Search results

1 – 10 of 151
Open Access
Article
Publication date: 25 April 2024

Johanna Maria Liljeroos-Cork and Kaisu Laitinen

Infrastructure forms a basis for the operations and sustainability of the modern society. This paper aims to recognize value creation from the infrastructure procurement ecosystem…

Abstract

Purpose

Infrastructure forms a basis for the operations and sustainability of the modern society. This paper aims to recognize value creation from the infrastructure procurement ecosystem perspective to achieve those goals. The pursuit of enhancing value creation involves an examination of infrastructure procurement challenges, boundaries as well as boundary spanners that facilitate effective knowledge transfer and interaction.

Design/methodology/approach

The qualitative study is based on content analysis of 25 thematic interviews. Data was transcribed and coded via Atlas.ti software.

Findings

Infrastructure procurement value creation challenges appear complex and related to boundaries that hamper collaboration, coordination and knowledge sharing. Our results show that these boundaries locate within and between different levels of procurement ecosystem. Therefore, value creation in infrastructure procurement requires boundary spanners for leveraging knowledge sharing and interaction. Artifacts, discussion, processes and brokers as identified boundary spanners are strongly nested and interrelated in the industry. Special attention should be given to supporting individuals to act as brokers, since they play the key roles in trust building, culture steering and usage of other boundary spanners.

Social implications

Promoting value creation in infrastructure procurement helps to achieve socio-economic development goals.

Originality/value

This study offers a unique perspective on value creation in the context of infrastructure by adopting an ecosystem lens and examining boundary crossing mechanisms. The results support future development of collaboration and knowledge sharing practices fostering procurement productivity.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 7 December 2022

Ahmed Mohammed, Tarek Zayed, Fuzhan Nasiri and Ashutosh Bagchi

This paper extends the authors’ previous research work investigating resilience for municipal infrastructure from an asset management perspective. Therefore, this paper aims to…

Abstract

Purpose

This paper extends the authors’ previous research work investigating resilience for municipal infrastructure from an asset management perspective. Therefore, this paper aims to formulate a pavement resilience index while incorporating asset management and the associated resilience indicators from the authors’ previous research work.

Design/methodology/approach

This paper introduces a set of holistic-based key indicators that reflect municipal infrastructure resiliency. Thenceforth, the indicators were integrated using the weighted sum mean method to form the proposed resilience index. Resilience indicators weights were determined using principal components analysis (PCA) via IBM SPSS®. The developed framework for the PCA was built based on an optimization model output to generate the required weights for the desired resilience index. The output optimization data were adjusted using the standardization method before performing PCA.

Findings

This paper offers a mathematical approach to generating a resilience index for municipal infrastructure. The statistical tests conducted throughout the study showed a high significance level. Therefore, using PCA was proper for the resilience indicators data. The proposed framework is beneficial for asset management experts, where introducing the proposed index will provide ease of use to decision-makers regarding pavement network maintenance planning.

Research limitations/implications

The resilience indicators used need to be updated beyond what is mentioned in this paper to include asset redundancy and structural asset capacity. Using clustering as a validation tool is an excellent opportunity for other researchers to examine the resilience index for each pavement corridor individually pertaining to the resulting clusters.

Originality/value

This paper provides a unique example of integrating resilience and asset management concepts and serves as a vital step toward a comprehensive integration approach between the two concepts. The used PCA framework offers dynamic resilience indicators weights and, therefore, a dynamic resilience index. Resiliency is a dynamic feature for infrastructure systems. It differs during their life cycle with the change in maintenance and rehabilitation plans, systems retrofit and the occurring disruptive events throughout their life cycle. Therefore, the PCA technique was the preferred method used where it is data-based oriented and eliminates the subjectivity while driving indicators weights.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 January 2023

Afiqah R. Radzi, Nur Farhana Azmi, Syahrul Nizam Kamaruzzaman, Rahimi A. Rahman and Eleni Papadonikolaki

Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result…

Abstract

Purpose

Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result, industry professionals reject DT even in BIM-based construction projects due to reluctance to innovate. Furthermore, researchers have repeatedly developed tools and techniques with the same goals using DT and BIM to assist practitioners in construction projects. Therefore, this study aims to assist industry professionals and researchers in understanding the relationship between DT and BIM and synthesize existing works on DT and BIM.

Design/methodology/approach

A systematic review was conducted on published articles related to DT and BIM. A total record of 54 journal articles were identified and analyzed.

Findings

The analysis of the selected journal articles revealed four types of relationships between DT and BIM: BIM is a subset of DT, DT is a subset of BIM, BIM is DT, and no relationship between BIM and DT. The existing research on DT and BIM in construction projects targets improvements in five areas: planning, design, construction, operations and maintenance, and decommissioning. In addition, several areas have emerged, such as developing geo-referencing approaches for infrastructure projects, applying the proposed methodology to other construction geometries and creating 3D visualization using color schemes.

