analyse the influence of digitalisation on the management control function of small and medium-sized enterprises (SMEs). In particular, it aims to illuminate…

Abstract

Purpose

This study aims to analyse the influence of digitalisation on the management control function of small and medium-sized enterprises (SMEs). In particular, it aims to illuminate how digitalisation influences management control elements, organisation and roles/competencies and to identify obstacles to digitalisation of management control in SMEs and measures taken to overcome them.

Design/methodology/approach

The study is based on guideline-supported expert interviews conducted with 14 financial managers from SMEs in Germany, Austria and Switzerland.

Findings

This study reveals the influence of digitalisation on management control elements, organisation, and roles/competencies. The automation and standardisation of management control processes result in new elements for management control, such as strategic support for management. In addition, the increased availability and transparency of data enable the use of instruments within a company that allow for quick analyses of the company's development. Digitalisation leads to the integration of management control into the corporate network and, thus, a change in the organisation of management control. It also triggers the expansion of management control competencies, especially IT competencies. A shortage of internal digitalisation resources, unclear corporate roadmaps, and a lack of managerial experience loom as central challenges for digitalising the management control function. Measures derived from the interviews can help SMEs overcome the obstacles to the digitalisation of management control.

Originality/value

This research is the first interview-based study of the impact of digitalisation on management control in SMEs, potential obstacles to that digitalisation, and measures to overcome those obstacles. Thus, it contributes to the emerging debate on factors that may explain why SMEs lag in terms of the digitalisation of their internal processes.

Details

Qualitative Research in Accounting & Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1176-6093

Keywords

Open Access
Article
Publication date: 22 March 2024

Geming Zhang, Lin Yang and Wenxiang Jiang

The purpose of this study is to introduce the top-level design ideas and the overall architecture of earthquake early-warning system for high speed railways in China, which is…

Abstract

Purpose

The purpose of this study is to introduce the top-level design ideas and the overall architecture of earthquake early-warning system for high speed railways in China, which is based on P-wave earthquake early-warning and multiple ways of rapid treatment.

Design/methodology/approach

The paper describes the key technologies that are involved in the development of the system, such as P-wave identification and earthquake early-warning, multi-source seismic information fusion and earthquake emergency treatment technologies. The paper also presents the test results of the system, which show that it has complete functions and its major performance indicators meet the design requirements.

Findings

The study demonstrates that the high speed railways earthquake early-warning system serves as an important technical tool for high speed railways to cope with the threat of earthquake to the operation safety. The key technical indicators of the system have excellent performance: The first report time of the P-wave is less than three seconds. From the first arrival of P-wave to the beginning of train braking, the total delay of onboard emergency treatment is 3.63 seconds under 95% probability. The average total delay for power failures triggered by substations is 3.3 seconds.

Originality/value

The paper provides a valuable reference for the research and development of earthquake early-warning system for high speed railways in other countries and regions. It also contributes to the earthquake prevention and disaster reduction efforts.

Article
Publication date: 29 December 2023

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation…

Abstract

Purpose

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation Laboratory (DEMATEL). The study provides qualitative and quantitative analysis of project complexities factors and their relationships. The results of the study facilitate effective project planning, proactive risk management and informed decision-making by stakeholders.

Design/methodology/approach

This study employs a case-based method for identifying PCFs and a DEMATEL method for analyzing the interdependence of complexity factors in metro rail projects. Initially, PCFs were identified through an extensive literature review. To validate and refine these factors, semi-structured interviews were conducted with thirty experienced professionals, each having 5–20 years of experience in roles such as project management, engineering, and planning. Further, elevated and underground metro rail projects were purposefully selected as cases, for identifying the similarities and differences in PCFs. A questionnaire survey was conducted with various technical experts in metro rail projects. These experts rated the impact of PCFs on a five-point Likert scale, for the evaluation of the interdependence of PCFs. The DEMATEL technique was used to analyze the interdependencies of the PCFs.

Findings

Metro rail projects are influenced by project complexity, which significantly impacts their performance. The analysis reveals that “design problems with existing structures,” “change in design or construction” and “land acquisition” are the key factors contributing to project complexity.

