1 – 10 of over 5000Elnaz Safapour, Sharareh Kermanshachi and Behzad Rouhanizadeh
In the aftermath of hurricanes, the damage levied on transportation infrastructures increases the timeliness of emergency responses and recovery procedures, making it essential…
Abstract
Purpose
In the aftermath of hurricanes, the damage levied on transportation infrastructures increases the timeliness of emergency responses and recovery procedures, making it essential that they are reconstructed as quickly as possible – on time and within budget. The aim of this study was to determine significant performance indicators (PIs) that considerably affect cost and schedule performance as well as reworks in post–hurricane reconstruction of transportation infrastructure including highways, bridges, roadways, etc. Additionally, the determined PIs were clustered to investigate key components.
Design/methodology/approach
The root causes of reconstruction projects' poor performance were identified through the existing literature, and 30 transportation infrastructure case studies were analyzed to determine the significant PIs that corresponded to cost, schedule performance and reworks. The factor analysis method was used to cluster the significant PIs and determine the key components affecting them.
Findings
Eight key components were found for cost, eight for schedule performance and six for reworks. The key components of cost performance are shortage of resources, information management, coordination, safety, location, quality of materials, quality of resources and project complexity. The key components of reconstruction schedule performance are human resources, risk management, work suspension, material resources, productivity, on-site inspections, geometrical characteristics and level of reconstruction complexity. The six key components of reconstruction reworks are logistic management, pace of decision-making, accommodation for staff, environmental issues, available temporary paths and volume of debris.
Originality/value
The outcomes of this research will assist authorities and decision makers in identifying and evaluating the critical root causes of poor cost performance, poor schedule performance and reworks and will enable them to facilitate the timely and effective allocation of resources.
Details
Keywords
Roshani Palliyaguru, Dilanthi Amaratunga and Richard Haigh
The literature emphasises that integration of disaster risk reduction (DRR) into planning processes is a key to reduce natural disaster losses, boost socio‐economic development…
Abstract
Purpose
The literature emphasises that integration of disaster risk reduction (DRR) into planning processes is a key to reduce natural disaster losses, boost socio‐economic development needs and ensure sustainability in development gains. But linking DRR to the infrastructure reconstruction sector has become a challenge in developing country settings. Therefore, the purpose of the main research, of which this paper is based on, is to explore how integration of DRR into infrastructure reconstruction should be done in such a way to contribute to socio‐economic development process. As a part of this main aim, this paper focuses on exploring the existing gap in the concept of DRR at the policy‐making level and the infrastructure reconstruction project level. Thus, the paper seeks to review the current policies on post‐disaster reconstruction and DRR at the national and intermediate‐organisational level in Sri Lanka and integration of DRR concept within these policies. Not limiting to the policies, DRR processes were assessed on their success through the level of implementation of DRR strategies at the post‐disaster infrastructure reconstruction projects.
Design/methodology/approach
The paper is based on the data collated from a case study conducted in a water supply and sanitation reconstruction project in Sri Lanka supported by expert interviews among national and intermediate‐organisational level policy makers those who are involved in the development of policies related to disaster management and construction activities.
Findings
The results highlight the lack of individual policies on reconstruction and DRR of reconstruction at the national and intermediate‐organisational level except certain sections within certain policies. It was found that integration of DRR within these policies is lower than the level of importance of such integration. Further, the level of implementation of these policies in practise is average as it is averted by required speed and quality of reconstruction, availability of finances for reconstruction, the scale of reconstruction projects, reliability and practicability of policies, legitimacy of policies and adequacy of authority delegated to the relevant bodies, the consistency of various policies, detail explanations on relationships with other policies, the level of awareness about policies by the relevant bodies, attitude of construction professionals and experience of reconstruction bodies in the field of disaster reconstruction.
Research limitations/implications
The findings of this paper is not limited to one specific policy related to disaster management or construction in Sri Lanka. It represents an overall view of most of the existing policies in the field. Furthermore, the data collection was limited to the Sri Lanka context.
Practical implications
The findings of this paper will be useful to relevant policy makers to understand the areas needed further attention within the policies in terms of integration of DRR concept within them.
Originality/value
The paper is unique in its findings as it discovers overall gaps in the concept of DRR within the policies and actual infrastructure reconstruction project practises.