Originality/value

This study contributed to the existing body of knowledge by overviewing existing research related to DT and BIM in construction projects. Also, it reveals research gaps in the body of knowledge to point out directions for future research.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 19 February 2024

Anita Ollár

There is a renowned interest in adaptability as an important principle for achieving circularity in the built environment. Circular building adaptability (CBA) could enable…

Abstract

Purpose

There is a renowned interest in adaptability as an important principle for achieving circularity in the built environment. Circular building adaptability (CBA) could enable long-term building utilisation and flexible use of space with limited material flows. This paper identifies and analyses design strategies facilitating CBA to propose a framework for enhancing the implementation of the concept.

Design/methodology/approach

Interviews were conducted with professionals experienced in circular building design to explore the questions “How do currently applied design strategies enable CBA?” and “How can CBA be implemented through a conceptual design framework?”. The interviews encircled multi-residential building examples to identify currently applied circular design strategies. The interviews were analysed through qualitative content analysis using CBA determinants as a coding framework.

Findings

The results show that all ten CBA determinants are supported by design strategies applied in current circular building design. However, some determinants are more supported than others, and design strategies are often employed without explicitly considering adaptability. The design strategies that enable adaptability offer long-term solutions requiring large-scale modifications rather than facilitating low-impact adaptation by dwelling occupants. The proposed conceptual design framework could aid architects in resolving these issues and implementing CBA in their circular building design.

Originality/value

This paper’s contribution to CBA is threefold. It demonstrates design strategies facilitating CBA, proposes a conceptual design framework to apply the concept and identifies the need for a more comprehensive application of available adaptability strategies.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 7
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 16 March 2023

Imoh Antai and Roland Hellberg

The total defence (TD) concept constitutes a joint endeavour between the military forces and civil defence structures within a TD state. Logistics is essential for such joint…

Abstract

Purpose

The total defence (TD) concept constitutes a joint endeavour between the military forces and civil defence structures within a TD state. Logistics is essential for such joint collaboration to work; however, the mismatch between military and civil defence logistics structures poses challenges for such joint collaboration. The purpose of this paper is to identify logistics concept areas within the TD framework that allow for military and civil defence collaborations from a logistics operations perspective.

Design/methodology/approach

Pattern-matching analysis is used to compare patterns found in the investigated case with those prescribed from the literature and predicted to occur. The study seeks to identify logistics concepts within TD from the literature and from the events describing the Swedish response to the Covid-19 pandemic. Pattern matching thus allows for the reconciliation of logistics concepts from the literature to descriptions of how the response was handled, albeit under a TD framework.

Findings

Findings show quite distinct foci between the theoretical and observational realms in terms of logistics applications. While the theoretical realm identifies four main logistics concepts, the observational realm identifies five logistics conceptual themes. This goes on to show an incongruence between the military and civil parts of the TD.

Research limitations/implications

This study provides basis for further research into the applications and management of logistics activity within TD and emergency response.

Originality/value

Logistics applications within TD have not, until now, received much attention in the literature. Given this knowledge gap, this study is of original value.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 14 no. 2
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 24 April 2024

Mahmoud Mawed

Amidst the complicated nature of the UAE’s facilities management (FM) industry, the need to recalibrate the existing performance measurement (PM) system measures and criteria has…

Abstract

Purpose

Amidst the complicated nature of the UAE’s facilities management (FM) industry, the need to recalibrate the existing performance measurement (PM) system measures and criteria has been resonating to ensure their ability to capture the FM industry trends and dynamics, thus enhancing organizational excellence. Therefore, this research aimed to propose a specific PM tool to the country’s FM industry to accurately assess performance and establish strategic enhancements.

Design/methodology/approach

The study reviewed literature on the available PM systems to gather the available measures, which were presented to a focus group of seven participants, who were purposively selected based on their expertise in FM and PM implementation in the UAE to adjust them and add ones relevant to the UAE’s FM industry.

Findings

The focus group conducted various changes, from retaining certain measures and criteria, renaming them to simplify or make them more representative of the industry, ranking them based on their importance to limit their numbers, to finally categorizing them as enablers or results. Consequently, the final proposed tool was composed of nine dimensions with 51 measures as performance enablers and three dimensions with 11 measures as performance results. Seven measures were added by the experts, who highlighted their increasing popularity in the UAE’s FM industry.

Originality/value

Through addressing the critical void in literature, this paper develops a specific PM tool aligning with the intricacy of the UAE’s FM industry, thus providing proactive contribution to the industry’s effective and sustainable growth.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 13 December 2022

Chandrasekaran Nagarajan, Indira A. and Ramasubramaniam M.

This study aims to analyse the structure of the Indian vaccine supply chain (SC) during the Covid-19 crisis and explore the underlying challenges at each stage in the network. It…

Abstract

Purpose

This study aims to analyse the structure of the Indian vaccine supply chain (SC) during the Covid-19 crisis and explore the underlying challenges at each stage in the network. It also brings out the difference in performance of various constituent states.

