Article
Publication date: 26 January 2024

Mohsen Rajabzadeh, Seyed Meysam Mousavi and Farzad Azimi

This paper investigates a problem in a reverse logistics (RLs) network to decide whether to dispose of unsold goods in primary stores or re-commercialize them in outlet centers…

Abstract

Purpose

This paper investigates a problem in a reverse logistics (RLs) network to decide whether to dispose of unsold goods in primary stores or re-commercialize them in outlet centers. By deducting the costs associated with each policy from its revenue, this study aims to maximize the profit from managing unsold goods.

Design/methodology/approach

A new mixed-integer linear programming model has been developed to address the problem, which considers the selling prices of products in primary and secondary stores and the costs of transportation, cross-docking and returning unwanted items. As a result of uncertain nature of the cost and time parameters, gray numbers are used to deal with it. In addition, an innovative uncertain solution approach for gray programming problems is presented that considers objective function satisfaction level as an indicator of optimism.

Findings

According to the results, higher costs, including transportation, cross-docking and return costs, make sending goods to outlet centers unprofitable and more goods are disposed of in primary stores. Prices in primary and secondary stores heavily influence the number of discarded goods. Higher prices in primary stores result in more disposed of goods, while higher prices in secondary stores result in fewer. As a result of the proposed method, the objective function satisfaction level can be viewed as a measure of optimism.

Originality/value

An integral contribution of this study is developing a new mixed-integer linear programming model for selecting the appropriate goods for re-commercialization and choosing the best outlet center based on the products' price and total profit. Another novelty of the proposed model is considering the matching percentage of boxes with secondary stores’ desired product lists and the probability of returning goods due to non-compliance with delivery dates. Moreover, a new uncertain solution approach is developed to solve mathematical programming problems with gray parameters.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 7 June 2023

Debadyuti Das and Aditya Singh

The present work seeks to determine the optimal delivery schedule of equipment at a project site in the backdrop of limited storage space, at a minimum cost, and without…

Abstract

Purpose

The present work seeks to determine the optimal delivery schedule of equipment at a project site in the backdrop of limited storage space, at a minimum cost, and without disturbing the overall project schedule. In addition, the optimized delivery schedule helps in minimizing the fluctuating requirements of space at the project site across the entire project lifespan.

Design/methodology/approach

The study is carried out at a Steel plant operating in a constrained space but undergoing a production capacity expansion. The problem motivated us to explore the possibility of postponing the delivery dates of certain equipment closer to the erection dates without compromising on the project schedule. Given the versatility of linear programming models in dealing with such schedule optimization problems, the authors formulated the above problem as a Zero-One Integer Linear Programming problem.

Findings

The model is implemented for all the new equipment arriving for two major units – the Hot Strip Mill (HSM) and the Blast Furnace (BF). It generates an optimized delivery schedule by delaying the delivery of some equipment by a certain number of periods, without compromising the overall project schedule and at a minimum storage cost. The average space utilization increases by 25.85 and 14.79% in HSM and BF units respectively. The fluctuations in space requirements are reduced substantially in both units.

Originality/value

The study shows a timeline in the form of a Gantt chart for the delivery of equipment, storage of equipment across different periods, and the number of periods for which the delivery of certain equipment needs to be postponed. The study uses linearly increasing storage costs with the increase in the number of periods for storage of the equipment in the temporary shed.

Highlights

  1. Determined the optimal delivery schedule of the equipment in a project environment in the backdrop of limited storage space in the project site.

  2. Formulated the above problem as a Zero-One Integer Linear Programming (ILP) problem.

  3. The average space utilization has increased by 25.85 and 14.79% in HSM and BF units respectively.

  4. The optimized delivery schedule helps in reducing the fluctuations in space requirements substantially across the entire lifespan of the project.

  5. The timeline of delivery of equipment, storage of equipment across different periods and periods of postponement of the equipment are shown in the form of a Gantt Chart.

Determined the optimal delivery schedule of the equipment in a project environment in the backdrop of limited storage space in the project site.

Formulated the above problem as a Zero-One Integer Linear Programming (ILP) problem.

The average space utilization has increased by 25.85 and 14.79% in HSM and BF units respectively.

The optimized delivery schedule helps in reducing the fluctuations in space requirements substantially across the entire lifespan of the project.

The timeline of delivery of equipment, storage of equipment across different periods and periods of postponement of the equipment are shown in the form of a Gantt Chart.

Details

Journal of Advances in Management Research, vol. 20 no. 5
Type: Research Article
ISSN: 0972-7981

Keywords

Article
Publication date: 12 October 2023

Zhuyue Li and Chunxiao Zhang

Supply chain risk management can effectively reduce the loss of retailers. In this regard, retailers need to consider the competition risks of competitors in addition to the…

Abstract

Purpose

Supply chain risk management can effectively reduce the loss of retailers. In this regard, retailers need to consider the competition risks of competitors in addition to the disruption risks. This paper designs a resilient retail supply chain network for perishable foods under the dynamic competition to maximize retailer's profits.