Details
Keywords
Roshani Palliyaguru, Dilanthi Amaratunga and Richard Haigh
Disasters provide physical, social, economic, political and environmental development windows of opportunity particularly through housing and infrastructure reconstruction. The…
Abstract
Purpose
Disasters provide physical, social, economic, political and environmental development windows of opportunity particularly through housing and infrastructure reconstruction. The reconstruction process should not be neglected due to the opportunistic nature of facilitating innovation in development. In this respect, post‐disaster “infrastructure” reconstruction plays a critical role in development discourse and is often essential to sustain recovery after major disasters. However, reconstruction following a natural disaster is a complicated problem involving social, economic, cultural, environmental, psychological, and technological aspects. There are significant development benefits of well‐developed “Disaster Risk Reduction (DRR) Strategies” and, for many reasons, the concept of DRR can be more easily promoted following a disaster. In this respect, a research study was conducted to investigate the effects of integrating DRR strategies into infrastructure reconstruction on enhancing the socio‐economic development process from a qualitative stance. The purpose of this paper is to document part of this research study; it proposes an approach that can be used to assess the influence of the application of the DRR concept into infrastructure reconstruction on socio‐economic development.
Design/methodology/approach
The research methodology included a critical literature review.
Findings
This paper suggests that the best way to assess the influence of integrating DRR strategies practices into infrastructure reconstruction on socio‐economic development is to assess the level of impact that DRR strategies has on overcoming various factors that form vulnerabilities. Having assessed this, the next step is to assess the influence of overcoming the factors that form vulnerabilities on achieving performance targets of socio‐economic development.
Originality/value
This paper primarily presents a framework for the concept of socio‐economic development and a modelled classification of DRR practices.
Details
Keywords
Ezri Hayat, Richard Haigh and Dilanthi Amaratunga
This paper aims to identify the main aspects requiring immediate attention in the post-disaster reconstruction of road infrastructure, thereby providing a major synthesis, which…
Abstract
Purpose
This paper aims to identify the main aspects requiring immediate attention in the post-disaster reconstruction of road infrastructure, thereby providing a major synthesis, which advances the understanding in this important area.
Design/methodology/approach
Literature and empirical evidence obtained from documents and semi-structured interviews with 28 respondents of three case study districts in Aceh, Indonesia was analysed using NVivo 10. The findings were validated through triangulation with the literature and consultation with the experts in the field of disaster management and road infrastructure.
Findings
The authors propose a framework for the reconstruction of road infrastructure, which respond to the peculiarities of road projects in a post-disaster setting. The framework comprises various components requiring detailed attention in the reconstruction process and describes their position in the road project and disaster management cycle.
Originality/value
The framework fills the gap in the body of knowledge with regard to road infrastructure reconstruction in a post-disaster context. For the first time, this paper recognises the importance of local government capacity in the Aceh Province with regard to the sustainability of the post-disaster reconstruction assets.
Details
Keywords
Rehabilitation and reconstruction of social and economic infrastructure in a post-conflict environment are complex, long-debated issues in development cooperation. In addition to…
Abstract
Purpose
Rehabilitation and reconstruction of social and economic infrastructure in a post-conflict environment are complex, long-debated issues in development cooperation. In addition to war creating large-scale human suffering, generating refugees, displacing populations, engendering psychological distress, obliterating infrastructure and transforming the economy, in post-conflict situations, deepening chaos and disorder can be found at the highest social, economic and political levels; serious developmental challenges remain insufficiently addressed. Repairing war-damaged infrastructure in order to reactivate the local economy is a challenge for all post-conflict countries. The paper aims to discuss these issues.
Design/methodology/approach
The study was designed to examine planning and execution of post-conflict reconstruction (PCR). The use of a mixed-method research approach combining both quantitative and qualitative data collection was used to explore planning and implementation of PCR infrastructure projects in Kosovo. The data collection in the field was undertaken for a period of eight weeks, from July to September 2008. A total of 420 respondents were involved in the study process, as follows: key informants (four), pilot test (12), semi-structured interviews (36), project manager/engineers survey (231), chief of mission/country director survey (117), and focus group (20). To meet the needs of the society and recognise the required functional components of project management, the overall contexts of managing projects in a post-conflict environment have been discussed in the study.
