Search results

1 – 10 of over 1000
Article
Publication date: 25 April 2024

Abdul-Manan Sadick, Argaw Gurmu and Chathuri Gunarathna

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is…

Abstract

Purpose

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is qualitative, posing additional challenges to achieving accurate cost estimates. Additionally, there is a lack of tools that use qualitative project information and forecast the budgets required for project completion. This research, therefore, aims to develop a model for setting project budgets (excluding land) during the pre-conceptual stage of residential buildings, where project information is mainly qualitative.

Design/methodology/approach

Due to the qualitative nature of project information at the pre-conception stage, a natural language processing model, DistilBERT (Distilled Bidirectional Encoder Representations from Transformers), was trained to predict the cost range of residential buildings at the pre-conception stage. The training and evaluation data included 63,899 building permit activity records (2021–2022) from the Victorian State Building Authority, Australia. The input data comprised the project description of each record, which included project location and basic material types (floor, frame, roofing, and external wall).

Findings

This research designed a novel tool for predicting the project budget based on preliminary project information. The model achieved 79% accuracy in classifying residential buildings into three cost_classes ($100,000-$300,000, $300,000-$500,000, $500,000-$1,200,000) and F1-scores of 0.85, 0.73, and 0.74, respectively. Additionally, the results show that the model learnt the contextual relationship between qualitative data like project location and cost.

Research limitations/implications

The current model was developed using data from Victoria state in Australia; hence, it would not return relevant outcomes for other contexts. However, future studies can adopt the methods to develop similar models for their context.

Originality/value

This research is the first to leverage a deep learning model, DistilBERT, for cost estimation at the pre-conception stage using basic project information like location and material types. Therefore, the model would contribute to overcoming data limitations for cost estimation at the pre-conception stage. Residential building stakeholders, like clients, designers, and estimators, can use the model to forecast the project budget at the pre-conception stage to facilitate decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2022

Ebrahim Vatan, Gholam Ali Raissi Ardali and Arash Shahin

This study aims to investigate the effects of organizational culture factors on the selection of software process development models and develops a conceptual model for selecting…

Abstract

Purpose

This study aims to investigate the effects of organizational culture factors on the selection of software process development models and develops a conceptual model for selecting and adopting process development models with an organizational culture approach, using 12 criteria and their sub-criteria defined in Fey and Denison’s model (12 criteria).

Design/methodology/approach

The research hypotheses were investigated using statistical analysis, and then the criteria and sub-criteria were selected based on Fey and Denison’s model and the experts’ viewpoints. Afterward, the organizational culture of the selected company was measured using the data from 2016 and 2017, based on Fey and Denison’s questionnaire. Due to the correlation between the criteria, using the decision-making trial and evaluation technique, the correlation between sub-criteria were determined, and by analytical network process method and using Super-Decision software, the process development model was preferred to the 12 common models in information systems development.

Findings

Results indicated a significant and positive effect of organizational culture factors (except the core values factor) on the selection of development models. Also, by changing the value of organizational culture, the selected process development model changed either. Sensitivity analysis performed on the sub-criteria implied that by changing and improving some sub-criteria, the organization will be ready and willing to use the agile or risk-based models such as spiral and win-win models. Concerning units where the mentioned indicators were at moderate and low limits, models such as waterfall, V-shaped and incremental worked more appropriately.

Originality/value

While many studies were performed in comparing development models and investigating their strengths and weaknesses, and the impact of organizational culture on the success of information technology projects, literature indicated that the impact of organizational sub-culture prevailing in the selection of development process models has not been investigated. In this study, new factors and indicators were addressed affecting the selection of development models with a focus on organizational culture. Correlation among the factors and indicators was also investigated and, finally, a conceptual model was proposed for proper adoption of the models and methodologies of system development.

Article
Publication date: 7 April 2022

Pierre Jouan and Pierre Hallot

The purpose of this paper is to address the challenging issue of developing a quantitative approach for the representation of cultural significance data in heritage information…

Abstract

Purpose

The purpose of this paper is to address the challenging issue of developing a quantitative approach for the representation of cultural significance data in heritage information systems (HIS). The authors propose to provide experts in the field with a dedicated framework to structure and integrate targeted data about historical objects' significance in such environments.

Design/methodology/approach

This research seeks the identification of key indicators which allow to better inform decision-makers about cultural significance. Identified concepts are formalized in a data structure through conceptual data modeling, taking advantage on unified modeling language (HIS). The design science research (DSR) method is implemented to facilitate the development of the data model.

