Search results

1 – 10 of over 156000
Article
Publication date: 1 March 1999

Paul Beynon‐Davies, Douglas Tudhope and Hugh Mackay

In this paper we discuss some of the particular features of user involvement in information systems (IS) development projects with reference to the idea of the trajectory of…

268

Abstract

In this paper we discuss some of the particular features of user involvement in information systems (IS) development projects with reference to the idea of the trajectory of development being a political/cultural process. The main aim is to attempt to supply more depth to an understanding of the pragmatics of user involvement in IS development projects. We illustrate how in one particular project, differences in organisational sub‐cultures, and in particular the way in which the technology was ‘framed’, led to differences in the way in which an information system was conceived. These differences, in turn, contributed to elements of organisational conflict between stakeholder groups over the future trajectory of the IS development. We conclude with a critique of some generally held assumptions concerning user involvement.

Details

Journal of Systems and Information Technology, vol. 3 no. 1
Type: Research Article
ISSN: 1328-7265

Keywords

Article
Publication date: 1 February 1999

Dan Remenyi and Michael Sherwood‐Smith

Proposes a continuous participative evaluation process built on the formative evaluation paradigm. The benefits of this approach are that all the primary or core stakeholders…

4296

Abstract

Proposes a continuous participative evaluation process built on the formative evaluation paradigm. The benefits of this approach are that all the primary or core stakeholders, i.e. the users, top management and the technical specialists involved in the task of delivering information systems benefits, participate in the evaluation and the subsequent decision making associated with the project. These stakeholders are consequently involved in moulding and realising an information system which is targeted to meet real business needs rather than just investment and project management criteria. This approach ensures that high quality information systems that deliver direct business benefits with which the user community can identify are implemented. It implies a new focus that encompasses concentrating on and understanding the business issues and how the information system will deliver real value to the organisation. It is the view of the authors that formative evaluation can help to maximise business value from information systems.

Details

Logistics Information Management, vol. 12 no. 1/2
Type: Research Article
ISSN: 0957-6053

Keywords

Article
Publication date: 2 May 2023

Tsung-Sheng Chang

Artificial intelligence (AI) is the most progressive commodity among current information system applications. In-house development and sales of beneficial products are difficult…

Abstract

Purpose

Artificial intelligence (AI) is the most progressive commodity among current information system applications. In-house development and sales of beneficial products are difficult for many software development and service companies (SDSCs). SDSCs have some implicit concerns about implementing AI software development due to the complexity of AI technology; they require an evaluation framework to avoid development failure. To fill the void, this study identified the factors influencing SDSCs when developing AI software development.

Design/methodology/approach

Based on complex adaptive systems theory, three aspects were developed as the main factors of hierarchy, namely, employees' capabilities, environmental resources and team capabilities. Fuzzy analytic hierarchy process (FAHP) was used to assess the SDSCs' attitude. Based on SDSCs, attitudes toward implementing AI software projects were collected to calculate the hierarchy of factors.

Findings

The outcome of FAHP is used as understanding the key factors of SDSCs for selecting an AI software project, toward the improvement of overall project planning. Employees' stress resistance was considered as a priority for the project, although professional AI skills and resources were also important.

Originality/value

This study suggested three variables developed using complex adaptive systems. This study contributes to a better understanding of the critical aspects of developing AI software projects in SDSCs. The study's findings have practical and academic implications for SDSCs and subsequent academic development, broadening the scope of AI software development research.

Details

Journal of Enterprise Information Management, vol. 36 no. 4
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 1 December 2001

Jo Hanisch, Theerasak Thanasankit and Brian Corbitt

Requirements engineering is a crucial phase in software development. Software development in a virtual domain adds another dimension to the process of requirements engineering…

Abstract

Requirements engineering is a crucial phase in software development. Software development in a virtual domain adds another dimension to the process of requirements engineering. There has been growing interest in virtual teams, and more specifically in virtual software development. While structured software development methods are the obvious first choice for project managers to ensure a virtual software development team remains on track, the social and cultural aspects of requirements engineering cannot be ignored. These social aspects are especially important across different cultures, and have been shown to affect the success of an information system. The discussion in this paper is centred around the requirements engineering processes of a virtual team in a Thai Software House. This paper explains the issues and challenges of requirements engineering in a virtual domain from a social and cultural perspective. Project managers need to encourage a balance between structured methods and social aspects in requirements engineering for virtual team members. Cultural and social aspects influence the relationship between the virtual team and the client.