Findings
Planning and implementing reconstruction projects in areas affected by conflict have proven to be far more challenging than expected and responses by practitioners, aid agencies, and government regarded as inadequate. The changing political, economic, and social factors in Kosovo after the war in 1999 have had a significant influence on the limited adoption of a project management methodology in development and reconstruction projects. The findings from the exploratory study were aimed at improving understanding of the planning, pre-designing, and implementation of infrastructure projects. The findings indicated a need to promote a better understanding of how projects are undertaken at all levels of the organisation, and to describe processes, procedures, and tools used for the actual application of projects. The findings of the study identified a poor quality of planning and implementation of reconstruction projects in an environment of complexity, change, and uncertainty. The study also raised some very significant findings for a broader approach to community involvement in project identification, planning, and implementation. Infrastructure projects implemented in Kosovo were used to develop a conceptual framework for designing projects and programmes more likely to yield positive outcomes for post-conflict society.
Originality/value
The study was done by the researcher in Kosovo.
Details
Keywords
Richard Haigh, Siri Hettige, Maheshika Sakalasuriya, G. Vickneswaran and Lasantha Namal Weerasena
The purpose of this paper is to critically analyse the role of housing reconstruction projects in post conflict and post tsunami Sri Lanka, and to discuss their implications on…
Abstract
Purpose
The purpose of this paper is to critically analyse the role of housing reconstruction projects in post conflict and post tsunami Sri Lanka, and to discuss their implications on conflict prevention.
Design/methodology/approach
Using four housing reconstruction projects in Batticaloa, Kilinochchi and Jaffna Districts, Sri Lanka, as case studies, and a novel methodological framework, the study explores the causal relations among the independent variables associated with housing reconstruction and dependent variables related to conflict prevention. The data, gathered from interviews and project reports, were analysed using propositions from a literature review, adopting a thematic analytical approach.
Findings
This study finds that reconstruction has created new forms of conflicts and tensions for the people who came to live in the newly constructed houses. The hostile relations that existed among different ethnic groups during the conflict were continued, and to some extent, exacerbated by the reconstruction undertaken after the war.
Practical implications
The study identifies causal relations among the independent variables associated with housing reconstruction and dependent variables related to conflict prevention, which can be used to inform physical reconstruction programmes after conflict.
Originality/value
The research presents a novel methodological framework. The results reveal concerns in housing and infrastructure development that have implications for future research and practice in post conflict environments.
Details
Keywords
Krisanthi Seneviratne, Dilanthi Amaratunga and Richard Haigh
Despite the role of post conflict housing reconstruction in establishing the development of peace in conflict affected countries, there are many issues which hinder its success…
Abstract
Purpose
Despite the role of post conflict housing reconstruction in establishing the development of peace in conflict affected countries, there are many issues which hinder its success. While the inconsideration of housing needs in post conflict housing reconstruction has directly or indirectly given rise for most of the issues, the countries emerging from conflicts face many challenges in addressing such housing needs. Therefore, the purpose of this paper is to explore the management of housing needs in post conflict housing reconstruction. This paper aims to focus on identifying the challenges in addressing housing needs within the context of post conflict housing reconstruction in Sri Lanka.
Design/methodology/approach
The study used the grounded theory approach to collect and analyse the data collected through 37 in-depth interviews, conducted with policy makers, practitioners, academics and housing beneficiaries in Sri Lanka. Primary data were verified through a documents review.
Findings
The paper reveals that addressing housing needs in post conflict housing reconstruction in Sri Lanka is challenging, due to several factors. These include the socio economic profile of conflict affected people, conflict sensitive issues, donor requirements, limited availability of finance, weakened government administration, extent of housing and infrastructure damage, attitudes of affected people, land-related issues and shortage of labour and material.
Originality/value
A number of studies have identified the challenges of post conflict reconstruction. This study particularly identifies the challenges of addressing housing needs in post conflict housing reconstruction. These findings are useful for policy makers to develop strategies in addressing housing needs in post conflict housing reconstruction.