Design/methodology/approach

A two-stage mixed-integer non-linear model is presented for designing the supply chain network. In the first stage, an equilibrium model that considers the characteristics of perishable foods is developed. In the second stage, a mixed integer non-linear programming model is presented to deal with the strategic decisions. Finally, an efficient memetic algorithm is designed to deal with large-scale problems.

Findings

The optimal the selection of suppliers, distribution centers and the order allocation are found among the supply chain entities. Considering the perishability of agri-food products, the equilibrium retail price and selling quantity are determined. Through a numerical example, the optimal inventory period under different maximum shelf life and the impact of three resilient strategies on retailer's profit, selling price and selling quantity are analyzed.

Research limitations/implications

As for future research, the research can be extended in a number of directions. First, this paper studies the retail supply chain network design problem under competition among retailers. It can be an interesting direction to consider retailers competing with suppliers. Second, the authors can try to linearize the non-linear model and solve the large-scale integer programming problem by exact algorithm. Finally, the freshness of perishable foods gradually declines linearly to zero as the maximum shelf life approaches, and it would be a meaningful attempt to consider the freshness of perishable foods declines exponentially.

Originality/value

This paper innovatively designs the resilient supply chain network for perishable foods under dynamic competition. The retailer's dynamic competition and resilient strategies are considered simultaneously when designing supply chain network for perishable foods. In addition, this paper gives insights into how to obtain the optimal inventory period and compare the retailer's resilient strategies.

Article
Publication date: 10 February 2023

Rokhsaneh Yousef Zehi and Noor Saifurina Nana Khurizan

Uncertainty in data, whether in real-valued or integer-valued data, may result in infeasible optimal solutions or unreliable efficiency scores and ranking of decision-making…

Abstract

Purpose

Uncertainty in data, whether in real-valued or integer-valued data, may result in infeasible optimal solutions or unreliable efficiency scores and ranking of decision-making units. To handle the uncertainty in integer-valued factors in data envelopment analysis (DEA) models, this study aims to propose a robust DEA model which is applicable in the presence of such factors.

Design/methodology/approach

This research focuses on the application of fuzzy interpretation of efficiency to a mixed-integer DEA (MIDEA) model. The robust optimization approach is used to address the uncertain integer-valued parameters in the proposed MIDEA model.

Findings

In this study, the authors proposed an MIDEA model without any equality constraint to avoid the arise problem by such constraints in the construction of the robust counterpart of the conventional MIDEA models. We have studied the characteristics and conditions for constructing the uncertainty set with uncertain integer-valued parameters and a robust MIDEA model is proposed under a combined box-polyhedral uncertainty set. The applicability of the developed models is shown in a case study of Malaysian public universities.

Originality/value

This study develops an MIDEA model equivalent to the conventional MIDEA model excluding any equality constraint which is crucial in robust approach to avoid restricted feasible region or infeasible solutions. This study proposes a robust DEA approach which is applicable in cases with uncertain integer-valued parameters, unlike previous studies in robust DEA field where uncertain parameters are generally assumed to be only real-valued.

Details

Journal of Modelling in Management, vol. 19 no. 1
Type: Research Article
ISSN: 1746-5664

Keywords

Book part
Publication date: 18 January 2024

Robert T. F. Ah King and Samiah Mohangee

To operate with high efficiency and minimise the risks of power failures, power systems require careful monitoring. The availability of real-time data is crucial for assessing the…

Abstract

To operate with high efficiency and minimise the risks of power failures, power systems require careful monitoring. The availability of real-time data is crucial for assessing the performance of the grid and assisting operators in gauging the present security of the grid. Traditional supervisory control and data acquisition (SCADA)-based systems actually employed provides steady-state measurement values which are the calculation premise of State Estimation. More often, however, the power grid operates under dynamic state and SCADA measurements can lead to erroneous and inaccurate calculation results. The introduction of the phasor measurement unit (PMU) which provides real-time synchronised voltage and current phasors with very high accuracy is universally recognised as an important aspect of delivering a secure and sustainable power system. PMUs are a relatively new technology and because of their high procurement and installation costs, it is imperative to develop appropriate methodologies to determine the minimum number of PMUs as well as their strategic placements to guarantee full observability of a power system. Thus, the problem of the optimal PMU placement (OPP) is formulated as an optimisation problem subject to various constraints to minimise the number of PMUs while ensuring complete observability of the grid. In this chapter, integer linear programming (ILP), genetic algorithm (GA) and non-linear programming (NLP) constrained models of the OPP problem are presented. A new methodology is proposed to incorporate several constraints using the NLP. The optimisation methods have been written in Matlab software and verified on the standard Institute of Electrical and Electronics Engineers (IEEE) 14-bus test system to authenticate their effectiveness. This chapter targets United Nations Sustainable Development Goal 7.