Details

Journal of Systems and Information Technology, vol. 5 no. 2
Type: Research Article
ISSN: 1328-7265

Keywords

Article
Publication date: 28 February 2022

Ebrahim Vatan, Gholam Ali Raissi Ardali and Arash Shahin

This study aims to investigate the effects of organizational culture factors on the selection of software process development models and develops a conceptual model for selecting…

Abstract

Purpose

This study aims to investigate the effects of organizational culture factors on the selection of software process development models and develops a conceptual model for selecting and adopting process development models with an organizational culture approach, using 12 criteria and their sub-criteria defined in Fey and Denison’s model (12 criteria).

Design/methodology/approach

The research hypotheses were investigated using statistical analysis, and then the criteria and sub-criteria were selected based on Fey and Denison’s model and the experts’ viewpoints. Afterward, the organizational culture of the selected company was measured using the data from 2016 and 2017, based on Fey and Denison’s questionnaire. Due to the correlation between the criteria, using the decision-making trial and evaluation technique, the correlation between sub-criteria were determined, and by analytical network process method and using Super-Decision software, the process development model was preferred to the 12 common models in information systems development.

Findings

Results indicated a significant and positive effect of organizational culture factors (except the core values factor) on the selection of development models. Also, by changing the value of organizational culture, the selected process development model changed either. Sensitivity analysis performed on the sub-criteria implied that by changing and improving some sub-criteria, the organization will be ready and willing to use the agile or risk-based models such as spiral and win-win models. Concerning units where the mentioned indicators were at moderate and low limits, models such as waterfall, V-shaped and incremental worked more appropriately.

Originality/value

While many studies were performed in comparing development models and investigating their strengths and weaknesses, and the impact of organizational culture on the success of information technology projects, literature indicated that the impact of organizational sub-culture prevailing in the selection of development process models has not been investigated. In this study, new factors and indicators were addressed affecting the selection of development models with a focus on organizational culture. Correlation among the factors and indicators was also investigated and, finally, a conceptual model was proposed for proper adoption of the models and methodologies of system development.

Article
Publication date: 20 August 2018

Hannan Khalid, Asim Noor, Javed Iqbal, Shahid Farid and Victor Chang

More and more governmental organizations are switching to information systems to enhance their operations and reduce cost but the development of these systems involves a lot of…

1199

Abstract

Purpose

More and more governmental organizations are switching to information systems to enhance their operations and reduce cost but the development of these systems involves a lot of challenges. This paper aims to find out the challenges that project managers have to face during the development of such systems and the practices they can adopt to address these challenges.

Design/methodology/approach

To identify the challenges, data have been gathered across six key project management areas. The six targeted key areas are project integration management, project scope management, project time management, project cost management, project human resource management and project communications management. The authors have coordinated with 11 managerial-level IT professionals using semi-structured interviews and have gone through their communication archives.

Findings

Findings prove that practices such as focusing on cost reduction, informal congregations, trainings and frequent communication between vendor and client help in addressing the challenges. Furthermore, learning from management experiences of the managers can assist managers in similar role to create a pattern of success while working with governmental projects.

Originality/value

The authors peek into the development life cycle of a public sector project named as prison information management system. The project has encountered numerous challenges and has been accomplished in significantly delayed time than designated.

Article
Publication date: 13 September 2011

Antti Nurmi, Petri Hallikainen and Matti Rossi

In large system development efforts organizational and managerial issues are often more challenging than technical ones. One of the key concerns of managers is the control and…

Abstract

Purpose

In large system development efforts organizational and managerial issues are often more challenging than technical ones. One of the key concerns of managers is the control and evaluation of the overall development effort. The purpose of this paper was to analyze the evaluation of system development process in a setting where there are multiple stakeholders in multiple organizations that develop a common information system (IS). The case is a consortium of universities that has developed a common student registrar system over a period of more than ten years.

Design/methodology/approach

The authors used a social process model to analyze the episodes and encounters in the system development and evaluation process. The research approach can be characterized as action case.