Details
Keywords
Junqi Zhang, Weiwu Zou and Mohan Kumaraswamy
The paper aims to integrate relevant “people” into public-private partnerships (PPP) to establish a public–private–people partnership (4P) approach that targets more sustainable…
Abstract
Purpose
The paper aims to integrate relevant “people” into public-private partnerships (PPP) to establish a public–private–people partnership (4P) approach that targets more sustainable and better value for money post-disaster infrastructure projects. This recognises “people” as major stakeholders apart from the public and private sectors. This paper also draws on a parallel study of relationship management (RM) to counteract problems arising from multiple participants and to synergise the public, private and “people” groupings.
Design/methodology/approach
Semi-structured interviews, questionnaire surveys, a case study and a validation exercise through a focus group meeting were adopted to obtain empirical data and develop the 4P framework. Triangulation research strategy combining literature review, interviews and questionnaire survey were adopted in the parallel study of RM.
Findings
It is concluded that 4P has great potential to achieve the targets of enhanced sustainability and value of money in post-disaster scenarios. In addition, “people” can provide the “missing link” in traditional PPP to further cement the partnership and achieve effective and integrated partnership between multiple participants.
Originality/value
This paper adds a new dimension to PPP in proposing the integration of “people” into PPP to address prevalent gaps in identifying overall sustainable value. It also develops a practical 4P framework to guide practitioners who may wish to test it, to whatever extent possible. In parallel, it provides a methodological and theoretical foundation for such public, private and people partnerships in post-disaster infrastructure development.
Details
Keywords
Krisanthi Seneviratne, Dilanthi Amaratunga and Richard Haigh
Post conflict housing reconstruction is crucial to development and peacekeeping. However, the success of it, is hindered by a number of problems related to a lack of addressing…
Abstract
Purpose
Post conflict housing reconstruction is crucial to development and peacekeeping. However, the success of it, is hindered by a number of problems related to a lack of addressing housing needs. The purpose of this paper is to explore how such housing needs can be effectively managed in post conflict housing reconstruction in Sri Lanka.
Design/methodology/approach
Using the grounded theory method as the research strategy, unstructured interviews were conducted with policy makers, practitioners, beneficiaries and academics in Sri Lanka. Data were analysed using open, axial and selective coding to develop the theoretical framework.
Findings
The study reveals the challenges, contributing factors and strategies in addressing housing needs of accessibility, habitability, affordability, location, facilities, cultural considerations and security of land tenure. It also identifies the gaps and recommendations. The paper establishes the links between these and presents a theoretical framework for managing housing needs effectively in post conflict housing reconstruction in Sri Lanka.
Practical implications
This research enhances the success of post conflict housing reconstruction through addressing housing needs effectively, which contributes to sustainable housing development after conflicts.
Originality/value
The study combines the literature from five main areas: conflicts, post conflict, post conflict reconstruction, post conflict housing reconstruction and housing needs and provides a better understanding on how the housing needs can be managed during post conflict housing reconstruction in developing countries based on empirical evidence.
Details
Keywords
Mark Bassett, Suzanne Wilkinson and Sandeeka Mannakkara
The purpose of this paper is to determine how post-disaster legislation can be used to support building back better (BBB) in the horizontal infrastructure sector (roading, water…
Abstract
Purpose
The purpose of this paper is to determine how post-disaster legislation can be used to support building back better (BBB) in the horizontal infrastructure sector (roading, water, wastewater and stormwater networks).
Design/methodology/approach
A case study approach was taken looking at the rebuild following the Canterbury earthquakes in New Zealand. Data were collected through document analysis and semi-structured open-ended interviews with members of the organization responsible for implementing the horizontal infrastructure rebuild.
Findings
The results showed that the post-disaster legislative actions taken in Christchurch were comparable to existing findings on post-disaster legislative best practices in developed countries. This study confirmed that post-disaster legislation is an effective mechanism to support BBB through enforcing BBB concepts such as risk reduction and better implementation, and facilitating the recovery process to improve efficiency.
Research limitations/implications
It is recommended that this study is extended to conduct similar case studies in other countries to further explore legislative implications in different sectors as well as different legislative environments.
Originality/value
This paper makes a valuable contribution to existing research on how post-disaster legislation can be used to support BBB in the horizontal infrastructure sector. The findings also add to wider knowledge on the Canterbury earthquakes recovery process.