Originality/value

The study of project complexity in metro rail projects is limited because most of the studies have studies on examining complexity in mega projects. The existing literature lacks adequate attention in identifying project complexity and its effects on metro rail project performance. This research aims to bridge this gap by examining project complexity and interdependencies in metro rail projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 28 April 2023

Antti Ylä-Kujala, Kati Kouhia-Kuusisto, Tuuli Ikäheimonen, Teemu Laine and Timo Kärri

While companies worldwide are largely comprised of small and medium-sized enterprises (SMEs), a significant amount of management accounting (MA) research focuses on larger…

4174

Abstract

Purpose

While companies worldwide are largely comprised of small and medium-sized enterprises (SMEs), a significant amount of management accounting (MA) research focuses on larger organisations, thus leaving MA practice in SMEs relatively under-researched. This paper aims to examine MA adoption (MAA) and its interfaces with MA challenges and business performance from a small business perspective.

Design/methodology/approach

A sample of 502 small businesses is investigated with an embedded mixed methods research design comprised of qualitative content analysis, factor analysis and analysis of variance.

Findings

Up to 78% of small businesses are facing MA challenges that stem from organisation, systems, personnel and/or resources. Based on the present findings, MA challenges do motivate small businesses to at least consider investing in MAA as small businesses facing challenges are more likely to acquire systems and services than those reporting no issues at all. Hence, small business managers seem to not only recognise where their challenges lie, but also seek ways to improve the situation through MAA. The analysis also reveals that companies with the highest MA know-how have the best average solvency, suggesting that small businesses indeed benefit from MAA. Interestingly, the performance at medium levels of know-how declines while investments increase, revealing a “decreasing solvency phenomenon”. Potential explanations are, e.g. the MA not fitting the company’s exact needs, or information usability and use being limited by poor MA understanding.

Originality/value

The originality of the research lies in exploring the interfaces between MA challenges, MAA and small business performance using distinctive embedded mixed methods research design.

Details

Journal of Accounting & Organizational Change, vol. 19 no. 6
Type: Research Article
ISSN: 1832-5912

Keywords

Article
Publication date: 5 February 2024

Mounika Mude and J. Reeves Wesley

Research on work–family interface (WFI) is almost two decades old. It is widely believed that the archetype of work and family after COVID has changed. Post-COVID emphases and…

Abstract

Purpose

Research on work–family interface (WFI) is almost two decades old. It is widely believed that the archetype of work and family after COVID has changed. Post-COVID emphases and outcomes would be different. Accordingly, a bibliometric analysis of the research would help to understand the state of the research and positive WFI patterns that guide further investigations. The present study used measures such as journals, citations, etc. to determine the bibliometric patterns from 2003 to August 2023 using VOSviewer software.

Design/methodology/approach

Data were obtained from Scopus. 1,601 works were found in the first search. This figure was narrowed down to 525 based on a few conditions. The most commonly referenced journals, sources, authors, etc. were used for the analysis.

Findings

Research on positive WFI has increased in recent years. The total number of articles in positive WFI was 525 between 2003 and August 2023. Greenhaus, Powell and Carlson were the most cited authors in this field. Carlson had produced the highest number of documents in WFI. Most WFI authors focused on antecedents, treating positive WFI as the outcome variable.

Research limitations/implications

This is the first bibliometric analysis conducted on a positive WFI, although there have been a few on work–family conflict. However, other sources such as the Australian Business Deans Council (ABDC) and Web of Science may throw different results on journals, citations, etc. Hence, future researchers might emphasize if the same results originate from data in other databases. Other analytical tools may be used in the place of VOSviewer.

Originality/value

This is the first article on bibliometric analysis of positive WFI. This paper’s primary objective is to understand the patterns of literature available on positive WFI and its significance comprehensively.

Details

International Journal of Sociology and Social Policy, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-333X

Keywords

Article
Publication date: 19 January 2024

Premaratne Samaranayake, Michael W. McLean and Samanthi Kumari Weerabahu

The application of lean and quality improvement methods is very common in process improvement projects at organisational levels. The purpose of this research is to assess the…

Abstract

Purpose

The application of lean and quality improvement methods is very common in process improvement projects at organisational levels. The purpose of this research is to assess the adoption of Lean Six Sigma™ approaches for addressing a complex process-related issue in the coal industry.

Design/methodology/approach

The sticky coal problem was investigated from the perspective of process-related issues. Issues were addressed using a blended Lean value stream of supply chain interfaces and waste minimisation through the Six Sigma™ DMAIC problem-solving approach, taking into consideration cross-organisational processes.

Findings

It was found that the tendency to “solve the problem” at the receiving location without communication to the upstream was, and is still, a common practice that led to the main problem of downstream issues. The application of DMAIC Six Sigma™ helped to address the broader problem. The overall operations were improved significantly, showing the reduction of sticky coal/wagon hang-up in the downstream coal handling terminal.

