Search results
1 – 10 of over 25000Pravin P Tambe and Makarand S Kulkarni
The traditional practice for maintenance, quality control and production scheduling is to plan independently irrespective of an interrelationship exist between them. The purpose…
Abstract
Purpose
The traditional practice for maintenance, quality control and production scheduling is to plan independently irrespective of an interrelationship exist between them. The purpose of this paper is to develop an approach for integrating maintenance, quality control and production scheduling. The objective is to investigate the benefits of the integrated effect in terms of the expected total cost of system operation of the three functions.
Design/methodology/approach
The proposed approach is based on the conditional reliability of the components. Cost model for integrating selective maintenance, quality control using sampling-based procedure and production scheduling is developed using the conditional reliability. An integrated approach is such that, first an optimal schedule for the batches to be processed is obtained independently while the maintenance and quality control decisions are optimized considering the optimal schedule on the machine. The expected total cost of conventional approach, i.e. “No integration” is calculated to compare the effectiveness of integrated approach.
Findings
The integrated approach have shown a higher cost saving as compared to the independent planning approach. The approach is practical to implement as the results are obtained in a reasonable computational time.
Practical implications
The approach presented in this paper is generic and can be applied at planned as well as unplanned opportunities. The proposed integrated approach is dynamic in nature, as during maintenance opportunities, it is possible to optimize the decision on maintenance, quality control and production scheduling considering the current age of components and production requirement.
Originality/value
The originality of the paper is in the approach for integration of the three elements of shop floor operations that are usually treated separately and rarely touched upon by researchers in the literature.
Details
Keywords
Irina Farquhar and Alan Sorkin
This study proposes targeted modernization of the Department of Defense (DoD's) Joint Forces Ammunition Logistics information system by implementing the optimized innovative…
Abstract
This study proposes targeted modernization of the Department of Defense (DoD's) Joint Forces Ammunition Logistics information system by implementing the optimized innovative information technology open architecture design and integrating Radio Frequency Identification Device data technologies and real-time optimization and control mechanisms as the critical technology components of the solution. The innovative information technology, which pursues the focused logistics, will be deployed in 36 months at the estimated cost of $568 million in constant dollars. We estimate that the Systems, Applications, Products (SAP)-based enterprise integration solution that the Army currently pursues will cost another $1.5 billion through the year 2014; however, it is unlikely to deliver the intended technical capabilities.
Tarek Salama, Ahmad Salah and Osama Moselhi
The purpose of this paper is to present a new method for project tracking and control of integrated offsite and onsite activities in modular construction considering practical…
Abstract
Purpose
The purpose of this paper is to present a new method for project tracking and control of integrated offsite and onsite activities in modular construction considering practical characteristics associated with this type of construction.
Design/methodology/approach
The design embraces building information modelling and integrates last planner system (LPS), linear scheduling method (LSM) and critical chain project management (CCPM) to develop tracking and control procedures for modular construction projects. The developed method accounts for constraints of resources continuity and uncertainties associated with activity duration. Features of proposed method are illustrated in a case example for tracking and control of modular projects.
Findings
Comparison between developed schedule and Monte Carlo simulation showed that baseline duration generated from simulation exceeds that produced by developed method by 12% and 10% for schedules with 50% and 90% confidence level, respectively. These percentages decrease based on interventions of members of project team in the LPS sessions. The case example results indicate that project is delayed 5% and experienced cost overrun of 2.5%.
Originality/value
Developed method integrated LPS, LSM and CCPM while using metrics for reliability assessment of linear schedules, namely, critical percent plan complete (PPCcr) and buffer index (BI). PPCcr and BI measure percentage of plan completion for critical activities and buffer consumption, respectively. The developed method provides a systematic procedure for forecasting look-ahead schedules using forecasting correction factor Δt and a newly developed tracking and control procedure that uses PPCcr and BI. Quantitative cost analysis is also provided to forecast and monitor project costs to prove the robustness of proposed framework.
Details
Keywords
Tahereh Khesal, Abbas Saghaei, Mohammad Khalilzadeh, Masoud Rahiminezhad Galankashi and Roya Soltani
The purpose of this paper is to propose an integrated earned value management (EVM) approach to control quality, cost, schedule and risk of projects.
Abstract
Purpose
The purpose of this paper is to propose an integrated earned value management (EVM) approach to control quality, cost, schedule and risk of projects.
Design/methodology/approach
This study represents a new EVM framework by considering a quality control index. Particularly, some control indices and cumulative buffers are defined by two proposed, methods, namely the linear- and Taguchi-based methods. These methods are implemented in three different projects in different industries.