Findings

This paper proposes a practical solution for the formalization of data related to the significance of objects in HIS. The authors end up with a data model which enables multiple knowledge representations through data analysis and information retrieval.

Originality/value

The framework proposed in this article supports a more sustainable vision of heritage preservation as the framework enhances the involvement of all stakeholders in the conservation and management of historical sites. The data model supports explicit communications of the significance of historical objects and strengthens the synergy between the stakeholders involved in different phases of the conservation process.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. 14 no. 3
Type: Research Article
ISSN: 2044-1266

Keywords

Article
Publication date: 19 December 2023

Faerozh Madli, Stephen Sondoh, Andreas Totu, Ramayah T., Yuzainy Janin, Sharifah Nurafizah Syed Annuar and Tat-Huei Cham

The shortage of organ donors is an under-researched global issue that demands immediate attention. This attention should begin at the government level and related organizations…

Abstract

Purpose

The shortage of organ donors is an under-researched global issue that demands immediate attention. This attention should begin at the government level and related organizations. In Malaysia, the shortage of organ donations has been a pressing issue faced by the Ministry of Health Malaysia (MOH) for a considerable length of time. In reaction to this issue, the MOH deployed the Organ Donation Awareness Strategic Campaign Plan by using the platform of social media to disseminate information regarding organ donation to the public. However, the number of registrations is still low among Malaysians. Moreover, the observation from the literature shows that there are limited studies which have been initiated to focus on social media in the context of organ donation campaigns.

Design/methodology/approach

The quantitative research design has been used to understand the issue. Three hundred and eighty-four completed questionnaires were collected from the target sample, which comprised university students in Malaysia. For this study, partial least squares structural equation modelling was used for data analysis.

Findings

The result shows that information usefulness is vital because it will lead individuals to adopt organ donation information on social media. More specifically, predictors that positively influence youth or university students to accept information as useful are visual information, information sharing, accessibility of information, needs of information and attitude towards information. Subsequently, information usefulness positively influences information adoption. In the meantime, information quality and credibility do not significantly affect information usefulness.

Practical implications

The findings of this study may assist MOH or interested parties in designing a sound marketing strategy in the context of organ donation promotion by providing empirical evidence.

Originality/value

The study provides empirical evidence about information characteristics in the context of organ donation promotion.

Details

International Journal of Pharmaceutical and Healthcare Marketing, vol. 18 no. 2
Type: Research Article
ISSN: 1750-6123

Keywords

Open Access
Article
Publication date: 13 September 2022

Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…

4131

Abstract

Purpose

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.

Design/methodology/approach

Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.

Findings

The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.

Originality/value

A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 29 April 2024

Qiuqi Wu, Youchao Sun and Man Xu

About 70% of all aircraft accidents are caused by human–machine interaction, thus identifying and quantifying performance shaping factors is a significant challenge in the study…

Abstract

Purpose

About 70% of all aircraft accidents are caused by human–machine interaction, thus identifying and quantifying performance shaping factors is a significant challenge in the study of human reliability. An information flow field model of human–machine interaction is put forward to help better pinpoint the factors influencing performance and to make up for the lack of a model of information flow and feedback processes in the aircraft cockpit. To enhance the efficacy of the human–machine interaction, this paper aims to examine the important coupling factors in the system using the findings of the simulation.

Design/methodology/approach

The performance-shaping factors were retrieved from the model, which was created to thoroughly describe the information flow. The coupling degree between the performance shaping factors was calculated, and simulation and sensitivity analysis are based on system dynamics.

Findings

The results show that the efficacy of human–computer interaction is significantly influenced by individual important factors and coupling factors. To decrease the frequency of accidents after seven hours, attention should be paid to these factors.

Originality/value

The novelty of this work lies in proposing a theoretical model of cockpit information flow and using system dynamics to analyse the effect of the factors in the human–machine loop on human–machine efficacy.

Details

Aircraft Engineering and Aerospace Technology, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1748-8842

Keywords

Article
Publication date: 28 February 2023

Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…

Abstract

Purpose

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.

Design/methodology/approach

Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.

Findings

Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.

Practical implications

This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.

Originality/value

This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 24 July 2023

Abhijit Thakuria, Indranil Chakraborty and Dipen Deka

Websites, search engines, recommender systems, artificial intelligence and digital libraries have the potential to support serendipity for unexpected interaction with information…

Abstract

Purpose

Websites, search engines, recommender systems, artificial intelligence and digital libraries have the potential to support serendipity for unexpected interaction with information and ideas which would lead to favored information discoveries. This paper aims to explore the current state of research into serendipity particularly related to information encountering.