Research limitations/implications

The Lean Six Sigma approaches were adopted using DMAIC across cross-organisational supply chain processes. However, blending Lean and Six Sigma methods needs to be empirically tested across other sectors.

Practical implications

The proposed methodology, using a framework of Lean Six Sigma approaches, could be used to guide practitioners in addressing similar complex and recurring issues in the manufacturing sector.

Originality/value

This research introduces a novel approach to process analysis, selection and contextualised improvement using a combination of Lean Six Sigma™ tools, techniques and methodologies sustained within a supply chain with certified ISO 9001 quality management systems.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 4 April 2024

Richard Kadan, Temitope Seun Omotayo, Prince Boateng, Gabriel Nani and Mark Wilson

This study aimed to address a gap in subcontractor management by focusing on previously unexplored complexities surrounding subcontractor management in developing countries. While…

Abstract

Purpose

This study aimed to address a gap in subcontractor management by focusing on previously unexplored complexities surrounding subcontractor management in developing countries. While past studies concentrated on selection and relationships, this study delved into how effective subcontractor management impacts project success.

Design/methodology/approach

This study used the Bayesian Network analysis approach, through a meticulously developed questionnaire survey refined through a piloting stage involving experienced industry professionals. The survey was ultimately distributed among participants based in Accra, Ghana, resulting in a response rate of approximately 63%.

Findings

The research identified diverse components contributing to subcontractor disruptions, highlighted the necessity of a clear regulatory framework, emphasized the impact of financial and leadership assessments on performance, and underscored the crucial role of main contractors in Integrated Project and Labour Cost Management with Subcontractor Oversight and Coordination.

Originality/value

Previous studies have not considered the challenges subcontractors face in projects. This investigation bridges this gap from multiple perspectives, using Bayesian network analysis to enhance subcontractor management, thereby contributing to the successful completion of construction projects.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 18 July 2023

Anna Dubois, Klas Hedvall and Viktoria Sundquist

The purpose of this paper is to inquire into how conceptualising is done in the industrial network approach (INA).

Abstract

Purpose

The purpose of this paper is to inquire into how conceptualising is done in the industrial network approach (INA).

Design/methodology/approach

The description and analysis of conceptualising is based on key INA references and an example illustrating the characteristics of conceptualising in individual studies.

Findings

The paper concludes that there is an open and interactive way of conceptualising in the INA. The empirical and theoretical grounding achieved through combining concepts in individual empirical studies interplays with conceptual development in the research community over time.

Research limitations/implications

Three paradoxes are suggested for further discussion of conceptualising as a key element in theorising in the INA community.

Originality/value

By explicating how INA researchers engage in conceptualising both in individual empirical studies and as a community, the authors identify characteristics similar to the empirical phenomena in focus of the research: interaction, combining and heterogeneity of concepts.

Details

Journal of Business & Industrial Marketing, vol. 38 no. 13
Type: Research Article
ISSN: 0885-8624

Keywords

Article
Publication date: 11 October 2021

Sharareh Kermanshachi, Thahomina Jahan Nipa and Bac Dao

The purpose of this study is to ascertain and list the most effective management strategies in efficiently handling the project complexities to enhance the performance of the…

Abstract

Purpose

The purpose of this study is to ascertain and list the most effective management strategies in efficiently handling the project complexities to enhance the performance of the project.

Design/methodology/approach

To fulfill the aim of this study, a comprehensive literature review was conducted, and the qualitative Delphi technique in two rounds was applied. Participants of the Delphi technique consisted of 12 subject matter experts (SMEs) with cumulative experience of 250 years in working in construction projects. In the first round of the Delphi technique, SMEs were asked to provide complexity management strategies to address the complexities due to 37 complexity indicators (CIs) under 11 complexity categories. In the second round of the Delphi technique, SMEs identified the top three management strategies for each of the 37 CIs.

Findings

This study collected the outcome of the two-round Delphi technique and based on the output developed the list of strategies to manage complexities related to each indicator. For example, establishing a well-informed governance team, assigning a Project Manager (PM) when the number of projects is more than one in an organization, and assigning a PM efficient enough to communicate with higher authority effectively will help in managing complexity that arises due to faulty assessment of the influence of a project on the organization’s overall success.

Originality/value

This study will help practitioners in effectively managing the project complexities, and thus will reduce the monetary loss associated with project complexities.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of over 2000