Design/methodology/approach

This study relied on both primary and secondary data for the analyses. For the primary data, the study gathered experts’ opinions to validate the authors’ inferences. For the secondary data, it relies on government data provided in websites.

Findings

Based on the quartile analysis and cluster analysis of the secondary data, the authors find that the constituent states responded differently during the first and second waves. This was due to the differences in SC characteristics attributed to varied demographics and administrative efficiency.

Research limitations/implications

This paper’s analyses is primarily limited to secondary information and inferences are based on them. The study has important implications for implementing the large-scale vaccination drives by government and constituent states for better coordination and last-mile delivery.

Originality/value

The contribution is unique in studying the performance of constituent states using statistical techniques, with secondary data from authentic sources. It is also unique in combining this observation with validation from experts.

Details

Journal of Global Operations and Strategic Sourcing, vol. 17 no. 2
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 8 March 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The…

Abstract

Purpose

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The public–private partnership (PPP) model has been identified as an option to address the challenges in the power sector. The purpose of this research paper is to critically explore the reasons for entering into PPP power projects in Ghana by the public and private parties.

Design/methodology/approach

Questionnaires were used to elicit responses from respondents using a two-round Delphi survey. From 60 respondents contacted in round one, 48 responses were obtained, and these 48 respondents further took part in round two. Mean score ranking was used to rank the reasons for entering into PPP power projects, while analysis of variance (ANOVA) was run to test significant difference in perceptions among the respondents.

Findings

From round 2 of the Delphi survey, the significant reasons for public sector entering into PPP power projects were as follows: achieving improved value for money, access to additional capital, increased certainty of projects and greater efficiency of project delivery services. For private sector, most significant reasons were as follows: obtaining of investment support, improvement in private sector’s international image and synergy with public sector. From ANOVA analysis, there were significant different perceptions among some of factors on the respondent profile variables and the reasons for entering into PPP power projects, while other factors did not have significant different perception.

Originality/value

Significant reasons for both public and private sectors identified would be incorporated by the government when PPP policy guidelines and laws are reviewed. This will aid in the effective implementation of PPP for power projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 16 April 2024

Patrick Kraus, Elias Fißler and Dennis Schlegel

In recent years, the robotic process automation (RPA) technology has increasingly been used to automate business processes. While a lot of research has been published on the…

Abstract

Purpose

In recent years, the robotic process automation (RPA) technology has increasingly been used to automate business processes. While a lot of research has been published on the potential and benefits of the technology, only a few studies have conducted research on challenges related to RPA adoption. Hence, this study aims to identify and discuss challenges related to RPA implementation projects.

Design/methodology/approach

Following an inductive methodology, interviews have been conducted with consultants who were involved in multiple RPA implementation projects. Hence, their extensive experience and views contribute to a detailed and in-depth understanding of the phenomena under research.

Findings

The results suggest that there are various process-related, technical, resource-related, psychological and coordinative challenges that must be considered when conducting an RPA implementation project.

Originality/value

This paper contributes to knowledge by presenting a new typology of challenges, as well as providing an in-depth discussion of the individual challenges that organizations face.

Details

International Journal of Organizational Analysis, vol. 32 no. 11
Type: Research Article
ISSN: 1934-8835

Keywords

Article
Publication date: 8 June 2022

Oliver Tannor, Elvis Attakora-Amaniampong and Emmanuel Kanchebe Derbile

This study aims to assess the facilities management (FM) strategies used in multi-tenanted purpose-built office buildings (Mt-POBs) in Ghana and the drivers that influence the…

Abstract

Purpose

This study aims to assess the facilities management (FM) strategies used in multi-tenanted purpose-built office buildings (Mt-POBs) in Ghana and the drivers that influence the decision to use such strategies.

Design/methodology/approach

This study was conducted via a survey and key informant interviews. The survey was conducted using a questionnaire targeted at 65 multi-tenanted office building owners in the Greater Accra region. The data from the survey revealed the views of building owners on FM strategy and the extent to which 20 facility management decision drivers influenced their decisions to use a particular strategy and the responses were descriptively analysed. The key informant interviews were conducted among six leaders of the property owners’ association who use in-house FM to further understand their perspectives and decisions on using such strategy. The interviews were conducted over telephone using an interview guide and analysed using thematic analysis.

Findings

The results showed that 88% of Mt-POBs in Ghana are managed in-house. The results also showed that the decision to use the in-house strategy was driven by the innovative, strategic and cost-saving advantages associated with the in-house strategy.

Originality/value

This study shows the factors that drive the decision of multi-tenanted office building owners in Ghana to use the in-house strategy. The findings of this study will be useful for prospective owners of office buildings in Ghana.

Details

Journal of Facilities Management , vol. 22 no. 2
Type: Research Article
ISSN: 1472-5967

Keywords

1 – 10 of 151