Details

Artificial Intelligence, Engineering Systems and Sustainable Development
Type: Book
ISBN: 978-1-83753-540-8

Keywords

Article
Publication date: 8 March 2022

Roya Amiri, Javad Majrouhi Sardroud and Vahid Momenaei Kermani

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary…

Abstract

Purpose

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary facilities such as tower cranes and areas on the jobsite for materials storage. This study proposes an approach to optimizing the type and location of the tower crane and material supply point on construction sites.

Design/methodology/approach

The problem is formulated into an integer linear programming (ILP) model considering the total cost of material transportation as the objective function and site conditions as constraints. The efficacy of the approach is demonstrated by finding the optimum site layout for a numerical example. The proposed model is validated and verified using two methods.

Findings

Results indicate that the proposed model successfully identifies the type and location of the tower crane and the location of material supply point, leading to approximately 20% cost reduction compared with when such features of a site layout are decided solely based on experience and educated guesses of the construction manager.

Originality/value

The primary contribution of this study is to present a modified linear mathematical model for site layout optimization that exhibits improved performance compared with previous models. The type and location of the tower crane and the material supply point as decision variables are extracted directly from solving the proposed model. The proposed model will help enhance time and cost efficiency on construction sites.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 July 2023

S.M. Taghavi, V. Ghezavati, H. Mohammadi Bidhandi and S.M.J. Mirzapour Al-e-Hashem

This paper proposes a two-level supply chain including suppliers and manufacturers. The purpose of this paper is to design a resilient fuzzy risk-averse supply portfolio selection…

Abstract

Purpose

This paper proposes a two-level supply chain including suppliers and manufacturers. The purpose of this paper is to design a resilient fuzzy risk-averse supply portfolio selection approach with lead-time sensitive manufacturers under partial and complete supply facility disruption in addition to the operational risk of imprecise demand to minimize the mean-risk costs. This problem is analyzed for a risk-averse decision maker, and the authors use the conditional value-at-risk (CVaR) as a risk measure, which has particular applications in financial engineering.

Design/methodology/approach

The methodology of the current research includes two phases of conceptual model and mathematical model. In the conceptual model phase, a new supply portfolio selection problem is presented under disruption and operational risks for lead-time sensitive manufacturers and considers resilience strategies for risk-averse decision makers. In the mathematical model phase, the stages of risk-averse two-stage fuzzy-stochastic programming model are formulated according to the above conceptual model, which minimizes the mean-CVaR costs.

Findings

In this paper, several computational experiments were conducted with sensitivity analysis by GAMS (General algebraic modeling system) software to determine the efficiency and significance of the developed model. Results show that the sensitivity of manufacturers to the lead time as well as the occurrence of disruption and operational risks, significantly affect the structure of the supply portfolio selection; hence, manufacturers should be taken into account in the design of this problem.

Originality/value

The study proposes a new two-stage fuzzy-stochastic scenario-based mathematical programming model for the resilient supply portfolio selection for risk-averse decision-makers under disruption and operational risks. This model assumes that the manufacturers are sensitive to lead time, so the demand of manufacturers depends on the suppliers who provide them with services. To manage risks, this model also considers proactive (supplier fortification, pre-positioned emergency inventory) and reactive (revision of allocation decisions) resilience strategies.

Article
Publication date: 12 September 2023

Kemal Subulan and Adil Baykasoğlu

The purpose of this study is to develop a holistic optimization model for an integrated sustainable fleet planning and closed-loop supply chain (CLSC) network design problem under…

Abstract

Purpose

The purpose of this study is to develop a holistic optimization model for an integrated sustainable fleet planning and closed-loop supply chain (CLSC) network design problem under uncertainty.

Design/methodology/approach

A novel mixed-integer programming model that is able to consider interactions between vehicle fleet planning and CLSC network design problems is first developed. Uncertainties of the product demand and return fractions of the end-of-life products are handled by a chance-constrained stochastic program. Several Pareto optimal solutions are generated for the conflicting sustainability objectives via compromise and fuzzy goal programming (FGP) approaches.

Findings

The proposed model is tested on a real-life lead/acid battery recovery system. By using the proposed model, sustainable fleet plans that provide a smaller fleet size, fewer empty vehicle repositions, minimal CO2 emissions, maximal vehicle safety ratings and minimal injury/illness incidence rate of transport accidents are generated. Furthermore, an environmentally and socially conscious CLSC network with maximal job creation in the less developed regions, minimal lost days resulting from the work's damages during manufacturing/recycling operations and maximal collection/recovery of end-of-life products is also designed.