Findings

The authors found that in the early stages of system development the evaluation was emergent or even non‐existent. As the system was developed further and issues, such as delays and missing features, arose, there was a need for better control of the process. Thus, the evaluation process evolved through a series of critical encounters into a more proactive one.

Research limitations/implications

The authors studied only one case so broad generalizations directly from the case cannot be made. However, the results could hold true for similar settings. The authors believe that the results are interesting to both researchers and practitioners since in outsourcing relationships the consortium kind of arrangement is becoming more common.

Originality/value

The authors analyze the evolution of IS evaluation processes in a setting with multiple client and vendor organizations and reveal the complexities of system evaluation in such settings. Moreover, they introduce three new concepts: reactive, transitional and proactive evaluation processes. These concepts can help researchers and practitioners to better understand the nature of the IS evaluation processes and to possibly choose an evaluation approach that has a better “fit” with the development situation at hand.

Article
Publication date: 1 February 1989

Peter Axel Nielsen

Argues that a set of distinctions between methods for informationsystems development is useful for learning about the methods and theirrelation to practice. Examines three projects

Abstract

Argues that a set of distinctions between methods for information systems development is useful for learning about the methods and their relation to practice. Examines three projects conducted in three similar branches of the same bank. Evolves a set of distinctions: the context, the consequences and the conditions, for application of the models. Suggests areas of further research.

Details

Office Technology and People, vol. 5 no. 2
Type: Research Article
ISSN: 0167-5710

Keywords

Article
Publication date: 28 January 2014

Benny M.E. de Waal and Ronald Batenburg

The aim of this study is to debunk the relationship between user participation practices and the development and success of information systems/information technology…

2188

Abstract

Purpose

The aim of this study is to debunk the relationship between user participation practices and the development and success of information systems/information technology implementations. While most studies practically rely on how many participation activities are performed, the process through which users engage in user participation is not specified.

Design/methodology/approach

A mixed method approach was applied to study the research questions. A number of relationships were tested by survey data collected among 143 end-users and 49 interviews of employees of a large Dutch social insurance organization that implemented a new and integrative business process management (BPM) system.

Findings

The results show that specification of the participation context is of key importance for understanding the success of BPM implementation. Quantitative and qualitative analyses show that rich participation activities hold a stronger positive relationship with the BPM system development and implementation success than other participatory activities that only assist development or implementation. Furthermore, it is demonstrated that the updated theory of user participation by Markus and Mao can be turned into a useful instrument for measuring the different aspects of participation.

Originality/value

Most studies on user participation “only” measure how many participation activities were performed, and not how or why they were performed. Furthermore, the combination of qualitative and quantitative data and instruments resulted in a greater understanding of how exactly user participation was brought into practice and how the consequences of this practice were interrelated.

Article
Publication date: 6 February 2023

Tugba Gurcaylilar-Yenidogan and Dilek Erdogan

Based on a survey study of 138 software buyers in Turkey, this study examines conditional indirect effects of requirements uncertainty on supplier opportunism where buyer…

Abstract

Purpose

Based on a survey study of 138 software buyers in Turkey, this study examines conditional indirect effects of requirements uncertainty on supplier opportunism where buyer dependence, a proxy for relation-specific investments, undertakes a mediator role. The authors consider a two-level moderation effect of trust and contract in buyer–supplier relationships throughout the software project lifecycle.

Design/methodology/approach

A survey-based empirical study was conducted, and conditional process analyses were run using PROCESS macro in SPSS. The present study tests a two-stage moderated mediation model in which competence-based trust with a detailed contract setting moderates the mediational path from requirements uncertainty to buyer dependence.

Findings

The data obtained from the buyer side in the Turkish software industry showed that a relationship in which the buyer is structurally dependent begins at a high level of trust. On the other hand, the authors found that contractual rigidity fosters supplier opportunism ex-post in evolving process of the relationship.

Originality/value

This study contributes to project management literature by testing a two-level moderation effect of governance and the mediator role of buyer dependence in the relationship between requirements uncertainty and supplier opportunism. Moving differently from the previous studies, this study integrates contributions of both economic perspectives, such as resource dependence theory and transaction cost analysis, and relational perspectives into the information processing view.

Details

International Journal of Managing Projects in Business, vol. 16 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

1 – 10 of over 156000