Findings
According to the results, integration of the quality index creates a better control situation by providing more accurate information. Hence, project managers could comprehensively monitor the status of important factors to make more precise decisions while maintaining the simplicity of their analysis.
Originality/value
From the methodological and theoretical features, this paper offers new visions because, to the best of authors’ knowledge, no comparable study has been conducted before.
Details
Keywords
Yiran Dan and Guiwen Liu
Production and transportation of precast components, as two continuous service stages of a precast plant, play an important role in meeting customer needs and controlling costs…
Abstract
Purpose
Production and transportation of precast components, as two continuous service stages of a precast plant, play an important role in meeting customer needs and controlling costs. However, there is still a lack of production and transportation scheduling methods that comprehensively consider delivery timeliness and transportation economy. This article aims to study the integrated scheduling optimization problem of in-plant flowshop production and off-plant transportation under the consideration of practical constraints of customer order delivery time window, and seek an optimal scheduling method that balances delivery timeliness and transportation economy.
Design/methodology/approach
In this study, an integrated scheduling optimization model of flowshop production and transportation for precast components with delivery time windows is established, which describes the relationship between production and transportation and handles transportation constraints under the premise of balancing delivery timeliness and transportation economy. Then a genetic algorithm is designed to solve this model. It realizes the integrated scheduling of production and transportation through double-layer chromosome coding. A program is designed to realize the solution process. Finally, the validity of the model is proved by the calculation of actual enterprise data.
Findings
The optimized scheduling scheme can not only meet the on-time delivery, but also improve the truck loading rate and reduce the total cost, composed of early cost in plant, delivery penalty cost and transportation cost. In the model validation, the optimal scheduling scheme uses one less truck than the traditional EDD scheme (saving 20% of the transportation cost), and the total cost can be saved by 17.22%.
Originality/value
This study clarifies the relationship between the production and transportation of precast components and establishes the integrated scheduling optimization model and its solution algorithm. Different from previous studies, the proposed optimization model can balance the timeliness and economy of production and transportation for precast components.
Details
Keywords
Regenerative braking is an efficient energy saving technology in urban rail system, in which the recovery energy from braking trains is collected by some equipments and released…
Abstract
Purpose
Regenerative braking is an efficient energy saving technology in urban rail system, in which the recovery energy from braking trains is collected by some equipments and released to accelerating trains when needed. However, the high cost and low lifetime of storage devices prevent the widespread use of this technology. The purpose of this paper is to conduct thorough cost-benefit analysis to facilitate China’s urban rail companies to make decisions on the use of such technology.
Design/methodology/approach
To evaluate the benefit from regenerative energy storage, the authors formulate an improved integrated scheduling and speed control model to calculate the net energy consumption associated with different energy recovery rates and then define the benefit as the amount of energy saving arising from the usage of storage equipments. With the frequent charge/discharge operations on storage equipments, the energy recovery rate generally decreases which lowers the benefit, but the maintenance cost increases. By trading-off benefit and cost, the authors derive the optimal scrapping time, the maximum profit and the profitability condition for storage devices.
Findings
Simulation studies based on the Beijing Metro Yizhuang Line of China are given. The results show that compared with the current timetable and speed profile, the integrated scheduling and speed control approach with energy recovery rate of 0.5 can reduce the net energy consumption by 12.69 per cent; the net energy consumption can be well approximated as a linear function of energy recovery rate; and the maximum profit and the optimal scrapping time on regenerative energy storage devices are both positively related to the electricity price. The allowance proportion and the number of service trains such that busy lines with higher electricity price or allowance proportion have advantages to use the regenerative energy storage devices.
Research limitations/implications
In this work, a linear energy recovery rate and a linear maintenance cost are used in the cost-benefit analysis process. In future research, the more accurate expressions on energy recovery rate and maintenance cost should be considered if more data on recovery rate and maintenance cost can be gathered.
Originality/value
The main values of this paper are to develop the integrated optimization approaches for train scheduling and speed control and, on this basis, make thorough cost-benefit analysis for regenerative energy storage to improve the operations management of urban rail transit.
Details
Keywords
Involvement in the effective design and use of computer‐basedinformation systems is essential for the manager of the 1990s. To bemost effective, systems must be designed for the…
Abstract
Involvement in the effective design and use of computer‐based information systems is essential for the manager of the 1990s. To be most effective, systems must be designed for the requirements of the manager‐user. Too often there is a communication gap between managers who are too busy, uninterested or unwilling to become directly involved, on the one hand, and on the other, the consultant who is more usually engrossed in the special nature of the system. The author aims to provide an up‐to‐date and integrated treatment of organisation and management, as well as to emphasise the utilisation of management information systems to improve the art of managing.