Originality/value

Unlike the classical network design models, vehicle fleet planning decisions such as fleet sizing/composition, fleet assignment, vehicle inventory control, empty repositioning, etc. are also considered while designing a sustainable CLSC network. In addition to sustainability indicators in the network design, sustainability factors in fleet management are also handled. To the best of the authors' knowledge, there is no similar paper in the literature that proposes such a holistic optimization model for integrated sustainable fleet planning and CLSC network design.

Article
Publication date: 9 September 2022

Akhilesh Kumar, Gaurav Kumar, Tanaya Vijay Ramane and Gurjot Singh

This study proposes strategies for vaccine center allocation for coronavirus disease (COVID) vaccine by determining the number of vaccination stations required for the vaccination…

Abstract

Purpose

This study proposes strategies for vaccine center allocation for coronavirus disease (COVID) vaccine by determining the number of vaccination stations required for the vaccination drive, location of vaccination station, assignment of demand group to vaccination station, allocation of the scarce medical professional teams to station and number of optimal days a vaccination station to be functional in a week.

Design/methodology/approach

The authors propose a mixed-integer nonlinear programming model. However, to handle nonlinearity, the authors devise a heuristic and then propose a two-stage mixed-integer linear programming (MILP) formulation to optimize the allocation of vaccination centers or stations to demand groups in the first stage and the allocation of vaccination centers to cold storage links in the second stage. The first stage optimizes the cost and average distance traveled by people to reach the vaccination center, whereas the second stage optimizes the vaccine’s holding and storage and transportation cost by efficiently allocating cold storage links to the centers.

Findings

The model is studied for the real-world case of Chandigarh, India. The results obtained validate that the proposed approach can immensely help government agencies and policymaking body for a successful vaccination drive. The model tries to find a tradeoff between loss due to underutilized medical teams and the distance traveled by a demand group to get the vaccination.

Originality/value

To the best of our knowledge, there are hardly any studies on a vaccination program at such a scale due to sudden outbreaks such as Covid-19.

Details

Benchmarking: An International Journal, vol. 30 no. 9
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 26 September 2023

Seyed Mojtaba Taghavi, Vahidreza Ghezavati, Hadi Mohammadi Bidhandi and Seyed Mohammad Javad Mirzapour Al-e-Hashem

This paper aims to minimize the mean-risk cost of sustainable and resilient supplier selection, order allocation and production scheduling (SS,OA&PS) problem under uncertainty of…

Abstract

Purpose

This paper aims to minimize the mean-risk cost of sustainable and resilient supplier selection, order allocation and production scheduling (SS,OA&PS) problem under uncertainty of disruptions. The authors use conditional value at risk (CVaR) as a risk measure in optimizing the combined objective function of the total expected value and CVaR cost. A sustainable supply chain can create significant competitive advantages for companies through social justice, human rights and environmental progress. To control disruptions, the authors applied (proactive and reactive) resilient strategies. In this study, the authors combine resilience and social responsibility issues that lead to synergy in supply chain activities.

Design/methodology/approach

The present paper proposes a risk-averse two-stage mixed-integer stochastic programming model for sustainable and resilient SS,OA&PS problem under supply disruptions. In this decision-making process, determining the primary supplier portfolio according to the minimum sustainable-resilient score establishes the first-stage decisions. The recourse or second-stage decisions are: determining the amount of order allocation and scheduling of parts by each supplier, determining the reactive risk management strategies, determining the amount of order allocation and scheduling by each of reaction strategies and determining the number of products and scheduling of products on the planning time horizon. Uncertain parameters of this study are the start time of disruption, remaining capacity rate of suppliers and lead times associated with each reactive strategy.

Findings

In this paper, several numerical examples along with different sensitivity analyses (on risk parameters, minimum sustainable-resilience score of suppliers and shortage costs) were presented to evaluate the applicability of the proposed model. The results showed that the two-stage risk-averse stochastic mixed-integer programming model for designing the SS,OA&PS problem by considering economic and social aspects and resilience strategies is an effective and flexible tool and leads to optimal decisions with the least cost. In addition, the managerial insights obtained from this study are extracted and stated in Section 4.6.

Originality/value

This work proposes a risk-averse stochastic programming approach for a new multi-product sustainable and resilient SS,OA&PS problem. The planning horizon includes three periods before the disruption, during the disruption period and the recovery period. Other contributions of this work are: selecting the main supply portfolio based on the minimum score of sustainable-resilient criteria of suppliers, allocating and scheduling suppliers orders before and after disruptions, considering the balance constraint in receiving parts and using proactive and reactive risk management strategies simultaneously. Also, the scheduling of reactive strategies in different investment modes is applied to this problem.