Design/methodology/approach

This study provides bibliometric review of 166 studies on serendipity extracted from the Web of Science. Two bibliometric analysis tools HisCite and RStudio (Biblioshiny) are used on 30 years of data. Citation counts and bibliographic records of the papers are assessed using HisCite. Moreover, visualization of prominent sources, countries, keywords and the collaborative networks of authors and institutions are assessed using RStudio (Biblioshiny) software. A total of 166 papers on serendipity were found from the period 1989 to 2022, and the most influential authors, articles, journals, institutions and countries among these were determined.

Findings

The highest numbers of 11 papers were published in the year 2019. Makri and Erdelez are the most influential authors for contributing studies on serendipity. “Journal of Documentation” is the top-ranking journal. University College London is the prominent affiliation contributing highest number of studies on serendipity. The UK and the USA are the prominent nations contributing highest number of research. Authorship pattern for research on serendipity reveals involvement of single author in majority of the studies. OA Green model is the most preferred model for archiving of research articles by the authors who worked on serendipity. In addition, majority of the research outputs have received a citation ranging from 0 to 50.

Originality/value

To the best of the authors’ knowledge, this paper may be the first bibliometric analysis on serendipity research using bibliometric tools in library and information science studies. The paper would definitely open new avenues for other serendipity researchers.

Details

Information Discovery and Delivery, vol. 52 no. 2
Type: Research Article
ISSN: 2398-6247

Keywords

Article
Publication date: 26 January 2023

Afiqah R. Radzi, Nur Farhana Azmi, Syahrul Nizam Kamaruzzaman, Rahimi A. Rahman and Eleni Papadonikolaki

Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result…

Abstract

Purpose

Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result, industry professionals reject DT even in BIM-based construction projects due to reluctance to innovate. Furthermore, researchers have repeatedly developed tools and techniques with the same goals using DT and BIM to assist practitioners in construction projects. Therefore, this study aims to assist industry professionals and researchers in understanding the relationship between DT and BIM and synthesize existing works on DT and BIM.

Design/methodology/approach

A systematic review was conducted on published articles related to DT and BIM. A total record of 54 journal articles were identified and analyzed.

Findings

The analysis of the selected journal articles revealed four types of relationships between DT and BIM: BIM is a subset of DT, DT is a subset of BIM, BIM is DT, and no relationship between BIM and DT. The existing research on DT and BIM in construction projects targets improvements in five areas: planning, design, construction, operations and maintenance, and decommissioning. In addition, several areas have emerged, such as developing geo-referencing approaches for infrastructure projects, applying the proposed methodology to other construction geometries and creating 3D visualization using color schemes.

Originality/value

This study contributed to the existing body of knowledge by overviewing existing research related to DT and BIM in construction projects. Also, it reveals research gaps in the body of knowledge to point out directions for future research.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 4 May 2023

Zulma Valedon Westney, Inkyoung Hur, Ling Wang and Junping Sun

Disinformation on social media is a serious issue. This study examines the effects of disinformation on COVID-19 vaccination decision-making to understand how social media users…

Abstract

Purpose

Disinformation on social media is a serious issue. This study examines the effects of disinformation on COVID-19 vaccination decision-making to understand how social media users make healthcare decisions when disinformation is presented in their social media feeds. It examines trust in post owners as a moderator on the relationship between information types (i.e. disinformation and factual information) and vaccination decision-making.

Design/methodology/approach

This study conducts a scenario-based web survey experiment to collect extensive survey data from social media users.

Findings

This study reveals that information types differently affect social media users' COVID-19 vaccination decision-making and finds a moderating effect of trust in post owners on the relationship between information types and vaccination decision-making. For those who have a high degree of trust in post owners, the effect of information types on vaccination decision-making becomes large. In contrast, information types do not affect the decision-making of those who have a very low degree of trust in post owners. Besides, identification and compliance are found to affect trust in post owners.

Originality/value

This study contributes to the literature on online disinformation and individual healthcare decision-making by demonstrating the effect of disinformation on vaccination decision-making and providing empirical evidence on how trust in post owners impacts the effects of information types on vaccination decision-making. This study focuses on trust in post owners, unlike prior studies that focus on trust in information or social media platforms.

Details

Information Technology & People, vol. 37 no. 3
Type: Research Article
ISSN: 0959-3845

Keywords

1 – 10 of over 1000