Details
Keywords
The ideas expressed in this work are based on those put intopractice at the Okuma Corporation of Japan, one of the world′s leadingmachine tool manufacturers. In common with many…
Abstract
The ideas expressed in this work are based on those put into practice at the Okuma Corporation of Japan, one of the world′s leading machine tool manufacturers. In common with many other large organizations, Okuma Corporation has to meet the new challenges posed by globalization, keener domestic and international competition, shorter business cycles and an increasingly volatile environment. Intelligent corporate strategy (ICS), as practised at Okuma, is a unified theory of strategic corporate management based on five levels of win‐win relationships for profit/market share, namely: ,1. Loyalty from customers (value for money) – right focus., 2. Commitment from workers (meeting hierarchy of needs) – right attitude., 3. Co‐operation from suppliers (expanding and reliable business) – right connections., 4. Co‐operation from distributors (expanding and reliable business) – right channels., 5. Respect from competitors (setting standards for business excellence) – right strategies. The aim is to create values for all stakeholders. This holistic people‐oriented approach recognizes that, although the world is increasingly driven by high technology, it continues to be influenced and managed by people (customers, workers, suppliers, distributors, competitors). The philosophical core of ICS is action learning and teamwork based on principle‐centred relationships of sincerity, trust and integrity. In the real world, these are the roots of success in relationships and in the bottom‐line results of business. ICS is, in essence, relationship management for synergy. It is based on the premiss that domestic and international commerce is a positive sum game: in the long run everyone wins. Finally, ICS is a paradigm for manufacturing companies coping with change and uncertainty in their search for profit/market share. Time‐honoured values give definition to corporate character; circumstances change, values remain. Poor business operations generally result from human frailty. ICS is predicated on the belief that the quality of human relationships determines the bottom‐line results. ICS attempts to make manifest and explicit the intangible psychological factors for value‐added partnerships. ICS is a dynamic, living, and heuristic‐learning model. There is intelligence in the corporate strategy because it applies commonsense, wisdom, creative systems thinking and synergy to ensure longevity in its corporate life for sustainable competitive advantage.
Details
Keywords
Editorial This special issue of Industrial Management & Data Systems is a huge departure from our usual journal/ monograph style. This is an additional issue to the year's volume…
Abstract
Editorial This special issue of Industrial Management & Data Systems is a huge departure from our usual journal/ monograph style. This is an additional issue to the year's volume — a bonus in fact.
Sandeep Kumar and J.J. Thakkar
Schedule and cost overrun analysis for a typical research & development (R&D) project is necessary to identify and mitigate the non-feasible alternatives at the design stage…
Abstract
Purpose
Schedule and cost overrun analysis for a typical research & development (R&D) project is necessary to identify and mitigate the non-feasible alternatives at the design stage. Typically, this should include an analysis of technological and economic factors of R&D project. This paper aims to discuss these issues.
Design/methodology/approach
This research proposes an integrated analytic network process (ANP) and reusable system dynamics (SD) model for a quick and strategically consistent decision making. The technological and economic factors of R&D project were first identified and compiled through a systematic literature review. An ANP model was first developed for calculating Risk Priority Index (RPI) for set of technological and economic factors. The computed RPI are considered as an input to SD models. Two SD models (technological and economic) are developed to undertake a detailed investigation on effect of individual factor on schedule and cost overrun. The approach is exemplified for a case of government R&D project in India.
Findings
ANP identifies “Testing & qualification facility” and “Raw material availability” as the highest RPI factors. A detailed sensitivity analysis of SD models suggests that technological factors such as “Design Changes,” “Hidden Activities,” and “Lack of Expertise” and economic factors such as “Project delays,” “Unexpected incidents” and “Conflicts” have the highest influence on schedule and cost overrun.
Practical implications
The outcomes of this research can help managers to estimate the severity of various technological and economic factors on cost and schedule overrun and develop an adequate risk mitigation contingency plan.
Originality/value
In case of R&D projects where systems are being developed for the first time, changes are inevitable, and hence schedule and cost management plays a very important role in its success. This paper proposes an integrated reusable approach of ANP and SD for analyzing the influence of technological and economic factors on schedule and cost overrun of R&D project.
Details